Our Experience

  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Project No: 003056-Rev-01 Third Party Certification for the Surge Vessel Capacity Calculation
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2019
  • Project No: LPO159308 Provision for “Third party consultancy investigative study for the damage to existing boundary walls”
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • Project No: LPO-160518 Design Verification of the Trench Sheeting Shoring System
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • Provision for Generation of Design Calculations & Drawings of One Demo Pressure Vessel For Alteration Job As Per ASME Section VIII DIV. 1 ED. 2017 and to Present Design Engineer During Audit.
    GASCO Abu Dhabi Gas Industries Ltd
    Abu Dhabi, UAE
    2018
  • Project No: AS-M141-P53545 Agency for Verifying Pump NPSH Calculation Construction of Additional Outfall for Ruwais Refinery (East)
    Dhafir Technologies LLC
    Abu Dhabi, UAE
    2018
  • Project No: 8300007767/601 Provision of Design Verification To Verify Material Grade Changes of Evaporator Tubes In Which The Existing Material of SA-178 Gr. A is Replaced With Available Material of SA-178 Gr. C.
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2018
  • Project No: 41807581/0 Condition Assessment of Portacabin at DWC AMIA (IN181203)”
    Dubai Airports Engineering Services DWC
    Dubai, UAE
    2018
  • Project No: T3137 Approval of Structural Design and Drawings of CPS 06 E House
    TECHNOMAK Energy International
    Abu Dhabi, UAE
    2018
  • Project No: VELPO/0371/2018 Provision of Third Party Design Review of Three (03) LPG Cylinders As Per ISO 22991 and ADNOC Guidelines.
    Velosi Oman
    Oman
    2018
  • Project No: PO/18-003-005 Third Party Design Review & Verification of Mechanical and Structural Design Calculations and GA drawing only for One Design of TES Tank as per AWWA D100
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2018
  • Project No: T3122 Design Review and Verification for Auxiliary Structure of V7841 & V9133.
    TECNIMONT
    Italy
    2018
  • Project No: 55497 Design Review and Approval of Lifting Trunnion & Tailing Lug of Buffer Tank T-50101
    PETROSERV
    Qatar
    2017
  • Project No: 9500091537 Lifting lug with pad & Tailing lug Calculation Review.
    Qatar Petroleum
    Qatar
    2017
  • Project No: 9500075879 Lifting Procedure, Lifting Calculation and Lifting Arrangement Drawing Review
    Qatar Petroleum
    Qatar
    2017
  • Project No: 9500085656 Lifting Lug Calculations & Test Procedure for each valve
    Qatar Petroleum
    Qatar
    2017
  • Third Party Design Review of Structural Design Calculation, Anchor bolt layout, Anchor bolt reactions, Main frame cross section, Roof framing plan, Sidewall framing elevation, End wall framing elevation, Architectural Plan & Elevations.
    TAKREER
    Abu Dhabi, UAE
    2017
  • Project No: PO/17-080 Design Validation of Evaporator Steel Structure
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2017
  • Project No: PO/17-079 Third Party Design Review & Verification of Mechanical and Structural Design Calculations for One Design of Chilled Water Storage Tank as Per API-650
    TS Tank Contracting L.L.C
    Abu Dhabi, UAE
    2017
  • Project No: PO/17-007 Third Party Design Review & Approval of Mechanical, Structural & Foundation (Ring Wall) Design Calculations and General Arrangement Drawing for One Design of Portable
    TANKLINE
    Abu Dhabi, UAE
    2017