Our Experience

  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-03 Inspect ability, Operability & Maintainability Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • Indoor Air Quality Monitoring
    BURCHARDT
    Switzerland
    2020
  • Project No: 9600041408 Design & Drawing Review for Three (03) Number MEDS skids
    GGME
    Dubai, UAE
    2020
  • One ERP EAM Interface Development
    Abu Dhabi National Oil Company (ADNOC)
    UAE
    2020
  • Provision of Third Party Approval of Conceptual Package of LPG Installation work for The British School Al Khubairat, Plot No. 73, West 24_2 Abu Dhabi, UAE.
    DEWAN Architects + Engineer
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing Of their Workshop Premises
    AL GHAZAL TRANSPORT
    Abu Dhabi, UAE
    2020
  • Asset Integrity Management System for TANAP Project
    TANAP
    Turkey
    2020
  • Environmental Monitoring & Testing for ETIHAD Rail Stage 2&3 projects
    CRCC-GTGC JV
    Dubai, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP) for Shams Development District Cooling
    ADC Energy Systems
    Dubai , UAE
    2020
  • Terrestrial Survey for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
    Ministry of Infrastructure/ Core Engineering Consultancy
    Abu Dhabi, UAE
    2020
  • Ambient Air Quality Monitoring
    AL HOLLA CONCRETE TECHNOLOGY COMPANY (CONTECH)
    Dubai, UAE
    2020
  • RE-HAZOP for ADCOP Facilities
    Abu Dhabi National Oil Company (ADNOC) Onshore
    United Arab Emirates UAE
    2019
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Al Raha Beach Building – Plot RBW-06, Abu Dhabi
    Al Khail  Engineering
    Abu Dhabi, UAE
    2019
  • HSE Studies as per ADNOC Project Specification for BUNDUQ
    Target Engineering Construction Company L.L.C.
    United Arab Emirates UAE
    2019
  • Construction Environmental Management Plan for Saadiyat DCP1-Electrical Substation” project
    ADC Energy
    Dubai, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019
  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Environmental Baseline Survey of Dubai Site To perform the following study; Ambient Air Quality including Dust
    RTA/ Western Bainoona Group.
    Abu Dhabi, UAE
    2019