Our Experience

  • AF/C/AL5311/13 – Regular Inspection Of The Steel Structures Of Various Venues In Aspire Zone
    ASPIRE LOGISTICS
    Qatar
    November 2018
  • Reliability Centered Maintenance Study as part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
    Al Asab General Transport & Contracting L.L.C/ ADNOC Onshore
    United Arab Emirates UAE
    May 2021
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    In Progress
  • PROVISION OF COMPUTERISED INTEGRITY ENGINEERING SERVICES
    REPSOL
    Malaysia
    March 2016
  • Risk Based Inspection
    Emirates Steel
    United Arab Emirates UAE
    April 2019
  • Basic Engineering Study For Fire Risk Assessment Implementation (Phase-1)B3:I14E15B3:F9B3:J19B3:J28B3:K53
    ADOC-Abu Dhabi Oil Co. Ltd. (Japan)
    Abu Dhabi, UAE
    May 2016
  • DRAGON OIL – TPA 1 for LAM-C ZHDANOV -A Platforms and (14”O&8″O) Subsea Pipeline Project.
    DRAGON OIL
    Abu Dhabi, UAE
    August 2014
  • Pakistan Petroleum Limited Consultancy Services for Design & Supervision for Pressure Vessels’ Design study and Civil Mechanical and Electrical
    Pakistan Petroleum Limited(PPL)
    Pakistan
    October 2016
  • Detailed Engineering Design of Segregation and Composting Facility including Resident Supervision at Sahiwal ( including Admin block)
    Gove. of Punjab The Urban Development Unit
    Pakistan
    October 2016
  • Consultancy Services for the production of three dimensional as-built drawings and HVAC Design of IBM facility, Karachi
    EFS Encrypted File System - IBM
    Pakistan
    August 2019
  • Development of Reliability, Availability and Main ability (RAM) as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Onshore
    United Arab Emirates UAE
    December 2021
  • HSE Critical Integrity Verification for TAKREER Facilities
    TAKREER
    Abu Dhabi, UAE
    May 2019
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    ADNOC Refining
    United Arab Emirates UAE
    March 2020
  • Implementation of Maintenance & Integrity Audit Gap Bridging Measures
    Abu Dhabi Oil Co., Ltd. (Japan)
    United Arab Emirates UAE
    December 2021
  • SIL Studies, workshop and reports as part of HSE Studies for EPC for Provision and Installation of New Bypass System at MP-21 and Removal of Redundant Lines at Old Mp-21 Station
    Galfar Engineering and Contracting/ ADNOC Onshore
    United Arab Emirates UAE
    In Progress
  • Consultancy Services for Inventory Auditing, Validation and Valuation
    Dragon Oil Turkmenistan Limited
    UAE & Turkmenistan Site
    October 2018
  • Integrity Inspection of Natural Gas System Piping for D, E, G, K & H Stations Dubai Electricity and Water Authority (DEWA)
    Dubai Electricity and Water Authority (DEWA)
    Dubai, UAE
    August 2016
  • IT Softwares, Licenses, Subscriptions and Renewals Annual Software Maintenance for VAIL-Plant®
    BRUNEI METHANOL COMPANY (BMC)
    Brunei
    In Progress
  • PM Program for Civil & Structural Elements in Smelter
    MA’ADEN ALUMINIUM
    Saudi Arabia
    March 2019
  • Quantitative Risk Assessment (QRA Study) for HSE Studies for EPC for Provision and Installation of New Bypass System at MP-21 and Removal of Redundant Lines at Old Mp-21 Station
    Galfar Engineering & contracting WLL Emirates (ADNOC Onshore)
    United Arab Emirates UAE
    February 2021
  • ADGAS-LNG Trains Operational Life Extension Independent Overall Assessment and Verification
    Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    Abu Dhabi, UAE
    February 2017