Our Experience

  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudi Arabia
    2015
  • Reliability Centered Maintenance (RCM) Study for Unit 13 in Hydroskimmer Plant at Ruwais Refinery
    TAKREER
    United Arab Emirates UAE
    2015
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Development & Implementation of Integrated Maintenance & Reliability System
    MURPHY
    Malaysia
    2014
  • RCM / RAM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 2
    Al-Khafji Joint Operations-KJO
    Saudi Arabia/ Oman
    2013
  • Reliability Centered Maintenance (RCM) Study
    Dubai Supply Authority (DUSUP)
    Dubai, UAE
    2010
  • RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 1
    Al-Khafji Joint Operations-KJO
    Saudi Arabia/ Oman
    2009
  • RCM analysis for hydrocracker and CCR units of Pertamina refinery.
    Pertamina Dumai refinery Indonesia.
    Indonesia
    2008
  • Development of Reliability Centered Maintenance (RCM) system for Belanak facilities (FPSO topsides, hull & wellheads)
    Conoco Philips Indonesia (COPI)
    Indonesia
    2007
  • RCM study for compression and power stations
    Syrian Gas Dez Gas plant Syria.
    Syria
    2007
  • RBI, RCM & RAM study for 32 nos. Storage Tanks
    Vopak Tanks Terminal Singapore
    Singapore
    2004
  • APMP (Asset Performance Management Program) Study for RAS TANURA – Clean Fuels Project for Saudi Aramco
    Saudi Aramco/Technicas Reunidas
    Saudi Arabia/ Spain
    On Going
  • Preventative Maintenance Optimization
    Dolphin Energy Limited
    Qatar
    November 2016
  • Consultancy Services for Remaining Life Assessment & Fitness for Service Study
    Qatar Fertilizer Company (QAFCO)
    Qatar
    September 2024
  • Frame Work Agreement for Supply of Integrity Management Systems Additional Modules for – PSVMS & EIRMS
    Dragon Oil Turkmenistan Limited
    UAE & Turkmenistan, HAZAR Site
    March 2019
  • Preparation of Asset register & FMECA based RCM Analysis including PMRs Development as Part of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    September 2015
  • Reliability Centered Maintenance Study as part of AIMS for EPC for Rumaitha Thamama Zone B Phase – III Expansion & Phase-I VRC Replacement Project
    Al Asab General Transport & Contracting L.L.C/ ADNOC Onshore
    United Arab Emirates UAE
    July 2022
  • Criticality Analysis, FMEA, RCM & RBI Studies for HASSI MESSAOUD Upside North Project
    JGC Corporation (Japan/ Algeria) & SONATRACH (Algeria)
    Japan & Algeria
    March 2020
  • RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
    OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)
    United Arab Emirate - UAE/OMAN
    June 2021
  • Continuous Reliability Improvement Program (Phase-3)
    MARAFIQ Power & Water Utility Company for Jubail and Yanbu, Saudi Arabia
    Saudi Arabia
    March 2020
  • Reliability Centered Maintenance Study as part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
    Al Asab General Transport & Contracting L.L.C/ ADNOC Onshore
    United Arab Emirates UAE
    May 2021
  • 1
  • 2