Risk Based Inspection (RBI) and Remaining Life Assessment (RLA) for Equipment & Piping System and Upgradation of VAIL-Plant software from Desktop version to Web based application.
Scope
Risk Assessment of BUNDUQ static equipment and piping system and presents the objective of the study, the scope of work, the methodology applied and the analysis results as well as appropriate recommendations arising out of the study.
Process
A strict methodology was implemented during a comprehensive risk assessment on Bunduq static equipment and piping system, outlining the study’s objective, scope, methodology, analysis results, and providing actionable recommendations to enhance safety and reliability.
Outcome
Velosi’s team of expert individuals successfully carried out Risk Assessment by adopting a semi-quantitative approach in accordance with API-580/581, ADNOC references, and utilizing the VAIL-Plant software PEMS module.
Deliverables
Team Velosi developed the following deliverables:
- Development of Risk Based Inspection Methodology for Static Equipment and Piping Systems.
- Development of Corrosion Loops based on the operation data, P&ID and the previous study.
- Development of Risk Based Inspection Plan for Static Equipment and Piping Systems.
- Provision of VAIL-Plant Web application Package (Installation and Customization to BUNDUQ requirements)
- Data Migration Services to Web-application.
- User Acceptance Testing
- Go-Live