Samsung Engineering Co., Ltd. assigned Velosi for the “RBI (Risk Based Inspection) Study for thr Jafurah GPF Project

Samsung Engineering Co., Ltd. assigned Velosi for the “RBI (Risk Based Inspection) Study for Jafurah GPF Project

Date
January 18, 2024
Our Role
Awarded

The main objective of the project is to perform Risk Based Inspection (RBI) assessment for the Jafurah GPF Project of Saudi Aramco that complies with the latest editions of API 580 and API 581. The assessment will be performed with API RBI software in accordance with SAEP-343.

The Risk Based Inspection (RBI) assessment, On-Stream Inspection (OSI) program and Corrosion Management Program (CMP) will be developed for Static Equipment, Piping System and PZVs within two (2) trains of Gas Processing at the Jafurah GPF.

𝐕𝐞𝐥𝐨𝐬𝐢 𝐰𝐢𝐥𝐥 𝐝𝐞𝐯𝐞𝐥𝐨𝐩 𝐭𝐡𝐞 𝐟𝐨𝐥𝐥𝐨𝐰𝐢𝐧𝐠 𝐝𝐞𝐥𝐢𝐯𝐞𝐫𝐚𝐛𝐥𝐞𝐬:
• Corrosion Loop Drawings
• Inventory Group Drawings
• RBI Assessment using API RBI Software
• RBI Study Report
• On-Stream Inspection Program
• Corrosion Control Document (CCD)

Enquire Now

Let us help you to provide the best solution for your asset !