  • Quantitative Risk Assessment (QRA) Study for staff accommodation for BP-BADIN & Bukhari Facilities Pakistan.
    BP-Pakistan
    Pakistan
    2008
  • Quantitative Risk Assessment (QRA) Study for LNG Terminal for Port Qasim Pakistan
    Port Qasim Authorities
    Pakistan
    2008
  • Quantitative Risk Assessment (QRA) Study for Natural Gas pipeline for power gas KL Malaysia.
    Power Gas - Malaysia
    Malaysia
    2006
  • Quantitative Risk Assessment (QRA) Study for SAJA Gas natural gas pipeline Sharjah.
    SAJA GAS- Sharjah
    United Arab Emirates UAE
    2006
  • Quantitative Risk Assessment (QRA) Study for Natural Gas supply Network for SIMB Gas Singapore
    SIMB GAS Singapore
    Singapore
    2004
  • QRA, HAZARD, DROP OBJECT, Job HAZARD ANALYSIS, EMERGENCY MANAGEMENT Plan studies for BP NAM CON SON Vaietnam
    BP VIETNAM
    Vietnam
    2003
  • Quantitative Risk Assessment (QRA) Study for living Quarters of Balal platform of Balal field development project Iran.
    NIOC-IRAN
    IRAN
    2002
  • QRA, HAZARD, DROP OBJECT, Job HAZARD ANALYSIS, EMERGENCY MANAGEMENT Plan studies for BALAL Field development project Total FINAl ELF IRAN
    Total FINA ELF IRAN
    IRAN
    2002
  • Provision of Third Party Approval for Detailed Design Package of NG/ SNG Installation Pipe work for Five Star Hotel located at Plot No. C104B_02, Sector E16_02, Abu Dhabi, UAE
    Architectural Consulting Group, ACG
    Abu Dhabi, UAE
    2021
  • Provision of TPI Review and Approval of Hot Tapping on 8” Header with Branch Size 8” Sch 40.
    Cloud Energy Gas
    Dubai, UAE
    2021
  • Verification of Design of Temporary Supports for 36” Pipeline
    Granite Construction Company WLL
    Abu Dhabi, UAE
    2021
  • Provision of Third Party Approval for Detailed Design and Pre-Commissioning Package of NG/ SNG Installation Pipe work for Residential Building (P-330 & P-346), Al Raha Beach District, Abu Dhabi.
    Arabian Unigaz
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval of Conceptual Package of LPG Installation work for The British School Al Khubairat, Plot No. 73, West 24_2 Abu Dhabi, UAE.
    DEWAN Architects + Engineer
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval of detailed design package and Pre-Commissioning package of NG/ SNG Installation Pipe work.
    Altorath International Engineering Consultants LLC
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Al Raha Beach Building – Plot RBW-06, Abu Dhabi
    Al Khail  Engineering
    Abu Dhabi, UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG / SNG Pipework Installation at Residential Building Plot C28, Sector E_48, Abu Dhabi
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Mixed used Building On Plot No. 28, Sector No. RBW-2, Al Raha Beach, Abu Dhabi.
    BEAD Architects
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Approval of Conceptual DESIGN STAGE of NG Pipe Work at Plot 11, sector RBW-2, Al-Raha, Abu Dhabi
    MAKAN Consulting
    Abu Dhabi, UAE
    2018
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG and SNG Pipework Installation at Residential Building, Sector RBW-7, Plot C-10, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018