Our Experience

  • Kandhkot compression station piping Stress analysis (static and dynamic) by using CAESAR II Software to assess Thermal cyclic fotigue at Anchor & other stress intesification locations.
    Pakistan Petroleum Limited
    Pakistan
    2012
  • Detailed design of package skid including piping stress analysis.
    FERROFAB,DUBAI
    Dubai, UAE
    2011
  • FEED Design for Water Sprinkler System & Fire and Gas Detection system. Including piping stress analysis.
    Al-Khafji Joint Operations [KJO], KSA
    Saudi Arabia
    2010
  • FEED Design for Water Sprinkler System & Fire and Gas Detection system including stress piping analysis.
    Methanol Chemicals Plant, KSA
    Abu Dhabi
    2010
  • Surge analysis for pipelines and third party services for design review & inspection for various activities during execution of 30” onshore pipeline project.
    Dragon Oil (Turkmenistan) Ltd - DOTL
    Abu Dhabi
    2010
  • Piping dynamic stress analysis to control viberation of fuel gas supply system at KJO facility.
    Al-Khafji Joint Operations [KJO]
    Saudi Arabia
    2008
  • Piping dynamic stress analysis to control vibration of fuel gas supply system.
    National Indian Gaming Commission - NIGC
    Saudi Arabia
    2008
  • Sress analysis of Pipeline Riser for Hangam Field Development project by using (CAESAR II Software)
    JTECC-IRAN (Hengam)
    IRAN
    2008
  • Sress analysis of Pipeline Riser for South Pars Gas field Development phases 15 & 16 by using (CAESAR II Software)
    IOEC-IRAN
    IRAN
    2008
  • Conceptual, FEED & Basic for Sawan gas field revamping project. Including piping stress analysis.
    OMV
    Abu Dhabi
    2008
  • Stress analysis of Hydraulic oil piping of BIJUPURA Salama FPSO.
    Petrobrass - Brazil
    Singapore
    2007
  • Root Cause Analysis (RCA) as a part Provision of Reliability Engineering Services for Block-6 Facilities as Introduction to Asset Integrity Management Program
    Petro-Energy E&P Co., Ltd.
    Sudan
    September 2020
  • Failure Analysis of Reformer Gas Quench Tower (RG 331-E) for Emirates Steel
    Emirates Steel
    Abu Dhabi
    October 2015
  • Root Cause Analysis (RCA) as a part Corrosion Consultancy Services for Crude Oil Storage Tank Pipelines/Headers at HALUL Island for
    Qatar Petroleum
    Qatar
    January 2013
  • Reliability, Availability and Maintainability (RAM) Study As part of ADNOC Gas Processing Gas Master Plan- Sahil & Haliba New Development Study
    Bilfinger Tebodin Middle East Ltd.
    United Arab Emirates UAE
    December 2021
  • RAM Study for Tawke Gas Injection Facility AGI EPC
    Global Process System (GPS)
    United Arab Emirates UAE
    December 2021
  • Development of Reliability, Availability and Main ability (RAM) as part of AIMS Services of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ ADNOC Onshore
    United Arab Emirates UAE
    December 2021
  • Development of Reliability, Availability and Maintainability Model (RAM) as part of AIMS Services for EPC for BAB 485 MBS Sustainable Facilities Project
    Archirodon Construction (Overseas) Co. Ltd/ADNOC Onshore
    United Arab Emirates UAE
    December 2021
  • Development of Reliability, Availability and Main ability (RAM) as a part of AIMS Services for EPC for Rumaitha Thamama Zone B Phase – III Expansion & Phase-I VRC Replacement Project
    Al ASAB/ ADNOC Onshore
    United Arab Emirates UAE
    December 2021
  • Order Number: 3620015913 MOB OF RAM ENGR & RAM CONSLTCY (BETTY) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014