Our Experience

  • Asset Integrity Management System for TANAP Project
    TANAP
    Turkey
    2020
  • Ambient Air Quality Monitoring
    AL HOLLA CONCRETE TECHNOLOGY COMPANY (CONTECH)
    Dubai, UAE
    2020
  • Terrestrial Survey for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
    Ministry of Infrastructure/ Core Engineering Consultancy
    Abu Dhabi, UAE
    2020
  • Provision of Third Party Approval of detailed design package and Pre-Commissioning package of NG/ SNG Installation Pipe work.
    Altorath International Engineering Consultants LLC
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing OF Etihad Rail Stage 2&3 Project C0304-Package 2 B
    GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC
    Abu Dhabi, UAE
    2020
  • Project No: VELPO-0114-2020 Provision of Third Party Design Review of 54 Liter LPG Cylinder As Per ISO 22991 And ADNOC Guidelines.
    Velosi Oman
    Oman
    2020
  • BeAAT Expansion Project – Project No. 5649 Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2020
  • Ambient Air Quality Monitoring
    PROGRYND INDUSTRIES
    Abu Dhabi, UAE
    2020
  • Environmental Baseline Assessment as per below
    Total Abu Al Bukhoosh
    Abu Dhabi, UAE
    2020
  • Safety Case for Onshore Facility
    Dragon Oil Turkmenistan Limited (DOTL)
    United Arab Emirates UAE
    2020
  • Provision of Third Party Review & Verification for Conceptual Design Stage of NG Pipework Installation at Al Raha Beach Building – Plot RBW-06, Abu Dhabi
    Al Khail  Engineering
    Abu Dhabi, UAE
    2019
  • HSE Studies as per ADNOC Project Specification for BUNDUQ
    Target Engineering Construction Company L.L.C.
    United Arab Emirates UAE
    2019
  • Construction Environmental Management Plan for Saadiyat DCP1-Electrical Substation” project
    ADC Energy
    Dubai, UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019
  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Environmental Baseline Survey of Dubai Site To perform the following study; Ambient Air Quality including Dust
    RTA/ Western Bainoona Group.
    Abu Dhabi, UAE
    2019
  • Project No: 003056-Rev-01 Third Party Certification for the Surge Vessel Capacity Calculation
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2019
  • Environmental Monitoring & Testing Following study are part of the scope; Indoor Air Quality
    Al Khaznah Tannery
    Abu Dhabi, UAE
    2019