Our Experience

  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Al Raha Beach Building – Plot RBW-06, Abu Dhabi
    Al Khail  Engineering
    Abu Dhabi, UAE
    2019
  • HSE Studies as per ADNOC Project Specification for BUNDUQ
    Target Engineering Construction Company L.L.C.
    United Arab Emirates UAE
    2019
  • Construction Environmental Management Plan for Saadiyat DCP1-Electrical Substation” project
    ADC Energy
    Dubai, UAE
    2019
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019
  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Environmental Baseline Survey of Dubai Site To perform the following study; Ambient Air Quality including Dust
    RTA/ Western Bainoona Group.
    Abu Dhabi, UAE
    2019
  • Project No: 003056-Rev-01 Third Party Certification for the Surge Vessel Capacity Calculation
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2019
  • Environmental Monitoring & Testing Following study are part of the scope; Indoor Air Quality
    Al Khaznah Tannery
    Abu Dhabi, UAE
    2019
  • Project No: LPO159308 Provision for “Third party consultancy investigative study for the damage to existing boundary walls”
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • VAIL-Plant® Annual Support/Maintenance and Modifications
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2019
  • Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
    SONATRACH
    Algeria
    2019
  • Environmental Monitoring & Testing of JAFZA Facility Following study are part of the scope; Indoor Air Quality without Dust
    Express Pack Print
    Abu Dhabi, UAE
    2019
  • Provision of Services on implementing Hazard and Operability Analysys (HAZOP Analysis) at UCS1, and UKMS Stations of Bukhara MGMC
    Asia Trans Gas
    Uzbekistan
    2019
  • Project No: LPO-160518 Design Verification of the Trench Sheeting Shoring System
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • Variation Order for Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
    Qatar Petroleum
    Qatar
    2018
  • Provision Of Third Party Review & Verification For Conceptual Design Stage of NG and SNG Pipework Installation At Residential Building, Plot No. 8, Rbw-2, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Provision for Generation of Design Calculations & Drawings of One Demo Pressure Vessel For Alteration Job As Per ASME Section VIII DIV. 1 ED. 2017 and to Present Design Engineer During Audit.
    GASCO Abu Dhabi Gas Industries Ltd
    Abu Dhabi, UAE
    2018
  • Dynamic Stress analysis for gas piping to evaluate vibration fatigue as a part of Vibration Risk Assessment of Dragon Oil Onshore (CPSF) and Offshore Production Assets (LAM-28 and LAM-A)Turkmenistan
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2018