Risk Based Inspection Program Development for Petronas FLNG 1 (L) LTD. Topside structure and Hull
Objective
Establish a Risk Based Inspection (RBI) Program for Topside Structure Including Turret, Hull Structure Including Cargo Tanks, mooring system and flexible riser by carrying out comprehensive risk analysis.
Integration of recommended RBI IRP with class survey requirement including endorsement/approval from current Class Society.
Scope of Work
The scope of work for the Risk Based Inspection Program Development for Petronas FLNG 1 (L) LTD Topside structure and Hull Structure:-
- Topside Structure Including Turret
- Hull Structure Including Cargo Tanks
- Mooring System
- Flexible Riser
- RBI Software
VAIL Plant Software:
RBI Software Package for risk assessment and recording of RBI data including inspection plan with database which shall be valid throughout the FLNG1 design life.
Asset Count:
Deliverables
Velosi successfully submitted following deliverables:
-
Risk Based Inspection Program:
- Comprehensive RBI Study for Topside Structure.
- Tag Marked Drawings for SIMS and HIMS.
- Failure Rate and Risk Allocation
- RBI Report with results and conclusions.
- Recommendation on additional safeguards and action(s) where required.
- Inspection plan comprising of inspection method, coverage and frequency.
-
VAIL Plant Software Modules:
- SIMS – Structure Integrity Management System
- HIMS – Hull Integrity Management System
- ISMS – Inspection Scheduling Management System
- Integration of VAIL-Plant Software with SAP