Our Experience

  • Frame Work Agreement for Supply of Integrity Management Systems Additional Modules for – PSVMS & EIRMS
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2020
  • Asset Integrity Management System for TANAP Project
    TANAP
    Turkey
    2020
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    2020
  • VAIL-Plant® Annual Support/Maintenance and Modifications
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2019
  • The Study of Classification of Security Levels Integrities (SIL) All Instrumented Functions Safety Complex GL1Z, GL2Z, GL1K, GP2Z and GP1Z
    SONATRACH
    Algeria
    2019
  • Integrity Management Software Deployment
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2018
  • Risk Based Inspection of stationery equipment at Sui Field Location
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2018
  • Risk Based Inspection (RBI) Program Implementation
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    2018
  • Corrosion Management Program & RBI Study (Project 6285) for Fabrication And Installation Of (Sfny, Zulf And Brri) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
    National Petroleum Construction Company (NPCC)
    United Arab Emirates UAE
    2018
  • Supply of Software & Personnel for Material Tracking
    KJO (Al Khafji Joint Operations)
    Saudi Arabia
    2017
  • Pipeline Integrity Management Program
    Sui Northern Gas Pipeline Limited (SNGPL)
    Pakistan
    2017
  • Safety Integrity Level Assessment & Verification for Ammonia and LPG Circuits for Unilever ICF
    UNILEVER PAKISTAN LIMITED
    Pakistan
    2017
  • SIL (Safety Integrity Level) Study for Three Boilers and Boiler House.
    GSK
    Pakistan
    2017
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
    LukOil Middle East Ltd.
    Iraq
    2017
  • Provision of Asset Integrity Management Services for Block-60
    Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    2017
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    LukOil Middle East Ltd.
    Iraq
    2016
  • SIL Study for All Operating Units at QP Refinery , Mesa
    Qatar Petroleum
    Qatar
    2015
  • Risk Based Inspection Study (RBI) for Dolphin Energy Limited
    Dolphin Energy Limited,
    Qatar
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    2015
  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudia Arabia
    2015