Our Experience

  • Risk Based Inspection Assessment for Equipment and Piping system
    Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    October 2013
  • Review the P & IDs and piping isometric drawings for unit 1U-14,15,16 and 17 to identify and prepare a detailed ‘Master register’ of all dead legs. The register is to clearly identify the Risk Rating/ Criticality for each of the Corrosion Loop, dead-leg sections.
    Egyptian LNG
    Egypt
    August 2013
  • Service provider will perform a risk based inspection (RBI) assessment for Four Abu Ali Plants Berri Gas Compression Facility (472), Berri Spheroid Crude shipping Plant (F32)
    Saudi Aramco
    Saudi Arabia
    March 2013
  • Risk Based Inspection for Static Equipment and Piping System.
    Saudi Aramco
    Saudi Arabia
    October 2013
  • Service provider will perform a risk based inspection (RBI) assessment on Eastern Region Distribution Department (ERDD) facility at Dhahran X-14 Tank Farm that complies with the latest edition of API 580 and API 581.
    Saudi Aramco
    Saudi Arabia
    December 2011
  • The Service provider shall perform a risk based inspection (RBI) assessment on the All the listed plants at the Yanbu Refinery (YRD) that complies with the current editions of API 580 and API 581
    Saudi Aramco
    Saudi Arabia
    May 2012
  • The Company plans to establish Risk Based Inspection (RBI) program for all Facilities listed in Attachment 1 to this Exhibit (Total – 20 Nos.)
    Al-Khafji Joint Operations-KJO
    Saudi Arabia
    December 2013
  • Shell RBI for equipment and piping system
    JGSK Limited
    United Kingdom
    In Progress
  • Assessment of Phonon Inspection for 22″ and 24″ Pipeline
    MRA International Sdn Bhd
    Malaysia
    August 2017
  • Perform ICDA and ECDA Assessment using existing data (Including CIPS & DCVG survey result)
    Nam Con Son Pipeline (NCSP)
    Vietnam
    February 2016
  • Provision of Fitness For Service (FFS) Assessment Of Pipelines For PETRONAS CARIGALI SDN BHD – SABAH OPERATIONS
    PETRONAS CARIGALI SDN BHD
    Malaysia
    June 2018
  • PROVISION OF COMPUTERISED INTEGRITY ENGINEERING SERVICES
    REPSOL
    Malaysia
    February 2017
  • PROVISION OF COMPUTERISED INTEGRITY ENGINEERING SERVICES
    REPSOL
    Malaysia
    April 2017
  • PROVISION OF COMPUTERISED INTEGRITY ENGINEERING SERVICES
    REPSOL
    Malaysia
    March 2016
  • PROVISION OF COMPUTERISED INTEGRITY ENGINEERING SERVICES
    REPSOL
    Malaysia
    December 2016
  • PROVISION OF COMPUTERISED INTEGRITY ENGINEERING SERVICES CTR-15 Bunga Pakma Pipeline Inspection Engineering and BOD Jacket Anode Review
    REPSOL
    Malaysia
    January 2018
  • Integrity Study of Bushra Line 33km for DALEEL
    Daleel Petroleum L.L.C.
    Oman
    November 2014
  • Pipeline Integrity Assessment and Life Extension Study for 6 Nos. Pipelines
    Bunduq Company Ltd
    Abu Dhabi, UAE
    December 2014
  • Pipeline Integrity Assessment And Life Extension For 2nos.Pipelines
    Bunduq Company Ltd
    Abu Dhabi, UAE
    December 2013
  • RO # 3 – Development of Asset Register for Subsea, Pipelines and Riser for KNPD – A Platform as part of Provision of Computerized Integrity Engineering Services
    Talisman Energy Limited
    Malaysia
    September 2012