Bilfinger Tebodin Middle East has awarded a contract to Velosi for the study of Material Selection, Chemical Injection Tie-ins and corrosion inhibitor dosage rates.

Bilfinger Tebodin Middle East has awarded a contract to Velosi for the study of Material Selection, Chemical Injection Tie-ins and corrosion inhibitor dosage rates.

Date
February 13, 2024
Our Role
Awarded

Velosi’s team will conduct a material selection study for 13 packages in the BAB and NEB areas of ADNOC. Furthermore, Velosi will provide recommendations for chemical injection locations and the suitable dosage rates of chemicals for oil-producing wells and water supply wells to prevent corrosion in the flow lines and the downstream pipings/equipment.

𝐓𝐞𝐚𝐦 𝐕𝐞𝐥𝐨𝐬𝐢 𝐰𝐢𝐥𝐥 𝐜𝐨𝐦𝐩𝐥𝐞𝐭𝐞 𝐭𝐡𝐞 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 𝐛𝐲 𝐢𝐬𝐬𝐮𝐢𝐧𝐠 𝐭𝐡𝐞 𝐟𝐨𝐥𝐥𝐨𝐰𝐢𝐧𝐠 𝐝𝐞𝐥𝐢𝐯𝐞𝐫𝐚𝐛𝐥𝐞𝐬
• Material Selection and Corrosion Control Report for Oil Producing Wells
• Material Selection and Corrosion Control Report for WAG/WI Wells
• Material Selection and Corrosion Control Report for Water Supply Wells
• Standardization Report for Standard Material Selection
• Material Validation Report
• Corrosion Management Manual
• Material Selection Diagrams
• Chemical Dosage Reports for Oil Producing Wells
• Chemical Dosage Reports for Water Supply / Water Disposal Wells
• Material Selection & Corrosion Control Philosophy
• Corrosion Monitoring Philosophy
• Chemical Treatment Philosophy

Enquire Now

Let us help you to provide the best solution for your asset !