Binh Son Refinery and Petrochemical JSC in Quang Ngai, Vietnam has awarded a contract to Velosi to perform the RBI Re-assessment and Integrity Operation Window (IOW) Development

Date
July 3, 2022
Our Role
Completed

Binh Son Refinery and Petrochemical JSC in Quang Ngai, Vietnam has awarded a contract to Velosi to perform the RBI Re-assessment and Integrity Operation Window (IOW) Development for all the Units of Binh Son Refinery.

Velosi’s technical team will efficiently perform the Risk-Based Inspection Re-assessment by providing a detailed study of corrosion loops, PoF, and CoF re-assessment based on the latest inspection and modification records by utilizing the existing RBI system (VAIL-Plant Software) which is implemented at BSR. This will be efficiently implemented by revisions and implementing changes where necessary.

Velosi team will systematically execute the Integrity Operation Window (IOW) development process by identifying the level of the IOW (Critical, Standard, or Informational) by following a Risk Ranking process, reviewing the existing mechanical design conditions, and prior operating conditions, establishing upper and lower limits to avoid objectionable damage/mechanism rates, and further comparing and predicting predefined action plan in case of IOW exceedance with proper revisions and alternatives where appropriate.

Team Velosi will complete the project by executing the following deliverables:

  • An RBI study report
    • Integrity Operation Windows (IOW)
    • Inspection guidelines
    • Effective inspection plan
    • Inspection drawings with marked up CMLs
RBI Re-assessment and Integrity Operation Window (IOW) Development

Let us help you to provide the best solution for your asset !