SUPPLY & MANAGEMENT OF INTEGRITY MANAGEMENT SERVICES FOR ABB-60 (GAS PROCESSING PLANT AND 60 WELLS WITH ASSOCIATED FLOW/EXPORT LINES)
Objective
To establish a comprehensive Integrity Management System (IMS) for OOCEP to ensure the integrity of assets in ABU TUBUL Block 60.
To carry out a baseline survey of critical assets to efficiently analyze the risks involved and optimize the development of inspection plan for integrity management assurance.
Scope of Work
The scope of work includes the following:
- Baseline Survey for Equipment and Piping systems.
- Development of an RBI strategy to assess risk and prioritize high risk systems to minimize invasive inspection.
- Establish a comprehensive RBI program and FMECA study based on best practices and industrial standards to effectively manage corporate assets, including Static Equipment & Piping, Pipelines and Pressure Safety Valves.
- Development of Strategy Documents
- Report findings and
- Review of an inspection plan for continuous improvement and optimization
Asset Count:
Deliverables
Velosi submitted the following deliverables for Equipment & Piping:
- Baseline Survey Reports
-
- Visual Inspection
- UT Gauging
- UT Scanning
-
- RBI Report for Equipment & Piping
-
- Corrosion Loop Drawings
- Inventory Group Drawings
- Inspection Plan
- RBI Report
-
- RBI Report for Pipeline
-
- Section Layout drawings
- Inspection Plan
- RBI Report
-
- Strategy Documents