Our Experience

  • Consultancy Services for Mechanical Design Review of New Office Building at G-5/2, Islamabad
    State Bank of Pakistan
    Pakistan
    January 2018
  • Development of Reliability, Availability and Maintainability Model (RAM) as part of AIMS Services for EPC for BAB 485 MBS Sustainable Facilities Project
    Archirodon Construction (Overseas) Co. Ltd/ADNOC Onshore
    United Arab Emirates UAE
    December 2021
  • Process Safety Management (PSM) Evaluation & Benchmarking Study at PPL
    Pakistan Petroleum Limited
    Pakistan
    March 2018
  • BeAAT Expansion Project – Project No. 5649 Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    ADNOC Refining
    United Arab Emirates UAE
    April 2020
  • First Call Out No. 1 for Development of Asset Integrity Dashboard User Manual as part of Agreement for Asset Integrity Consultancy Studies and Technical Support Services on Call out Basis
    Abu Dhabi National Oil Company (ADNOC)
    United Arab Emirates UAE
    October 2020
  • SIL STUDY AND VERIFICATION OF AMMONIA AND AN PLANT
    Fatima Fertilizer Company Limited
    Pakistan
    In Progress
  • Development of CMMS for Offshore EPRS Project
    Dolphin Energy Limited, UAE
    United Arab Emirates UAE
    April 2020
  • Risk Based Inspection (RBI) Study
    TECHNIP
    Abu Dhabi, UAE
    In Progress
  • Development of Asset Integrity Dashboard User Manual
    Abu Dhabi National Oil Company (ADNOC)
    United Arab Emirates UAE
    In Progress
  • Integrity and Remaining Life Assessment (RLA) of Boiler (121-B-01) at Ruwais Refinery East
    Abu Dhabi National Oil Company (ADNOC) Refining
    Abu Dhabi, UAE
    October 2019
  • Risk Based Inspection (RBI) Study As Per Saep-343 For Hawiyah Gas Plant Expansion Project Hawiyah Saudi Arabia
    SAIPEM
    Saudi Arabia
  • Developing and Updating Hazardous Area Classification (HAC) Drawing for Ruwais Refinery and Abu Dhabi Refinery.
    TAKREER
    Abu Dhabi, UAE
    February 2011
  • Consultancy Services for the production of three dimensional as-built drawings of IBM facility, Karachi
    IBM
    Pakistan
    Completed
  • SUPPLY OF EMERGENCY SHUTDOWN & BLOWDOWN VALVES
    M.K International
    Pakistan
  • Hiring Consultancy Services for Survey, Design and Supervision for Upgrading of Fire Fighting Systems for State Life Buildings All Over Pakistan
    State Life
    Pakistan
    July 2016
  • Preparation of Operation and Maintenance Manual for Haliba Field Development Project, Abu Dhabi
    L & T / Al Dhafra Petroleum Company Limited
    United Arab Emirates UAE
    June 2019
  • Asset Integrity Management Services
    TANAP
    Turkey
  • Provision of Manpower Services to Petronas Gas Berhad, Gas Processing Unit Division ( GPU)
    Petronas Gas Berhad – Gas Processing
    Malaysia
    August 2017
  • SIL & Integrity Verification for Single Wellhead Platforms EB-1, EB-4 & EB-8 Pipelines
    Bunduq Company Limited
    Abu Dhabi, UAE
    November 2014
  • Service provider will perform a risk based inspection (RBI) assessment on Eastern Region Distribution Department (ERDD) facility at Dhahran X-14 Tank Farm that complies with the latest edition of API 580 and API 581.
    Saudi Aramco
    Saudi Arabia
    December 2011
  • Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
    Bashayer Pipeline Company (BAPCO)
    Sudan
    In Progress