Our Experience

  • HZOP study for IMO 2020 in VTTI Fujairah Terminals Ltd FZC
    HIAP SENG ENGINEERING LIMITED FZC
    United Arab Emirates UAE
    2020
  • Construction Environmental Management Plan (CEMP) for Well Drilling & Testing Operation in Onshore Block
    URJA BHARAT
    Abu Dhabi, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP)
    Tecton Engineering and Construction LLC
    United Arab Emirates UAE
    2020
  • Indoor Air Quality Monitoring
    BURCHARDT
    Switzerland
    2020
  • Environmental Consultancy (PER) for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
    Ministry of Infrastructure/ Core Engineering Consultancy
    Abu Dhabi, UAE
    2020
  • Project No: AA/SC/OGD0&2/ABK/WO/14/016-00/19-CTR-03 Inspect ability, Operability & Maintainability Review as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Offshore
    Abu Dhabi, UAE
    2020
  • One ERP EAM Interface Development
    Abu Dhabi National Oil Company (ADNOC)
    UAE
    2020
  • Provision of Third Party Approval of Conceptual Package of LPG Installation work for The British School Al Khubairat, Plot No. 73, West 24_2 Abu Dhabi, UAE.
    DEWAN Architects + Engineer
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing Of their Workshop Premises
    AL GHAZAL TRANSPORT
    Abu Dhabi, UAE
    2020
  • Project No: 9600041408 Design & Drawing Review for Three (03) Number MEDS skids
    GGME
    Dubai, UAE
    2020
  • Asset Integrity Management System for TANAP Project
    TANAP
    Turkey
    2020
  • Environmental Monitoring & Testing for ETIHAD Rail Stage 2&3 projects
    CRCC-GTGC JV
    Dubai, UAE
    2020
  • Development and preparation of Construction Environmental Management Plan (CEMP) for Shams Development District Cooling
    ADC Energy Systems
    Dubai , UAE
    2020
  • Ambient Air Quality Monitoring
    AL HOLLA CONCRETE TECHNOLOGY COMPANY (CONTECH)
    Dubai, UAE
    2020
  • Terrestrial Survey for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
    Ministry of Infrastructure/ Core Engineering Consultancy
    Abu Dhabi, UAE
    2020
  • BeAAT Expansion Project – Project No. 5649 Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2020
  • Provision of Third Party Approval of detailed design package and Pre-Commissioning package of NG/ SNG Installation Pipe work.
    Altorath International Engineering Consultants LLC
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing OF Etihad Rail Stage 2&3 Project C0304-Package 2 B
    GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC
    Abu Dhabi, UAE
    2020
  • Project No: VELPO-0114-2020 Provision of Third Party Design Review of 54 Liter LPG Cylinder As Per ISO 22991 And ADNOC Guidelines.
    Velosi Oman
    Oman
    2020
  • Safety Case for Onshore Facility
    Dragon Oil Turkmenistan Limited (DOTL)
    United Arab Emirates UAE
    2020
  • Ambient Air Quality Monitoring
    PROGRYND INDUSTRIES
    Abu Dhabi, UAE
    2020