Our Experience

  • Preventative Maintenance Optimization
    Dolphin Energy Limited
    Qatar
    November 2016
  • Preparation of Asset register & FMECA based RCM Analysis including PMRs Development as Part of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    September 2015
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudi Arabia
    2015
  • Development & Implementation of Integrated Maintenance & Reliability System
    MURPHY
    Malaysia
    2014
  • RCM / RAM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 2
    Al-Khafji Joint Operations-KJO
    Saudi Arabia/ Oman
    2013
  • Reliability Centered Maintenance (RCM) / RAM Study “Supply”
    ENI PAKISTAN LIMITED.
    Pakistan
    July 2010
  • Reliability Centered Maintenance (RCM) Study
    Dubai Supply Authority (DUSUP)
    Dubai, UAE
    2010
  • RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 1
    Al-Khafji Joint Operations-KJO
    Saudi Arabia/ Oman
    2009
  • RCM analysis for hydrocracker and CCR units of Pertamina refinery.
    Pertamina Dumai refinery Indonesia.
    Indonesia
    2008
  • RCM study for compression and power stations
    Syrian Gas Dez Gas plant Syria.
    Syria
    2007
  • Development of Reliability Centered Maintenance (RCM) system for Belanak facilities (FPSO topsides, hull & wellheads)
    Conoco Philips Indonesia (COPI)
    Indonesia
    2007
  • RBI, RCM & RAM study for 32 nos. Storage Tanks
    Vopak Tanks Terminal Singapore
    Singapore
    2004
  • Asset Integrity Management System for TANAP Project
    TANAP
    Turkey
    In Progress
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    In Progress
  • Pipeline Integrity Management Program
    SNGPL
    Pakistan
    November 2017
  • Risk Based Inspection of stationery equipment at Sui Field Location
    Pakistan Petroleum Limited (PPL)
    Pakistan
    November 2017
  • Risk Based Inspection (RBI) Program Implementation
    BRUNEI METHANOL COMPANY SENDIRIAN BERHAD
    Sungai
    In Progress
  • Provision of Pipeline Risk Based Assessment For PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    February 2018
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    January 2015