Our Experience

  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    May 2015
  • Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines
    Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    January 2015
  • Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the West Qurana -2 Field
    LukOil Middle East Ltd
    Dubai, UAE
    March 2016
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s
    LukOil Middle East Ltd
    Russia
    July 2016
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    September 2014
  • Integrity Inspection of Natural Gas System Piping for D, E, G, K & H Stations Dubai Electricity and Water Authority (DEWA)
    Dubai Electricity and Water Authority (DEWA)
    Dubai, UAE
    August 2016
  • Risk Based Inspection (RBI) Study
    TECHNIP
    Abu Dhabi, UAE
    In Progress
  • Provision of Asset & Operation Integrity Services
    Kebabangan Petroleum Operating Company Sdn Bhd (KPOC)
    Malaysia
    September 2015
  • INTEGRITY MANAGEMENT SERVICES
    Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    December 2016
  • Integrity Management Support Service
    EQUION Energy Limited.
    Columbia
    February 2013
  • Risk Based Inspection Study for following assets
    Dolphin Energy Limited, UAE
    United Arab Emirates UAE
    March 2015
  • Risk Based Inspection Assessment
    ORYX GTL
    Qatar
    December 2016
  • RBI for Topside Structure & Hull
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    February 2015
  • Risk Based Inspection Assessment for Equipment and Piping system
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    October 2013
  • Review the P & IDs and piping isometric drawings for unit 1U-14,15,16 and 17 to identify and prepare a detailed ‘Master register’ of all dead legs. The register is to clearly identify the Risk Rating/ Criticality for each of the Corrosion Loop, dead-leg sections.
    Egyptian LNG
    Egypt
    August 2013
  • Service provider will perform a risk based inspection (RBI) assessment for Four Abu Ali Plants Berri Gas Compression Facility (472), Berri Spheroid Crude shipping Plant (F32)
    Saudi Aramco
    Saudi Arabia
    March 2013
  • Risk Based Inspection for Static Equipment and Piping System.
    Saudi Aramco
    Saudi Arabia
    October 2013
  • Service provider will perform a risk based inspection (RBI) assessment on Eastern Region Distribution Department (ERDD) facility at Dhahran X-14 Tank Farm that complies with the latest edition of API 580 and API 581.
    Saudi Aramco
    Saudi Arabia
    December 2011
  • The Service provider shall perform a risk based inspection (RBI) assessment on the All the listed plants at the Yanbu Refinery (YRD) that complies with the current editions of API 580 and API 581
    Saudi Aramco
    Saudi Arabia
    May 2012
  • The Company plans to establish Risk Based Inspection (RBI) program for all Facilities listed in Attachment 1 to this Exhibit (Total – 20 Nos.)
    Al-Khafji Joint Operations-KJO
    Saudi Arabia
    December 2013