TASK ORDER NO. 1 FOR AS-BUILT SERVICES FOR VARIOUS OFFSHORE FMPS & ISS
Objective
The objective involved was to provide the services of capable, experienced, qualified personnel, requisite engineering tools/softwares and resources to update available “as-built” of onshore, offsite and offshore facilities engineering documents, drawings and databases provided by EPC contractors such as 2D drawings, smart plant P& IDs, PDS/PDMS 3D models and instrumentation in INtools to incorporate subsequent modifications carried out through Facilities Modifications Proposals (FMPs) and Red-Lined Markups received from in-house implementation, implementation through Construction Contractors and other projects. These services are required to periodically capture ‘as-built’ information to keep existing databases and key documentations like P&IDs, Plot plans, Cause & Effects, etc up to date and consistent with the plant in operation which is the key for DEL’s operational integrity.
Scope of Work
The scope of work included:
- Drafting – updating red-line markups on existing 2D Drawings, Microsoft Word, Excel, Visio documents.
- Updating and creating PDS/ Smartplant INtools & P&ID / PDMS.
- PDS /Smartplant/ PDMS work (database updating / drawing extraction etc.)
- INtools Instrumentation work.
- Scanning hardcopy drawings/ documents in intelligent pdf format which should be accessible, searchable on any portion of the file.
- Converting from PDF/ raster drawings to AutoCAD/ Microstation formats as requested.
- Creation of new AutoCAD / Microstation drawings as requested.
Deliverables
Velosi successfully submitted the following deliverables:
- Utility and Process Flow Diagram
- Plot Plan and Equipment Layout
- Line List
- Isometric / Spooling Drawing
- Wiring and Loop Diagram
- Instrument Index
- Hookup Diagram
- Piping & Instrumentation Diagram
- Equipment List
- Mechanical Datasheet
- Cause and Effect Diagram
- Instrument Datasheet
- I/O List
- SPI INtools Database