Our Experience

  • Preparation of Inspection Packs for Wellhead Structure for Salamander Energy
    Salamander Energy
    Thiland
    December 2014
  • Pilot RBI Study for Wellhead Pressure equipment for Salamander Energy
    Salamander Energy
    Thiland
    March 2012
  • Pilot RBI Study for Wellhead Pressure equipment for Salamander Energy
    Salamander Energy
    Thiland
    March 2012
  • Pilot Risk Based Inspection (RBI) Study for Wellhead Structures for Salamander Energy
    Salamander Energy
    Thiland
    March 2012
  • Development of A Study on The Compliance of Installations and Equipment of The OHANET Regional Department
    SONATRACH
    Algeria
    December 2021
  • Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
    SONATRACH
    Algeria
    July 2021
  • Borouge Inspection & Corrosion Management System Audit
    BOROUGE
    United Arab Emirates UAE
    February 2021
  • Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
    SONATRACH
    Algeria
    33 Weeks
  • HSE Critical Integrity Verification for TAKREER Facilities
    TAKREER
    Abu Dhabi, UAE
    May 2019
  • Process Safety Management (PSM) Evaluation & Benchmarking Study at PPL
    Pakistan Petroleum Limited
    Pakistan
    March 2018
  • Technical Audit of Sui Northern Gas Pipelines Limited
    Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    November 2018
  • Technical Audit of Sui Northern Gas Pipelines Limited
    Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    February 2008
  • Consultancy Services for Periodic Equipment Integrity Review (PEIR)
    Abu Dhabi National Oil Company (ADNOC)
    Abu Dhabi, UAE
    March 2013
  • Independent Audit Verification for HSECES at ADRD and RRD
    TAKREER
    Abu Dhabi, UAE
    December 2012
  • Reliability and Maintenance Effectiveness Review & Implementation
    Al-Khafji Joint Operations (KJO)
    Saudi Arabia
  • Risk Analysis for Installing Vapour recovery arm
    Qatar Engineering and Construction Company (Qcon)
    Qatar
    June 2009
  • Review and Assessment of ADGAS SOP in accordance with AIRMS as part of Development of Static Equipment Inspection Task Plan & Master Plan
    Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    Abu Dhabi, UAE
  • Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
    BP-Pakistan
    Pakistan
    May 2009
  • Reliability & availability study for ADGAS Flow measuring equipments.
    Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    Abu Dhabi, UAE
    April 2009
  • Third Party Review and Certification of Drawings and Documents for Firefighting at Ruwais Refinery
    DHAFIR Technologies
    United Arab Emirates UAE
    June 2015