Our Experience

  • CEMP AUDIT and Environmental Monitoring for Hail Al Gasha Project
    AL JABER ENERGY SERVICES LLC
    Abu Dhabi, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP) for EPC for Early Civil and Site Preparation Works (Package 5-Onshore Early Works)
    Al Jaber Energy Services LLC
    Abu Dhabi, UAE
    2020
  • Indoor Air Quality Monitoring
    AL SHOUMOUKH INDUSTRIES
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing
    Maatouk 1960 Factory
    Abu Dhabi, UAE
    2020
  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-12,13,14 & 15 AIMS (II, III, IV & V) Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval for Detailed Design and Pre-Commissioning Package of NG/ SNG Installation Pipe work for Residential Building (P-330 & P-346), Al Raha Beach District, Abu Dhabi.
    Arabian Unigaz
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing of ICAD 3 OFFICE
    GULF CRYO EMIRATES INDUSTRIAL GASES
    Abu Dhabi, UAE
    2020
  • Project No: LPO-2020-5012-VCS Provision of Third Party Design Review Services For Lifting Lug of Bulk Sulphuric Bowser Tank (As Per BS EN ISO 10855-1:2018)
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2020
  • HZOP study for IMO 2020 in VTTI Fujairah Terminals Ltd FZC
    HIAP SENG ENGINEERING LIMITED FZC
    United Arab Emirates UAE
    2020
  • Construction Environmental Management Plan (CEMP) for Well Drilling & Testing Operation in Onshore Block
    URJA BHARAT
    Abu Dhabi, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP)
    Tecton Engineering and Construction LLC
    United Arab Emirates UAE
    2020
  • THIRD PARTY HSE STUDIES FOR SNG PLANT
    Al Jaber
    United Arab Emirates UAE
    2019
  • HAZOP&SIL Workshop and Report SRU (UNIT 106) Replacement Project at Ruwais
    Wison Engineering
    United Arab Emirates UAE
    2019
  • RE-HAZOP for ADCOP Facilities
    Abu Dhabi National Oil Company (ADNOC) Onshore
    United Arab Emirates UAE
    2019
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Al Raha Beach Building – Plot RBW-06, Abu Dhabi
    Al Khail  Engineering
    Abu Dhabi, UAE
    2019
  • HSE Studies as per ADNOC Project Specification for BUNDUQ
    Target Engineering Construction Company L.L.C.
    United Arab Emirates UAE
    2019
  • Construction Environmental Management Plan for Saadiyat DCP1-Electrical Substation” project
    ADC Energy
    Dubai, UAE
    2019
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019