Our Experience

  • SIL level assessment is the second project, in which Akzo have already assigned SIL levels to limit switches and need to be verified as subject expert, as it’s the requirement of Akzo to verify from expert for it to be termed as approved.
    AKZO NOBEL PAKISTAN LIMITED
    Pakistan
    2020
  • Environmental Monitoring & Testing of GRC1
    Fibrex Construction LLC (GRC-1)
    Abu Dhabi, UAE
    2020
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019
  • Layer of Protection Analysis (LOPA) Study and Safety Integrity Level (SIL) of Standard Well Head
    United Energy Pakistan Limited
    Pakistan
    2019
  • Pre-Shipment Inspection of Stud Bolts
    SNGPL
    Pakistan
    2019
  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Environmental Baseline Survey of Dubai Site To perform the following study; Ambient Air Quality including Dust
    RTA/ Western Bainoona Group.
    Abu Dhabi, UAE
    2019
  • Annual Maintenance & Support Services VAIL Plant Software
    PPL
    Pakistan
    2019
  • Third Party Inspection for Replacement Valve for TIPU Well Development Project
    MPCL
    Pakistan
    2019
  • Project No: 003056-Rev-01 Third Party Certification for the Surge Vessel Capacity Calculation
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2019
  • Environmental Monitoring & Testing Following study are part of the scope; Indoor Air Quality
    Al Khaznah Tannery
    Abu Dhabi, UAE
    2019
  • Pre-Shipment Inspection of Material against SNGPL PO NT-1406-18 & I O # NT-1454 19 from UAE Origin
    SNGPL
    Pakistan
    2019
  • VAIL-Plant® Annual Support/Maintenance and Modifications
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2019
  • Project No: LPO159308 Provision for “Third party consultancy investigative study for the damage to existing boundary walls”
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
    SONATRACH
    Algeria
    2019
  • Environmental Monitoring & Testing of JAFZA Facility Following study are part of the scope; Indoor Air Quality without Dust
    Express Pack Print
    Abu Dhabi, UAE
    2019
  • Inspection of Stud Bolts
    SNGPL-VISP Lhr
    Pakistan
    2019
  • Provision of Services on implementing Hazard and Operability Analysys (HAZOP Analysis) at UCS1, and UKMS Stations of Bukhara MGMC
    Asia Trans Gas
    Uzbekistan
    2019