Our Experience

  • Rigger Training (Safety Awareness)
    MECHANICAL & CIVIL ENGINEERING CONTRACTORS (MACE) LLC
    Abu Dhabi, UAE
    2020
  • Environmental Permit Application for Rehabilitation and Replacement of Existing Sewer Lines in Abu Dhabi Island- Part 5 project
    MACE
    United Kingdom
    2020
  • Pro-forma Call – Off Order No. PCO/HSEIA/17/ 001 – Provision of HSEIA (Phase 1) for CBMB FEED Services Project (PO/725)
    BOROUGE Abu Dhabi Polymers Company Ltd
    United Arab Emirates UAE
    2020
  • Environmental Monitoring & Testing of Mussafah Premises
    WESCO LLC
    Abu Dhabi, UAE
    2020
  • Project No: 8300010178/601 Provision of Third Party Design Verification of Radiant Bundle Supports – H.330189.959 – ADOC Tube Coils
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2020
  • CEMP AUDIT and Environmental Monitoring for Hail Al Gasha Project
    AL JABER ENERGY SERVICES LLC
    Abu Dhabi, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP) for EPC for Early Civil and Site Preparation Works (Package 5-Onshore Early Works)
    Al Jaber Energy Services LLC
    Abu Dhabi, UAE
    2020
  • Frame Work Agreement for Supply of Integrity Management Systems Additional Modules for – PSVMS & EIRMS
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2020
  • Indoor Air Quality Monitoring
    AL SHOUMOUKH INDUSTRIES
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing
    Maatouk 1960 Factory
    Abu Dhabi, UAE
    2020
  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-12,13,14 & 15 AIMS (II, III, IV & V) Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing of ICAD 3 OFFICE
    GULF CRYO EMIRATES INDUSTRIAL GASES
    Abu Dhabi, UAE
    2020
  • Project No: LPO-2020-5012-VCS Provision of Third Party Design Review Services For Lifting Lug of Bulk Sulphuric Bowser Tank (As Per BS EN ISO 10855-1:2018)
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval for Detailed Design and Pre-Commissioning Package of NG/ SNG Installation Pipe work for Residential Building (P-330 & P-346), Al Raha Beach District, Abu Dhabi.
    Arabian Unigaz
    Abu Dhabi, UAE
    2020
  • Construction Environmental Management Plan (CEMP) for Well Drilling & Testing Operation in Onshore Block
    URJA BHARAT
    Abu Dhabi, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP)
    Tecton Engineering and Construction LLC
    United Arab Emirates UAE
    2020
  • HZOP study for IMO 2020 in VTTI Fujairah Terminals Ltd FZC
    HIAP SENG ENGINEERING LIMITED FZC
    United Arab Emirates UAE
    2020
  • Indoor Air Quality Monitoring
    BURCHARDT
    Switzerland
    2020
  • Environmental Consultancy (PER) for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
    Ministry of Infrastructure/ Core Engineering Consultancy
    Abu Dhabi, UAE
    2020
  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-03 Inspect ability, Operability & Maintainability Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing Of their Workshop Premises
    AL GHAZAL TRANSPORT
    Abu Dhabi, UAE
    2020