Our Experience

  • Conceptual, FEED & Basic for Sawan gas field revamping project. Including piping stress analysis.
    OMV
    Abu Dhabi
    2008
  • Sress analysis of Pipeline Riser for South Pars Gas field Development phases 15 & 16 by using (CAESAR II Software)
    IOEC-IRAN
    IRAN
    2008
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO. (ASAB – 1 & ASAB – 2)
    GASCO
    United Arab Emirates UAE
    2008
  • Condition Assessment and Remnant Life Assessment of Structure for KJO Workshop facilitiy
    Al-Khafji Joint Operations-KJO
    Saudi Arabia
    2008
  • Condition Assessment and Remnant Life Assessment for Shell Port Dickson Equipment Foundations & workshop facilities structure.
    Shell Port Dickson Kuala Lumpur
    Malaysia
    2008
  • RCM analysis for hydrocracker and CCR units of Pertamina refinery.
    Pertamina Dumai refinery Indonesia.
    Indonesia
    2008
  • Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
    BP Pakistan
    Pakistan
    2008
  • Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
    BP Pakistan
    Pakistan
    2008
  • Quantitative Risk Assessment (QRA) Study for staff accommodation for BP-BADIN & Bukhari Facilities Pakistan.
    BP-Pakistan
    Pakistan
    2008
  • Quantitative Risk Assessment (QRA) Study for LNG Terminal for Port Qasim Pakistan
    Port Qasim Authorities
    Pakistan
    2008
  • Stress analysis of Hydraulic oil piping of BIJUPURA Salama FPSO.
    Petrobrass - Brazil
    Singapore
    2007
  • Condition Assessment for BP-Pakistan Equipment Foundation
    BP-Pakistan (BADIN Operations)
    Pakistan
    2007
  • Remnant Life Assessment for Petronas Melaka refinery complex Equipment Foundations & workshop facilities structure.
    PETRONAS-Melaka Refineries I & II Kuala Lumpur
    Malaysia
    2007
  • RCM study for compression and power stations
    Syrian Gas Dez Gas plant Syria.
    Syria
    2007
  • Development of Reliability Centered Maintenance (RCM) system for Belanak facilities (FPSO topsides, hull & wellheads)
    Conoco Philips Indonesia (COPI)
    Indonesia
    2007
  • API 579 FFS Level III Study for HP Amine Absorber 33V101
    Abu Dhabi Gas Industries Ltd (GASCO)
    Abu Dhabi, UAE
    2007
  • Fitness for Service study – Amine Regenerator (13-C-102)
    Abu Dhabi Gas Industries Ltd (GASCO)
    United Arab Emirates UAE
    2007
  • Amine Regenerator Reflux drum Inlet Pigging Piping 30-1010-AS
    Abu Dhabi Gas Industries Ltd (GASCO)
    United Arab Emirates UAE
    2007
  • GASCO Fitness for Service for pure pentane storage drum GASCO-(7-C-410) Ruwais Plant
    Abu Dhabi Gas Industries Ltd (GASCO)
    United Arab Emirates UAE
    2007
  • Technical Audit of Sui Nothern Gas Pipelines Limited
    Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    2007