Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
Velosi was hired by Hannover Consulting Engineers to perform design review of NG pipe network for construction of a building at Sector RBW-7, Plot C25, Al-Raha Beach, Abu Dhabi.
Objective
To perform the Risk Based Inspection and Integrity Studies for 213 Pipelines belonging to the inventory of PETRONAS CARIGALI.
Scope of Work
- Perform screening and initial risk assessment.
- Perform the detailed risk based inspection assessment on the pipelines identified in screening and initial assessment and determine the integrity of the assets
- Update the Corrosion Management Plan based on the results of the RBI Assessment
- Provide Detailed RBI Reports for the pipelines on which RBI was performed detailing the various damage mechanisms acting on the pipeline and provide the remaining life for them.
Deliverables
Following deliverables were successfully submitted to Petronas
- Screening and initial assessment
- Detailed Assessment Report inclusive of
- Section Division Drawing
- Detailed Assessment Calculation
- Integrity Management Plan
- Integrity Management Plan
Velosi utilized its own SAP/EXIDA VAIL-Plant Software (PIMS-OFFSHORE) to complete the screening and detailed risk assessment