Our Experience

  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building, Al Raha beach – Abu Dhabi, Sector No. RBW3, Plot No. C2 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Approval of Conceptual Design Package and of NG/SNG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2015
  • Provision of Third Party Design Approval for Conceptual Design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building Shams – Abu Dhabi, Sector No. RS-5, Plot No. C-02 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Design Approval for Conceptual design stageDocuments of NG/SNG Installation in Buildings.
    GHD Global Ply Ltd.
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Approval of detailed design package and of NG/SNG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2015
  • Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings
    ACG
    India
    2015
  • Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings
    Ramboll Middle East
    Dubai, UAE
    2015
  • Provision of Third Party Design Approval for detailed stage NG/SNG System Project: “PF CHANGE Restaurant in Yas Mall
    Al Fanar
    Saudi Arabia
    2014
  • Third Party Approval of detailed design package and of NG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2014
  • Third Party Design Approval for detailed stage NG System
    QEnergy
    Australia
    2014
  • Third Party Design Approval for detailed stage NG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Design Approval for detailed stage NG System
    Qenergy
    Australia
    2014
  • Provision of Third Party Approval of detailed design package of NG/SNG Installation Pipe work.
    Arabian Unigaz
    Abu Dhabi, UAE
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Approval (Detailed design stage) of SNG/NG service pipeline & Installation Pipe work
    Qenergy
    Australia
    2014
  • New York University, Abu Dhabi
    WSP
    Abu Dhabi, UAE
    2013
  • Saadiyat Beach Apartments, Mid Range Building, Saadiyat Island
    Royal Gas
    Pakistan
    2013
  • PA602, Al Raha Beach Development, Abu Dhabi
    Shield Gas
    Abu Dhabi, UAE
    2013