Our Experience

  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG and SNG Pipework Installation at Residential Building, Sector RBW-7, Plot C-10, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Variation Order for Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
    Qatar Petroleum
    Qatar
    2018
  • Provision Of Third Party Review & Verification For Conceptual Design Stage of NG and SNG Pipework Installation At Residential Building, Plot No. 8, Rbw-2, Al Raha Beach, Abu Dhabi.
    Hannover Consulting
    Abu Dhabi, UAE
    2018
  • Provision for Generation of Design Calculations & Drawings of One Demo Pressure Vessel For Alteration Job As Per ASME Section VIII DIV. 1 ED. 2017 and to Present Design Engineer During Audit.
    GASCO Abu Dhabi Gas Industries Ltd
    Abu Dhabi, UAE
    2018
  • Dynamic Stress analysis for gas piping to evaluate vibration fatigue as a part of Vibration Risk Assessment of Dragon Oil Onshore (CPSF) and Offshore Production Assets (LAM-28 and LAM-A)Turkmenistan
    Dragon Oil (Turkmenistan) Ltd – DOTL
    Turkmenistan
    2018
  • Project No: AS-M141-P53545 Agency for Verifying Pump NPSH Calculation Construction of Additional Outfall for Ruwais Refinery (East)
    Dhafir Technologies LLC
    Abu Dhabi, UAE
    2018
  • AF/C/AA5312/13 Inspection Of The Steel Structures Of Aspire Sports Hall And Aspire Sports Academy In Aspire Zone.
    ASPIRE LOGISTICS
    Qatar
    2018
  • Project No: 8300007767/601 Provision of Design Verification To Verify Material Grade Changes of Evaporator Tubes In Which The Existing Material of SA-178 Gr. A is Replaced With Available Material of SA-178 Gr. C.
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2018
  • AF/C/AL5311/13 – Regular Inspection Of The Steel Structures Of Various Venues In Aspire Zone
    ASPIRE LOGISTICS
    Qatar
    2018
  • Decommissioning Environmental Management Plan (DEMP) Preparation of DEMP in accordance with EAD’s Technical Guidance Document for Decommissioning Environmental Management Plan (DEMP).
    National Marine Dredging Company (NMDC)
    Abu Dhabi, UAE
    2018
  • SIC_013 – Out Fall Condition Assessment
    ASHGHAL
    Qatar
    2018
  • Preparation of diagnostic reports in accordance with Algerian regulatory requirements, SONATRACH standards and international standards and good practices.
    SONATRACH
    Algeria
    2018
  • Project No: 41807581/0 Condition Assessment of Portacabin at DWC AMIA (IN181203)”
    Dubai Airports Engineering Services DWC
    Dubai, UAE
    2018
  • Development of Construction Environment Management Plan (CEMP) for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
    MACE Contractors
    United Kingdom
    2018
  • Integrity Management Software Deployment
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2018
  • Project No: T3137 Approval of Structural Design and Drawings of CPS 06 E House
    TECHNOMAK Energy International
    Abu Dhabi, UAE
    2018
  • Environmental Impact Assessment (EIA) Study of Animal Breading Farm Suweihan Area Plot no 57-05-801-330
    Emirates Future
    Abu Dhabi, UAE
    2018
  • HAZOP Study for RTALPD
    Specialized Technologies L.L.C
    Saudi Arabia
    2018
  • Project No: VELPO/0371/2018 Provision of Third Party Design Review of Three (03) LPG Cylinders As Per ISO 22991 and ADNOC Guidelines.
    Velosi Oman
    Oman
    2018
  • Risk Based Inspection of stationery equipment at Sui Field Location
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2018
  • Project No: PO/18-003-005 Third Party Design Review & Verification of Mechanical and Structural Design Calculations and GA drawing only for One Design of TES Tank as per AWWA D100
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2018