Archirodon Construction Company Limited – Abu Dhabi Branch has engaged Velosi for carrying out HSE studies as a part of EPC for Salt Domes Exploration (Leaching Facility) at Jebel Dhanna

Archirodon Construction Company Limited – Abu Dhabi Branch has engaged Velosi for carrying out HSE studies as a part of EPC for Salt Domes Exploration (Leaching Facility) at Jebel Dhanna

Client
Archirodon
Date
20 June 2024
Our Role
Awarded

Archirodon Construction Company Limited – Abu Dhabi Branch has engaged Velosi for carrying out HSE studies as a part of EPC for Salt Domes Exploration (Leaching Facility) at Jebel Dhanna area as per ADNOC & International applicable standards.

The main objective of this project is to carry out Design, Procurement and Construction of the required facilities to allow the creation of two salt cavern with all associated facilities.

𝐀𝐬 𝐚 𝐫𝐞𝐬𝐮𝐥𝐭, 𝐕𝐞𝐥𝐨𝐬𝐢 𝐰𝐢𝐥𝐥 𝐝𝐞𝐯𝐞𝐥𝐨𝐩 𝐭𝐡𝐞 𝐟𝐨𝐥𝐥𝐨𝐰𝐢𝐧𝐠 𝐃𝐞𝐥𝐢𝐯𝐞𝐫𝐚𝐛𝐥𝐞𝐬:
• HAZID, ENVID and OHID Workshop Report
• HSEIA Screening Workshop Report
• ISD Review Workshop Report
• HAZOP Workshop Report
• SIL Determination & SIL Verification Study
• Energy Review Study
• SIMOPS Workshop Report
• PHSER (III) Workshop Report
• Constructability Review Workshop Report
• Plant Noise Study
• Marine Modeling Study
• Social Impact Assessment Report
• BAT Assessment
• Pollution Prevention and Control Compliance Report
• Waste Management Plan
• Construction Environmental Management Plan (CEMP)
• Environment Impact Assessment Report
• HSEIA Report

Enquire Now

Let us help you to provide the best solution for your asset !