INTEGRITY AND REMAINING LIFE ASSESSMENT (RLA) OF HP BOILER AT RUWAIS REFINERY (EAST)

ADNOC Refining hired Velosi to carry out Integrity and Remaining Life Assessment in one of the Boiler (Tag No. 421-B-001C) of their Refinery Unit Plant at Ruwais Refinery East in Abu Dhabi to identify all necessary mitigations to maintain operation's safety.
Objective
Velosi performed Integrity and Remaining Life Assessment, identified integrity-related issues, and provided recommendations to ensure continuous safety and uninterrupted operation at least for the next 10 years.
Scope of Work
- Condition Assessment Study and Remaining Life Assessment study
- Analyze the data collected and predicting the Residual Life of the boiler for reliable and safe operation
- Recommending specific corrective actions and predictive maintenance actions to restore/increase the useful service life of the boiler
- Predict expected life after implementation of the recommended actions
Deliverables
- Remaining Life Assessment Study Report including:
- Destructive and Non Destructive examination results
- Integrity Assessment of the Boiler components
- Visual Inspection
- NDT Reports
- In-Situ Metallography Inspection
- Deposit Scale Analysis
- Fiber Optic Inspection
- Tube Sample Tests
- Remaining Life Assessment Calculations and Results of all Components
- Recommendations for a Safe Operation of the Boiler