Our Experience

  • Project No: QP-204/53292/2015 Calculation the Strength of Existing Control Room 1 False Floor
    Oil and Gas Development Company Limited
    Abu Dhabi, UAE
    2016
  • LTC/ ENG/2030/12 -CALL-OFF Contract For The Supply Of Sub-Sea Representative To Oversee The Underwater Inspection Surveys Of All Platforms And Do Condition Monitoring Survey For Offshore Pipelines, Cables And Associated Sub Connection Facilities
    QATARGAS OPERATING COMPANY LIMITED
    Qatar
    2016
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    LukOil Middle East Ltd.
    Iraq
    2016
  • Perform piping stress analysis of chiller piping in order to evaluate piping loads used in design calculations of pipe supports by Vendor and review & certification of pipe supports design calculations for chiller piping provided by the Vendor
    Genric Engineering Technologies
    QATAR
    2016
  • Noise and Emission Testing of Aviation Equipment Based at Peshawar Airport as per NEQ’s requirements.
    Pakistan State Oil Company Limited (PSO)
    Pakistan
    2016
  • Project No: GBH-DXB-16206 Third Party Review of Tower Crane Foundation
    GBH International Contracting LLC
    Dubai, UAE
    2016
  • Reliability Centered Maintenance (RCM) Study for Unit 13 in Hydroskimmer Plant at Ruwais Refinery
    TAKREER
    United Arab Emirates UAE
    2015
  • Provision of Third Party Approval of detailed design package and of NG/SNG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2015
  • Project No: S15-223 Design/Documents Review-44838-Tank Modification Works Re-Certification
    Qcon-Qatar
    Qatar
    2015
  • Risk Contributor Assessment Study For MAF Refinery
    Oman Refineries and Petrochemicals Company LLC (ORPC)
    United Arab Emirates UAE
    2015
  • Risk Contributor Assessment Study For MAF Refinery
    Oman Oil Refineries and Petroleum Industries Company - ORPIC
    Oman
    2015
  • Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings
    ACG
    India
    2015
  • Project No: RSA/716/11-15 Design Review and calculation Approval of car shade (1 No.)
    Royal Arab Metal Works LLC
    Dubai, UAE
    2015
  • HAZOP Study of ESD & Blowdown Valves
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2015
  • HAZOP Study and Hazardous Study
    L&T Oman LLC
    Oman
    2015
  • Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Buildings
    Ramboll Middle East
    Dubai, UAE
    2015
  • Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
    PETRONAS FLNG 1 (L) Ltd
    Malaysia
    2015
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    Abu Dhabi, UAE
    2015
  • Project No: VQ/40169 ITAS-SPA-Lifting calculation Review
    Qatar Petroleum
    Qatar
    2015
  • Project No: 5809100625 Detail Design of Monorail Beams
    Emirates Steel Industries
    Abu Dhabi, UAE
    2015
  • HSE Audit Surveys at Onshore & Offshore Rigs
    National Drilling Company (NDC)
    Abu Dhabi, UAE
    2015