Our Experience

  • Provision of Third Party Approval of All 3 Stages of NG/SNG Installation Pipe work in Residential Building
    Arkiteknik International
    United Arab Emirates UAE
    2015
  • Project No: BAE/VCS/SC/2015/0044 Design of Blast Proof Building Inside Ruwais refinery (Takreer)
    Bin Asheer Transport and General
    Abu Dhabi, UAE
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    2015
  • QRA Study as part of Health, Safety and Environmental Impact Assessment (HSEIA) Study for Waste Heat Recovery Project – Project No. 6143
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2015
  • Provision of Third Party Design Approval for Conceptual Design Stage of NG/SNG Installation in Residential Tower
    APG Arch Planning Group
    Abu Dhabi, UAE
    2015
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
    Qatar Fertiliser Company (QAFCO)
    Qatar
    2015
  • Project No: VQ-43391-PCS-2015 Design Review & Verification of Coiling Tower and Cable Laying Structure
    PCS Cables LLC.
    Qatar
    2015
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    Luk Oil Middle East Ltd.
    Iraq
    2015
  • QRA Study as part of Health, Safety and Environmental Impact Assessment (HSEIA) Study for Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804
    Abu Dhabi National Oil Company (ADNOC) Refining
    United Arab Emirates UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building, Al Raha beach – Abu Dhabi, Sector No. RBW3, Plot No. C2 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Risk Based Inspection (RBI) Static Equipment and Piping at Hawiyah GOSP – 3 & Haradh GOSP – 2 & 3 for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2015
  • KPOC CTR 002B Structure RBI Study-Topside Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • HAZID/ENVID/OHRA, Bow Tie & Risk Reduction (ALARP), SIMOPS & MOPO Workshops & Studies
    TAKREER
    United Arab Emirates UAE
    2014
  • Fitness For Service Of LPG Sphere 2109FB for Qatar Petroleum
    Qatar Petroleum
    Qatar
    2014
  • KPOC CTR 005 Identification of Deadlegs , Small Bore Identification, injections points, corrosion monitoring and support locations, and preparation of registers
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Project No: PO-14-01175 Structural Verification And Certification Of LAM-B Platform With Two Additional Wells
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2014
  • Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
    Petronas Carigali
    Malaysia
    2014
  • Provision of Third Party Approval of detailed design package of NG/SNG Installation Pipe work.
    Arabian Unigaz
    Abu Dhabi, UAE
    2014
  • CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
    KPOC
    Malaysia
    2014
  • Third Party Technical Integrity Verification Services
    SHELL IRAQ
    IRAN
    2014
  • Order Number: 3620015913 MOB OF RAM ENGR & RAM CONSLTCY (BETTY) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014