Our Experience

  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    2015
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • Reliability Centered Maintenance (RCM) at Chemanol
    Chemanol
    Saudia Arabia
    2015
  • Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
    Bunduq Company Ltd
    United Arab Emirates UAE
    2014
  • Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
    BW Offshore
    Singapore
    2013
  • Establisment of Risk Based Inspection Program
    Al Khafji Joint Operation
    Saudia Arabia
    2011
  • Small Bore Piping Integrity Program
    Egyptian ELNG
    Egypt
    2012
  • Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
    Murphy
    Malaysia
    2014
  • Pilot Risk based Inspection (RBI) Study for Wellhead Structurefor Salmander Energy
    Salmander Energy
    Thailand
    2012
  • Reliability Centered Maintenance (RCM) Study Supply ENI, Pakistan
    ENI PAKISTAN LIMITED
    Pakistan
    2010
  • Reliability & Maintenance Effectiveness Implementation
    Al Khafji Joint Operation
    Saudia Arabia
    2012
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO (ASAB 0 & ASAB 1 , HABSHAN, RUWAIS, BU HASA)
    GASCO
    United Arab Emirates UAE
    2011
  • Asset Integrity Management Study for Plant Piping
    Dubai Supply Authority (DUSUP)
    United Arab Emirates UAE
    2009
  • Specification for HAZOP & SIL Determination Study
    Qatar Petroleum
    Qatar
    2010
  • Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED
    Salamander Energy
    Thailand
    2014
  • Risk Analysis for Installing Vapour recovery arm
    QCON
    Qatar
    2010
  • Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
    BP Pakistan
    Pakistan
    2008
  • Structural Modelling, Verification and Certification of Three (3) Numbers Offshore Platforms (LAM-22 WHP, LAM-C and LAM-04)
    Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    December 2021
  • Provision of Structural Re-Analysis Services For RBDP-A Platform In Blocks 01&02, Offshore Vietnam
    Petro Vietnam Exploration Production Corporation Ltd. (Blocks 01&02)
    Vietnam
    December 2020
  • Provision of Risk Based Inspection (RBI) Assessment for Phase 4 Top Side Vessels, Pipings, Structures and Underwater Pipelines for Block B-17-01
    "Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)"
    Malaysia
    June 2021