Our Experience

Asset Integrity Management Services
  • CLIENT
    LOCATION
    YEAR
    TITLE
  • OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)
    Oman
    Dec-20
    RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
  • Al Asab General Transport & Contracting L.L.C/ ADNOC Onshore
    UAE
    Nov-20
    Reliability Centered Maintenance Study as part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Oct-20
    VAIL Plant EIRMS Implementation Services for LAM-C, LAM-22, LAM-13 & LAM-63 Offshore Platforms Using EIRMS Modleu
  • Bashayer Pipeline Company (BAPCO)
    Sudan
    Dec-20
    Reliability Cantered Maintenance Study as part of Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
  • ADNOC LNG
    UAE
    Sep-20
    SAP Functional Location Restructuring
  • TAKREER
    UAE
    Dec-15
    Reliability Centered Maintenance (RCM) Study for Unit 13 in Hydroskimmer Plant at Ruwais Refinery
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Dec-19
    Implementation of EIRMS Services for LAM-28, LAM-A and LAM-B Offshore Platforms Using Velosi VAIL Plant EIRMS Module
  • Saudi Aramco/Technicas Reunidas
    Saudi Arabia
    Jan-20
    APMP (Asset Performance Management Program) Study for RAS TANURA – Clean Fuels Project for Saudi Aramco
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Mar-19
    Frame Work Agreement for Supply of Integrity Management Binh SON Refining & Petrochemical CO. LTD (BSRViet Nam Additional Modules for – PSVMS & EIRMS
  • JGC Corporation (Japan/ Algeria) & SONATRACH (Algeria)
    Algeria
    Mar-20
    Criticality Analysis, FMEA, RCM & RBI Studies for HASSI MESSAOUD Upside North Project
  • MARAFIQ Power & Water Utility Company for Jubail and Yanbu,Saudi Arabia
    Saudi Arabia
    Mar-20
    Continuous Reliability Improvement Program (Phase-3)
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Oct-18
    Consultancy Services for Inventory Auditing, Validation and Valuation
  • Dolphin Energy Limited
    Qatar
    Apr-20
    Development of CMMS for Offshore EPRS Project
  • STAR RAFINERI
    Turkey
    Apr-18
    Maintenance Master Data Collection, Creation, Cleansing, Enrichment and Preparation Load Ready Files Project for Computerized Maintenance Management System (CMMS)
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Oct-17
    Enterprises Asset Management (EAM) Services for additional assets of L-F facility
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Apr-17
    Enterprises Asset Management (EAM) Services for Tank Farm
  • Qatar Engineering & Construction W.L.L/Dolphin Energy Limited
    Qatar
    Jul-17
    Providing SAP Templates-CMMS Services for IWMP PROJECT in Dolphin Energy Limited
  • Dolphin Energy Limited
    Qatar
    Nov-16
    Preventative Maintenance Optimization
  • KPOC
    Malaysia
    Sep-15
    Preparation of Asset register & FMECA based RCM Analysis including PMRs Development as Part of Asset & Operation Integrity Services
  • MISC Offshore Floating Terminals (L) Limited
    Malaysia
    Oct-14
    Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
  • Chemanol
    Saudi Arabia
    Oct-15
    Reliability Centered Maintenance (RCM) at Chemanol
  • Petronas Carigali
    Malaysia
    Oct-14
    MOB OF RAM ENGR & RAM CONSLTCY (BETTY) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
  • Petronas Carigali
    Malaysia
    Oct-14
    CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
  • Petronas Carigali
    Malaysia
    Oct-14
    Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
  • MURPHY
    Malaysia
    Oct-14
    Development & Implementation of Integrated Maintenance & Reliability System
  • Al-Khafji Joint Operations-KJO
    Saudi Arabia
    Oct-13
    RCM / RAM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 2
  • ENI PAKISTAN LIMITED.
    Pakistan
    Jul-10
    Reliability Centered Maintenance (RCM) / RAM Study”Supply”
  • Al-Khafji Joint Operations-KJO
    Saudi Arabia
    Oct-09
    RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 1
  • Saudi Aramco
    Saudi Arabia
    Jul-20
    RBI Ever-Greening Studies MFC at Saudi Aramco Khursaniyah Gas Plant
  • Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    Feb-20
    Risk Based Inspection Assessment Integrity Services for LAM – 10, LAM – 75, ZHD – 21 & ZHD – 60 Offshore Platforms of DOTL
  • OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)
    Oman
    Apr-20
    RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
  • Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    Jun-20
    Provision of Risk Based Inspection (RBI) Assessment for Phase 4 Top Side Vessels, Pipings, Structures and Underwater Pipelines for Block B-17-01
  • Groupement Reggane
    Algeria
    Dec-19
    Provision of Technical Assistance To Prepare The Triannual and Decennial Shutdown For Reggane Facilities
  • CCC Engineering Ltd (CCC)
    UAE
    Dec-19
    Risk Based Inspection (RBI) Study for Das Island Project (GTG)
  • Ma’aden Phosphate
    Saudi Arabia
    May-19
    Power & Utilities Piping Corrosion Loop Identification & Establishing Inspection Strategy
  • JGC | FLUOR BC LNG JV
    Canada
    Jun-19
    Risk-Based Inspection (RBI) Study for LNG Canada Project
  • SAIPEM
    Saudi Arabia
    Jun-19
    Risk Based Inspection (RBI) Study As Per Saep-343 For Hawiyah Gas Plant Expansion Project Hawiyah Saudi Arabia
  • DOTL
    Turkmenistan
    Jul-19
    Risk Based Inspection Assessment Integrity Services for LAM – 13, LAM – 63 & Block – 4 Offshore Platforms of DOTL
  • National Petroleum Construction Company (NPCC)
    UAE
    Jun-19
    Risk Based Inspection Study (RBI) for Project No. 7313
  • SK Engineering & Construction
    Korea
    Jan-19
    Risk Based Inspection & Corrosion Control Monitor for M Project
  • National Petroleum Construction Company (NPCC)
    UAE
    Jan-19
    Risk Based Inspection Study for Project 7275 for ADNOC Offshore -Bu-Haseer Full Field Development (FFD)
  • DOTL
    Turkmenistan
    Sep-18
    Consultancy Services Framework Agreement for Implementation of Integrity Management System
  • PETCO Sudan
    Sudan
    Oct-18
    Provision of Establishment CMLs/TMLs and Inspect Plan to build Inspection Database for PS No. 1 & MT
  • TECNICAS REUNIDAS, S.A.
    Saudi Arabia
    Aug-18
    Risk Based Inspection (RBI) Study as part of RAS TANURA – Clean Fuels Project for Saudi Aramco
  • NPCC/Saudi Aramco
    Saudi Arabia
    Jun-18
    CMP & RBI Study (Project 6285) for Fabrication and Installation of (SFNY, ZULF AND BRRI) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
  • Emirates Steel
    UAE
    Jun-18
    Risk Based Inspection
  • CCEL
    UAE
    Feb-18
    Risk Based Inspection (RBI) Study for NASR Phase II, EPC Pacakge-3
  • TANAP
    Turkey
    Nov-16
    Asset Integrity Management Services
  • DOTL
    Turkmenistan
    Feb-17
    Integrity Management Software Deployment
  • Hyundai Heavy Industries Ltd.
    Korea
    Oct-17
    Baseline Risk Based Inspection (RBI) Passport for NASR Package-2 Project
  • Saudi Aramco
    Saudi Arabia
    Oct-15
    Risk Based Inspection (RBI) Evergreening at Uthmaniyah Gas Plant
  • Groupement Berkine SH/AAC
    Algeria
    Oct-15
    RBI Implementation Project with Provision of Software and Associated Services
  • Brunei Methanol Company (BMC)
    Brunei
    Oct-16
    Risk Based Inspection (RBI) program implementation
  • JGSK Joint Venture
    Kuwait
    Mar-16
    Risk-Based Inspection (RBI) Study for KNPC Clean Fuels Project MAA Package
  • TECHNIP
    UAE
    Oct-16
    Risk Based Inspection (RBI) Study for TECHNIP
  • Saudi Aramco
    Saudi Arabia
    Oct-16
    Corrosion Management Program (CMP) at BGP
  • SK Engineering
    Korea
    Oct-16
    RBI for (CMP) Finalization
  • SAIPEM
    Saudi Arabia
    Oct-16
    Supply Specification for Risk Based Inspection (RBI) Study Karan 52/60, Karan 7, Karan TP-1 Auxiliary Platforms
  • SAIPEM
    Saudi Arabia
    Oct-16
    Risk Based Inspection Study (RBI) For ARBI 20/23 Gas Wellhead Project
  • Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    Oct-16
    Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
  • Pakistan Petroleum Limited
    Pakistan
    Oct-16
    Risk Based Inspection of stationery equipment at Sui Field Location
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Provision of Pipeline Risk Based Assessment For PETRONAS CARIGALI SDN BHD
  • Glaxo Smith Kline (GSK)
    Pakistan
    Oct-16
    As-Built P&IDs and RBI Assessment of Piping System
  • Dubai Electricity and Water Authority (DEWA)
    UAE
    Oct-16
    Integrity Inspection of Natural Gas System Piping for D, E, G, K & H Stations Dubai Electricity and Water Authority (DEWA)
  • SAIPEM
    Saudi Arabia
    Oct-15
    Risk Based Inspection for Jazan Project for SAIPEM (Equipment & Piping)
  • Hyundai Arabia Limited
    Korea
    Oct-15
    Risk Based Inspection (RBI) at Jazan Refinery & Terminal Project for Hyundai Arabia Limited
  • Saudi Aramco
    Saudi Arabia
    Oct-15
    Conduct Risk Based Inspection at Manifa Producing Facilities (MPD) for Saudi Aramco
  • ORYX GTL
    Qatar
    Oct-15
    RBI Equipment Assessment for ORYX GTL
  • Luk Oil Middle East Ltd.
    UAE
    Oct-15
    Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
  • SNGPL
    Pakistan
    Oct-15
    Pipeline Integrity Management System Implimentation
  • Dolphin Energy Limited
    UAE
    Oct-15
    Risk Based Inspection Study (RBI) for Dolphin Energy Limited
  • Saudi Aramco
    Saudi Arabia
    May-14
    RBI for Juaymah NGL Fractionation (Module 3 & 4)
  • DALEEL PETROLEUM L.L.C
    Oman
    Jul-14
    RBI at Daleel – Integrity Study of Bushra Line
  • Saudi Aramco
    Saudi Arabia
    Aug-14
    RBI Initiation & Evergreening at Yanbu Refinery
  • Saudi Aramco
    Saudi Arabia
    Nov-14
    RBI at Hawiyah Gas Plant
  • Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    Mar-14
    Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
  • Saudi Aramco
    Saudi Arabia
    Oct-14
    RBI Assessment Service Providers at HGP for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-14
    Risk Based Inspection (RBI) Assessment on K44 & K83-100 for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-14
    Risk Based Inspection (RBI) Study for PS-1 & PS-3 for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-14
    Risk Based Inspection (RBI) Static Equipment and Piping at Hawiyah GOSP – 3 & Haradh GOSP – 2 & 3 for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-14
    Risk Based Inspection (RBI) at Jeddah Refinery for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Feb-14
    RBI for Gas Oil Separation Plants (GOSP) at Hawiyah GOSP-3 and Haradh GOSP 2 & 3
  • Saudi Aramco
    Saudi Arabia
    Mar-14
    RBI for Berri Gas Plant – F20, 470 & 474 HP
  • Saudi Aramco
    Saudi Arabia
    May-14
    RBI at Khurais (KhPD) Static Equipment
  • PETRONAS FLNG 1 (L) Ltd
    Malaysia
    Apr-14
    Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 001A Pipeline RBI Study-crude
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 001B Pipeline RBI Study-Gas
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 002A Structure RBI Study-Sub Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 002B Structure RBI Study-Topside Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 004 RBI Study for Topside Equipments, Piping System and Pressure Relief Devices
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 005 Identification of Deadlegs , Small Bore Identification, injections points, corrosion monitoring and support locations, and preparation of registers
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006A Preparation of Inspection Drawings for Topside Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006B Preparation of Inspection Drawings for 8-Legged Subsea Jacket Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006C Preparation of Inspection Drawings for Topside Piping System and Equipments
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006D Preparation of Inspection Drawings for Pipelines and Risers
  • Luk Oil Middle East Ltd.
    UAE
    Oct-13
    Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
  • Qatar Aluminium Ltd. (QATALUM)
    Qatar
    Oct-13
    Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
  • Binh SON Refining & Petrochemical CO. LTD (BSR
    Viet Nam
    Oct-13
    Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
  • Saudi Aramco
    Saudi Arabia
    Oct-13
    Conduct RBI for GPD Gas Wells and Manifolds for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-13
    Risk Based Inspection (RBI) at North Jeddah Bulk Plant for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-13
    Conduct Risk Based Inspection (RBI) at JNGLF for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-13
    Risk Based Inspection (RBI) Study at AAPD & KRSN Plants.
  • Saudi Aramco
    Saudi Arabia
    Oct-13
    Additional Conduct Risk Based Inspection (RBI) at UGP for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Apr-13
    Conduct RBI at Juaymah NGL Fractionation Dept
  • Salamander Energy
    Malaysia
    Aug-14
    Work Pack of Topside for Bravo Platform plus Processing and Power Module
  • EQUION Energy Limited.
    Colombia
    Oct-13
    Integrity Management Support Services for EQUION Energy Limited.
  • Saudi Aramco
    Saudi Arabia
    Oct-13
    Conduct an RBI Services for Yanbu Refinery for Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
     May-2013
    Risk Based Inspection at K44 & K83-100 (Khursaniyah Gas Plant)
  • Bunduq Company Ltd
    UAE
    Oct-13
    Structural Integrity Assessment and Life Extension Study for WHP-E Wellhead Platform for BUNDUQ Company Limited.
  • Bunduq Company Ltd
    UAE
    Oct-13
    Facility Integrity Management System (FIMS) Implementation for Platform WHP-A ,WHP- B & EB-06 Wellhead Platforms Structure, Pipelines
  • Bunduq Company Ltd
    UAE
    Oct-13
    Facility Integrity Management System (FIMS) Implementation for WHP-B & WHP-D Wellhead Platform Structure, Pipeline & Topsides for BUNDUQ Company Limited.
  • BW Offshore Singapore Ltd
    Singapore
    Oct-13
    Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
  • Salamander Energy
    Malaysia
    Feb-13
    Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
  • Salamander Energy
    Malaysia
    Aug-12
    Pilot RBI Study for Wellhead Structure
  • Salamander Energy
    Malaysia
    Aug-12
    Pilot RBI Study for Wellhead to Process Platform /onshore
  • Saudi Aramco
    Saudi Arabia
    Oct-12
    Risk Based Inspection Study at Uthmaniyah Gas Plant for Saudi Aramco
  • Talisman Energy Limited
    Canada
    Jul-12
    Computerized Integrity Engineering Services
  • Talisman Energy Limited
    Canada
    Sep-12
    Development of Asset Register for Topside Pressurized Equipment, Piping System and PSV’s for KNPD-A Platform
  • Talisman Energy Limited
    Canada
    Nov-12
    Development of Asset Register for Jackets – 4 Legged Platform (Primary, Secondary and Tertiary) for KNPD – A Platform
  • Talisman Energy Limited
    Canada
    Nov-12
    Development of Asset Register for Subsea, Pipelines and Riser for KNPD – A Platform
  • Talisman Energy Limited
    Canada
    Nov-12
    Development of Corrosion Loops for Pressurized Equipments, Piping Systems and CAD Mark up for PFD’s (P&ID’s) for KNPD – A Platform
  • Talisman Energy Limited
    Canada
    Nov-12
    Development of Asset Register for Topside Structure (Primary, Secondary and Tertiary) for KNPD – A Platform
  • Talisman Energy Limited
    Canada
    Oct-12
    Provision of Integrity Engineer, CIMS Engineer & CIMS Specialist for Kinabalu Transition
  • Talisman Energy Limited
    Canada
    Jan-13
    Provision of Services of CIMS Engineer / Specilist,Integrity Engineer / Specilist Draftman and Techncial Assistant to be based in TML office Malaysia on full time basisor Abu Dhabi office
  • Bunduq Company Ltd
    UAE
    Oct-12
    Facility Integrity Management System Implementation for Wellhead Platform WHP-A, WHP-C and EB-06 For BUNDUQ Company Limited.
  • Bunduq Company Ltd
    UAE
    Oct-12
    Structural Integrity Assessment and Life Extension Study for WHP-C Wellhead Platform for BUNDUQ Company Limited.
  • RAK GAS
    UAE
    Oct-12
    Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
  • RAK GAS
    UAE
    Oct-12
    Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
  • Saudi Aramco
    Saudi Arabia
    Jul-12
    Conduct Risk Based Inspection (RBI) Assessment at Shedgum Gas Plant (ShGPD – FGS/PS/FS)
  • KJO
    Saudi Arabia
    Oct-11
    Establishment of Risk Based Inspection (RBI) Programs in Al-Khafji Joint Operations-KJO (for all Stationary Equipment & Piping System)
  • Saudi Aramco
    Saudi Arabia
    Oct-11
    Conduct Risk Based Inspection (RBI) Services for YNGL Plant – Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-11
    Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-11
    Risk-Based Inspection (RBI) Assessment of DHT Complex for Ras Tanura Refinery Saudi Aramco
  • ADGAS
    UAE
    Oct-11
    Development of Static Equipment Inspection Task Plans and Master Plan by using API RBI approach for ADGAS LNG Complex.
  • GASCO
    UAE
    Oct-11
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
  • DUSUP
    UAE
    Oct-10
    Provision of Risk Based Inspection (RBI) based as part of Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & -‘B’. for Dubai Supply Authority (DUSUP).
  • Saudi Aramco
    Saudi Arabia
    Oct-10
    Risk Based Inspection (RBI) Static Equipments & Piping at QSWP for Saudi Aramco
  • Salamander Energy
    Malaysia
    Aug-12
    Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
  • Egyptian LNG.
    Egypt
    Jul-11
    Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
  • Egyptian LNG.
    Egypt
    Oct-12
    Risk Based Inspection (RBI) based Small Bore Piping Integrity Program for Egyptian LNG.
  • TAKREER
    UAE
    Jul-11
    Provision of RBI Assessment for Static Mechanical Equipment
  • Groupement Reggane
    Algeria
    Dec-20
    Provision of Technical Assistance to Prepare the Triannual and Decennial Shutdown for Reggane Facilities in Reggane Nord Project
  • TANAP
    Turkey
    Oct-16
    Asset Integrity Management Services
  • ADNOC Onshore
    UAE
    Oct-16
    Updating of ADNOC Onshore Corporate Inspection Management System Procedure Document
  • Bunduq Company Ltd
    UAE
    Oct-13
    Preparation of Facility Integrity Management (FIMS) Inspection Procedures in line ADNOC Guidelines.
  • KPOC
    Malaysia
    Oct-13
    CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
  • ADGAS
    UAE
    Oct-12
    Static Equipment Inspection Task Plans and Master Plan by using API RBI approach for ADGAS LNG Complex.
  • Newfield
    UAE
    Oct-12
    Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc. (Upstream Oil & Gas)
  • Salamander Energy
    Malaysia
    Oct-12
    Pilot Risk Based Inspection (RBI) Study for Offshore Pipeline from Wellhead to Process Platform for Salamander Energy (Bualuang) Limited.
  • Salamander Energy
    Malaysia
    Oct-12
    Pilot Risk Based Inspection (RBI) Study for Wellhead Structure for Salamander Energy (Bualuang) Limited.
  • Saudi Aramco
    Saudi Arabia
    Oct-12
    Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
  • Saudi Aramco
    Saudi Arabia
    Oct-12
    Risk-Based Inspection (RBI) Assessment of DHT Complex – Saudi Aramco
  • Qatar Petroleum
    Qatar
    Oct-12
    Develop Risk Based Inspection (RBI) based inspection plans for in – plant piping within DUKHAN for Qatar Petroleum
  • KJO
    Saudi Arabia
    Oct-12
    Establishment of Risk Based Inspection (RBI) Programs in Al-Khafji Joint Operations-KJO (for all Stationary Equipment & Piping System)
  • Saudi Aramco
    Saudi Arabia
    Oct-12
    Risk Based Inspection (RBI) Static Equipment’s & Piping at QSWP for Saudi Aramco
  • Dragon Oil
    UAE
    Oct-11
    Development of Design Specification for Dragon Oil Dubai
  • Saudi Aramco
    Saudi Arabia
    Oct-11
    Training of Risk Based Inspection (RBI) Courses for Saudi Aramco
  • GASCO
    UAE
    Oct-11
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
  • GASCO
    UAE
    Oct-11
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO Ruwais. (LPG Plant)
  • GASCO
    UAE
    Oct-11
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO BAB. (Gas Processing Plant)
  • GASCO
    UAE
    Oct-11
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO BuHasa. (Gas Processing Plant)
  • GASCO
    UAE
    Oct-11
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO Pipeline.
  • KJO
    Saudi Arabia
    Oct-11
    RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software for Al-Khafji Joint Operations (KJO)
  • ADGAS
    UAE
    Oct-10
    Development of Static Equipment Inspection Task Plans & Master Plan
  • DUSUP
    UAE
    Oct-10
    Provision of Risk Based Inspection (RBI) based Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & ‘B’. for Dubai Supply Authority (DUSUP).
  • DUSUP
    UAE
    Oct-10
    Provision of Risk Based Inspection (RBI) based Asset Integrity Management Studies for Plant Piping for Dubai Supply Authority (DUSUP).
  • GASCO
    UAE
    Oct-08
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO. (ASAB – 1 & ASAB – 2)
  • CPP/Oman Tank Terminal Company L.L.C. (OTTCO)
    Oman
    Oct-20
    RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ CRUDE OIL PARK
  • Groupement Reggane
    Algeria
    Oct-20
    Provision of Technical Assistance Services to Develop the Preventive Maintenance Plans and MRP for Reggane Facilities in Reggane Nord Project
  • Petro Energy
    Sudan
    Oct-20
    Petro Energy – Provision of Reliability Engineering Services for Block-6 Facilities as Introduction to Asset Integrity Management Program
  • Daleel
    Oman
    Oct-20
    DALEEL-Provision of Consulting Services for Preventive Maintenance Optimization (PMO) Upgrade
  • BAPCO
    Sudan
    Oct-20
    Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
  • Abu Dhabi National Oil Company (ADNOC Onshore)
    UAE
    Oct-13
    Consultancy Services for Periodic Equipment Integrity Review (PEIR)
  • Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    UAE
    Oct-12
    Reliability & availability study for ADGAS Flow measuring equipment’s.
Health, Safety and Environmental Services
  • CLIENT
    LOCATION
    YEAR
    TITLE
  • ADNOC Sour Gas
    UAE
    Oct-20
    Updating the Existing SGD Operations HSEIA
  • ADNOC Distribution
    UAE
    Oct-20
    Consultancy Services for Operation Health, Safety & Environmental Impact Assessment (HSEIA) Study
  • DOTL Dragon Oil (Turkmenistan) Limited
    Turkmenistan
    Oct-20
    Safety Case for Onshore Facility
  • Target Engineering Construction Company L.L.C.
    UAE
    Oct-19
    HSE Studies as per ADNOC Project Specification for BUNDUQ
  • ADNOC Refining
    UAE
    Oct-19
    Health, Safety & Environmental Impact Assessment (HSEIA) Services for Refinery Off Gases Recovery Project – Project No. 6142
  • ADNOC Refining
    UAE
    Oct-19
    Health, Safety & Environmental Impact Assessment (HSEIA) Services for New Linear Alkyl Benzene (LAB) Complex at Ruwais – Project No. 6159
  • NDC National Drilling Company
    UAE
    Oct-17
    HSE Audit Surveys at Onshore & Offshore Rigs for National Drilling Company
  • NDC National Drilling Company
    UAE
    Oct-15
    HSE Audit Surveys at Onshore & Offshore Rigs for National Drilling Company (Variation Order No. 1)
  • NDC National Drilling Company
    UAE
    Oct-17
    HSE Audit at Onshore and Offshore Rigs (Variation Order No. 2)
  • ZADCO Zakum Development Company
    UAE
    Oct-12
    Provide HSECES Services on Upper Zakum (South Satellite Platform, North Satellite Platform, West Satellite Platform)
  • ZADCO Zakum Development Company
    UAE
    Oct-12
    Provide HSECES Services including the 16 wellhead Platforms and CPC Platforms
  • ZADCO Zakum Development Company
    UAE
    Oct-12
    Provide HSECES Services for UAD CPC and WHPT Facilities
  • KPOC Kebabangan Petroleum Operating Company
    UAE
    Oct-13
    Identification of SCE and System Development of Verification Scheme
  • ADOC Abu Dhabi Oil Co. Ltd.
    UAE
    Oct-15
    Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)
  • QP Qatar Petroleum
    Qatar
    Oct-15
    Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
  • QP Qatar Petroleum
    Qatar
    Oct-17
    Variation Order for Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
  • BOROUGE Abu Dhabi Polymers Company Ltd
    UAE
    Oct-17
    Pro-forma Call – Off Order No. PCO/HSEIA/17/ 001 – Provision of HSEIA (Phase 1) for CBMB FEED Services Project (PO/725)
  • TAKREER (ADNOC Refining)
    Malaysia
    Oct-16
    BeAAT Expansion Project – Project No. 5649 Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study
  • TAKREER (ADNOC Refining)
    UAE
    Oct-15
    Waste Heat Recovery Project – Project No. 6143 Health, Safety and Environmental Impact Assessment (HSEIA) Study
  • TAKREER (ADNOC Refining)
    UAE
    Oct-15
    Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
  • TAKREER (ADNOC Refining)
    UAE
    Oct-13
    Norm Handling Treatment and Disposal Project at BeAAT Project No.5640 Phase 2 & 3 (HSEIA) Study
  • TAKREER (ADNOC Refining)
    UAE
    Oct-13
    Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA – Project No.5643
  • GASCO Abu Dhabi Gas Industries Ltd.
    UAE
    Oct-13
    Asset Register Verification & HSECES Implementation for GASCO Pipeline Network Division
  • Qatar Fuel Company
    Qatar
    Oct-12
    Safety & Environment Risk Analysis for WOQOD Lube Oil Blending Plant – Mesaieed
  • TAKREER (ADNOC Refining)
    UAE
    Oct-11
    Independent Audit Verification for HSECES at ADRD & RRD
  • QP Qatar Petroleum
    Qatar
    Oct-10
    Consultancy Services for HSE Integrity Study of 70 Petrol Stations
  • SONATRACH
    Algeria
    Jul-20
    Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
  • SONATRACH
    Algeria
    Oct-17
    Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
  • TAKREER
    UAE
    May-19
    HSE Critical Integrity Verification for TAKREER Facilities
  • TAKREER
    UAE
    Dec-12
    Independent Audit Verification for HSECES at ADRD and RRD
  • TAKREER
    UAE
    Mar-10
    PSM & HSE Audit for TAKREER Refineries. / including ADNOC Energy Complex Building.
  • Pak-Arab Refinery Limited (PARCO)
    Pakistan
    Mar-15
    Third party QSHE & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
  • QATAR Petroleum
    Qatar
    Jan-2013
    Integrity & HSE Study for 70 Petrol Station of QATAR Petroleum
  • National Drilling Company (NDC)
    UAE
    Jan-13
    HSE Audit Survey at Onshore & Offshore Rigs
  • National Drilling Company (NDC)
    UAE
    Oct-11
    HSE Audit Surveys at Onshore & Offshore Rigs
  • Q-CON
    Pakistan
    Jun-09
    Risk Analysis for Installing Vapor recovery arm
  • Fibrex Construction LLC (GRC-1)
    US
    Oct-20
    Environmental Monitoring & Testing of GRC1
  • ITALCONSULT
    UAE
    Oct-20
    Preliminary Envinmental Review (PER) for Upgrading of the Road Al Fayato Seih Shuaib E75
  • MOHAMMED ABDULMOHSIN AL-KHARAFI & SONS
    UAE
    Oct-20
    Construction Environmental Management Plan for Construction of Internal Roads & Infrastructure in Baniyas East & West Stage II
  • ALTORATH INTERNATIONAL ENGINEERING CONSULTANTS LLC
    UAE
    Oct-20
    Provision of 3rd Party Approval of Detailed Design Package & Pre-Commissioning Package of NG/SNG Installation Pipe Work
  • FIBREX CONSTRUCTION LLC
    UAE
    Oct-20
    Environmental Monitoring & Testing of Yasra Plot Development Staff Accommodation in Yas Island
  • AL FAHJAN TRANSPORTATION & GENERAL CONTRACTING
    UAE
    Oct-19
    Construction Environmental Management Plan for Development of Asharej Roundabout in AlAin
  • WESCO LLC
    UAE
    Oct-20
    Environmental Monitoring & Testing of Mussafah Premises
  • GULF CRYO EMIRATES INDUSTRIAL GASES
    UAE
    Oct-20
    Environmental Monitoring & Testing of ICAD 3 OFFICE
  • AL GHAZAL TRANSPORT
    UAE
    Oct-20
    Environmental Monitoring & Testing Of their Workshop Premises
  • GHANTOOT TRANSPORT & GENERAL CONTRACTING LLC
    UAE
    Oct-20
    Environmental Monitoring & Testing OF Etihad Rail Stage 2&3 Project C0304-Package 2 B
  • THE RITZ CARLTON HOTEL ABU DHABI
    UAE
    Oct-20
    Environmental Monitoring & Testing Of Hotel Premises
  • EMIRATES LIVESTOCK & MEAT PRODUCTS TRADING COMPANY LLC
    UAE
    Oct-20
    Environmental Impact Assessment (EIA) for their Existing Facility in Jebel Ali
  • CONTRACTING & TRADING Co. (CATCO)
    UAE
    Oct-20
    Environmental Monitoring & Testing for Ruwais Project Laydown Office & Mussafah Premises
  • EMERSON AUTOMATION SOLUTIONS BLDG B
    UAE
    Oct-20
    Environmental Monitoring & Testing for Building B
  • SAEED AL ZAABI TYRE FACTORY
    UAE
    Oct-20
    Environmental Monitoring & Testing for factory in Mussafah
  • Larsen & Toubro Limited
    UAE
    Oct-20
    • Development and preparation of Construction Environmental Management Plan (CEMP) and Quarterly Audit for Supply of Recycled water along Abu Dhabi Al Ain Road-Construction of Pipelines from Main Pump Station to Intermediate Pump Station-Package B by Abu Dhabi Distribution Company (ADDC)
  • MACE
    UAE
    Oct-20
    ·     Development and preparation of Construction Environmental Management Plan (CEMP) for Internal Roads and Infrastructure for 44 Plots at Al Wathba and Al Khatim (Package-1)
  • Al Jaber Energy Services LLC
    UAE
    Oct-20
    Development and preparation of Construction Environmental Management Plan (CEMP) for EPC for Early Civil and Site Preparation Works (Package 5-Onshore Early Works)
  • Tecton Engineering and Construction LLC
    UAE
    Oct-20
    Development and preparation of Construction Environmental Management Plan (CEMP) and Quarterly Audit for Supply of Recycled water along Abu Dhabi Al Ain Road-Construction of Pipelines from Main Pump Station to Intermediate Pump Station-Package A by Abu Dhabi Distribution Company (ADDC)
  • ADC Energy Systems
    UAE
    Oct-20
    Development and preparation of Construction Environmental Management Plan (CEMP) for Shams Development District Cooling
  • Total Abu Al Bukhoosh
    UAE
    Oct-20
    Environmental Baseline Assessment as per below• Soil Sampling and Analysis• Ground Water Sampling and Analysis
  • URJA BHARAT PTE LTD/ADNOC Onshore
    UAE
    Oct-20
    Environment Impact Assessment Studies & Preparation of Community Engagement Plan & for Wells Drilling and Testing Operations in Onshore Block 1, UAE
  • APT GLOBAL MARINE SERVICES LLC
    UAE
    Oct-20
    Environmental Monitoring & Testing
  • Ajman Steel Tubes & Pipes Ind LLC
    UAE
    Oct-20
    Stack Emission Monitoring
  • MACE
    UAE
    Oct-20
    To perform the following laboratory test;• Test for Hydrocarbon present in the discharge water including diesel (6 tests/month)• Test for solid suspensions of the discharge water present in the sample (6 tests /month
  • Neopharma LLC
    UAE
    Oct-19
    Environmental Monitoring & Testing
  • MACE
    UAE
    Oct-19
    Environmental Permit Application for Rehabilitation and Replacement of Existing Sewer Lines in Abu Dhabi Island- Part 5 project
  • Maatouk 1960 Factory
    UAE
    Oct-19
    Environmental Monitoring & Testing • Stack Emission Monitoring (Two Locations).• Noise Level Monitoring (Three Points)• Indoor Air Quality with Particulate Matter (One Point)• Chemical and Biological analysis of Potable Water (One Sample)
  • Ministry of Infrastructure/ Core Engineering Consultancy
    UAE
    Oct-19
    Environmental Consultancy (PER) for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
  • Ministry of Infrastructure/ Core Engineering Consultancy
    UAE
    Oct-19
    Terrestrial Survey for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
  • MACE Contractor
    UAE
    Oct-19
    Construction Environmental Management Plan for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
  • ADC Energy
    UAE
    Oct-19
    Construction Environmental Management Plan for Saadiyat DCP1-Electrical Substation” project
  • Abu Dhabi Port Company/ Energy Management Services
    UAE
    Oct-19
    Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
  • RTA/ Western Bainoona Group.
    UAE
    Oct-19
    Environmental Baseline Survey of Dubai Site
  • Al Khaznah Tannery
    UAE
    Oct-19
    Environmental Monitoring & TestingFollowing study are part of the scope; 1. Indoor Air Quality 2. Ambient Air Quality 3. Stack Emission Monitoring 4. Noise Level Monitoring
  • Express Pack Print
    UAE
    Oct-19
    Environmental Monitoring & Testing of JAFZA FacilityFollowing study are part of the scope; 1. Indoor Air Quality without Dust 2. Indoor Air Quality with Dust 3. Noise Level Monitoring 4. Light Intensity 5. Heat/Temp
  • National Cement Factory
    UAE
    Oct-19
    Environmental Monitoring & Testing of Musaffah Facility To perform the following study; 1. Ambient Air Quality 2. Noise Level Monitoring 3. Stack Emission
  • EMERSON AUTOMATION SOLUTIONS. BLDG A
    UAE
    Oct-19
    Environmental Monitoring & Testing of Dubai Facility To perform the following study; 1. Indoor Air Quality 2. Personnel Monitoring
  • National Marine Dredging Company (NMDC)
    UAE
    Oct-18
    Decommissioning Environmental Management Plan (DEMP) 1. Preparation of DEMP in accordance with EAD’s Technical Guidance Document for Decommissioning Environmental Management Plan (DEMP). 2. Velosi shall conduct compliance audits for DEMP implementation, if required.
  • MACE Contractors
    UAE
    Oct-18
    Development of Construction Environment Management Plan (CEMP) for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
  • Emirates Future
    UAE
    Oct-18
    Environmental Impact Assessment (EIA) Study of Animal Breading Farm Suweihan Area Plot no 57-05-801-330
  • Pakistan Tobacco Company (PTC)
    Pakistan
    Oct-19
    Environment Site Assessment (ESA)-Phase -1
  • Pakistan State Oil Company Limited (PSO)
    Pakistan
    Oct-16
    Noise and Emission Testing of Aviation Equipment Based at Islamabad as per NEQ’s requirements.
  • Pakistan State Oil Company Limited (PSO)
    Pakistan
    Oct-16
    Noise and Emission Testing of Aviation Equipment Based at Peshawar Airport as per NEQ’s requirements.
  • Pakistan Petroleum Limited (PPL)
    Pakistan
    Oct-16
    Consultancy Services For Health, Safety & Environment (HSE) Monitoring For Exploration, Drilling, Plant Installation And Pipeline Laying Project Activities In All PPL Fields/Locations Including Exploration Blocks/Mining Leases On Call-Out Basis For Three Years Cycle.
  • Government of Gilgit Baltistan Maintenance Division PWD Gilgit
    Pakistan
    Oct-17
    Construction/Extension of sustainability master plan for DHQ Hospital & Shaheed Saif-ur-Rehman Hospital Gilgit
  • Pak-Arab Refinery Limited (PARCO)
    Pakistan
    Oct-15
    Third party QSHE (Quality, Safety, Health & Environment) & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
  • Oil and Gas Regularity Authority (OGRA)
    Pakistan
    Oct-12
    CNG Station 2012 (Including Integrity & HSE (Health Safety and Environment) Studies)
  • Oil and Gas Regularity Authority (OGRA)
    Pakistan
    Oct-14
    Tank Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
  • Oil and Gas Regularity Authority (OGRA)
    Pakistan
    Oct-14
    CNG Station 2014 (Including Integrity & HSE (Health Safety and Environment) Studies)
  • Oil and Gas Regularity Authority (OGRA)
    Pakistan
    Oct-14
    Inspection of Oil Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
  • Sui Northern Gas Pipelines Limited (SNGPL)
    Pakistan
    Oct-07
    Technical Audit of Sui Nothern Gas Pipelines Limited
  • SHELL IRAQ
    Iraq
    Oct-14
    Third Party Technical Integrity Verification Services
  • BOROUGE
    UAE
    Oct-17
    Pro-forma Call – Off Order No. PCO/HSEIA/17/ 001 – Provision of HSEIA (Phase 1) for CBMB FEED Services Project (PO/725)
  • NDC (National Drilling Company)
    UAE
    Oct-17
    HSE Audit Survey at Onshore & Offshore Rigs.
  • TAKREER
    UAE
    Oct-14
    Norm Handling Treatment and Disposal Project at BeAAT Project No.5640 Phase 2&3 (HSEIA) Study. Including following studies:
  • TAKREER
    UAE
    Oct-13
    Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5643
  • TAKREER
    UAE
    Oct-15
    Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
  • TAKREER
    UAE
    Oct-15
    BeAAT Expansion Project- Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5649
  • TAKREER
    UAE
    Oct-16
    BeAAT Expansion Project- Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5649
  • Woqod Lube Oil Blending Plant
    Qatar
    Oct-11
    Feasibility Study for Safety & Environmental Risk Analysis for Lube Oil Blending Plant
  • ADNOC
    UAE
    Oct-10
    Health, Safety & Environment Impact Assessment (HSEIA) Study for car park of ADNOC
  • MUSANADA
    UAE
    Oct-14
    Quality and HSE (Health Safety and Environment) Audit Consultancy Pertaining to School by Musanada
  • Borouge
    UAE
    Oct-13
    External Audit on PSM System in Olefins (EU2) Poly Olefins (PE3) for Year 2013
  • National Drilling Company (NDC)
    UAE
    Oct-12
    HSE (Health Safety and Environment) Audit Surveys
  • Abu Dhabi Company for Onshore Oil Operation (ADNOC Onshore)
    UAE
    Oct-11
    Consultancy Service for Periodic Equipment Integrity Review (PEIR) for ADCO
  • TAKREER
    UAE
    Oct-11
    Independent Audit Verification for HSECES (Health, Safety & Environmental Critical Equipment Systems)
  • TAKREER
    UAE
    Oct-09
    Process Safety Management and Safety Audit
  • Abu Dhabi Gas Industries (GASCO)
    UAE
    Oct-13
    Asset Register Verification & HSECES (Health, Safety & Environmental Critical Equipment Systems) Study
  • Abu Dhabi Gas Industries (GASCO)
    UAE
    Oct-14
    Asset Register Verification & HSECES (Health, Safety & Environmental Critical Equipment Systems) Performance Standard Implementation for GASCO Pipeline Network Division – Phase II
  • Zakum Development Company (ZADCO)
    UAE
    Oct-12
    HSECES (Health, Safety & Environmental Critical Equipment Systems) Services
  • Zakum Development Company (ZADCO)
    UAE
    Oct-13
    HSECES (Health, Safety & Environmental Critical Equipment Systems)
  • KPOC
    Malaysia
    Oct-13
    CTR # 8 – Identification of Safety Critical Equipment (SCE) System and development of verification scheme.
  • Qatar Petroleum
    Qatar
    Oct-10
    Provision of Consultancy Services for HSE (Health Safety and Environment) Integrity Study of Petrol Stations
  • Oman Gas Company (OGC)
    Oman
    Oct-14
    QRA Studies for Salalah LPG Project.
  • ORPIC
    Oman
    Oct-15
    Risk Contributor Assessment Study For MAF Refinery
  • Pakistan Petroleum Limited (PPL)
    Pakistan
    Oct-15
    HAZOP Study of ESD & Blowdown Valves
  • KCA Deutag Drilling G.M.B.H Islamabad
    Pakistan
    Oct-15
    Third Party Services for Drops Survey of Onshore Rigs 2015 Call Out Basis KCA Deutag Drilling G.M.B.H Islamabad
  • MOL Pakistan Oil & Gas Co. B.V.
    Pakistan
    Oct-15
    Fire and Gas Equipment Audit Of Mol Production Facilities
Engineering Services
  • CLIENT
    LOCATION
    YEAR
    TITLE
  • ADNOC Refining
    UAE
    Oct-19
    Integrity and Remaining Life Assessment (RLA) of Boiler (121-B-01) at Ruwais Refinery East
  • ADNOC Gas Processing
    UAE
    Nov-19
    Remaining Life Assessment for Waste Heat Recovery Boiler
  • Abu Dhabi Oil Refining Company (TAKREER)
    UAE
    Oct-18
    Integrity and Remaining Life Assessment (RLA) Of HP Boiler at Ruwais Refinery (EAST)
  • ADGAS
    UAE
    Sep-17
    ADGAS-LNG Trains Operational Life Extension Independent Overall Assessment and Verification
  • QAFCO
    Qatar
    Jul-15
    Consultancy Services in Carrying-Out Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment & Structures
  • BUNDUQ Company Limited
    UAE
    Oct-14
    Pipeline Integrity Assessment and Life Extension Study for 6 Nos. Pipelines
  • BUNDUQ Company Limited
    UAE
    Oct-12
    BUNDUQ – Pipeline Integrity Assessment and Life Extension for 2nos Pipeline
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Provision Of Fitness For Services (FFS) Assessment Of Pipeline For Petronas Carigali Sdn Bhd- Sabah Operations
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Engineering Consultancy PL196 Fitness for Services (FFS ) as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Life extension assessment Study (LEA) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Fitness for Services (FFS ) PIPELINE ENGINEERING CONSULTANCY as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Life extension assessment Study (LEA) + Fitness for Services (FFS ) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-16
    Fitness for Services (FFS) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
  • SNGPL
    Pakistan
    Oct-15
    Pipeline Integrity Management Program
  • SPETCO
    Kuwait
    Feb-15
    Residual Life Assessment for Plant & Equipment’s
  • Daleel Petroleum L.L.C.
    UAE
    Jul-20
    Integrity Study of Bushra Line 33km for DALEEL
  • ADGAS
    UAE
    Feb-17
    ADGAS-LNG Trains Operational Life Extension Independent Overall Assessment and Verification
  • Qatar Fertilizer Company (QAFCO)
    Qatar
    Oct-15
    Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
  • Qatar Petroleum
    Qatar
    Oct-14
    Fitness For Service Of LPG Sphere 2109FB for Qatar Petroleum
  • Qatar Petroleum
    Qatar
    Oct-13
    Conduct of FFS Analysis for 2123FB Hydrogen Bullet at Refinery Mesaieed for Qatar Petroleum
  • Qatar Petroleum
    Qatar
    Oct-13
    Conduct of FFS Analysis for 2123FA Hydrogen Bullet at Refinery Mesaieed for Qatar Petroleum
  • Abu Dhabi Oil Refining Company (TAKREER)
    UAE
    Oct-11
    Integrity and Remaining Life Assessment of High Pressure Equipment at Ruwais Refinery
  • Abu Dhabi Gas Industries Ltd (GASCO)
    UAE
    Oct-07
    API 579 FFS Level III Study for HP Amine Absorber 33V101
  • Abu Dhabi Gas Industries Ltd (GASCO)
    UAE
    Oct-07
    Fitness for Service study – Amine Regenerator (13-C-102)
  • Abu Dhabi Gas Industries Ltd (GASCO)
    UAE
    Oct-07
    Amine Regenerator Reflux drum Inlet Pigging Piping 30-1010-AS
  • Abu Dhabi Gas Industries Ltd (GASCO)
    UAE
    Oct-07
    GASCO Fitness for Service for pure pentane storage drum GASCO-(7-C-410) Ruwais Plant
  • BUNDUQ Company Limited
    UAE
    Oct-12
    FFS and Life Extension Services for Pressure Vessels
  • BOROUGE
    UAE
    Oct-12
    Provision of fitness for service assessment of B2 steam boiler (53-fb-401 c)
  • Black Cat
    Qatar
    Oct-13
    FFS for Existing Air Receiver Vessels (22-V-4139 & 22-V-7330)
  • BUNDUQ Company Limited
    UAE
    Oct-12
    Structural Integrity & Life Extension Study for WHP-B
  • BUNDUQ Company Limited
    UAE
    Oct-12
    BUNDUQ – Structural Integrity & Life Extension Study for WHP-C
  • BUNDUQ Company Limited
    UAE
    Oct-12
    Structural Integrity & Life Extension Study for WHP-E
  • BUNDUQ Company Limited
    UAE
    Oct-12
    Structural Integrity & Life Extension Study for WHP-F
  • BUNDUQ Company Limited
    UAE
    Oct-12
    Structural Integrity Assessment & Life Extension Study for EB-04
  • BUNDUQ Company Limited
    UAE
    Oct-15
    Structural Integrity Assessment & Life Extension Study for EB-37
  • BUNDUQ Company Limited
    UAE
    Oct-12
    FFS and Life Extension Services for Pressure Vessels for GSP Platform
  • Dubai Supply Authority (DUSUP)
    UAE
    Oct-10
    DUSUP Windgirder FFS Study
  • Engro Fertilizers
    Pakistan
    Oct-14
    Remaining Life Assessment for Safety Critical Equipments for Engro Fertilizers
  • Worley Parsons
    Oct-09
    Plant CBA Reactors under cyclic service Fitness for Service level –-3 Assessment.
  • GPS/ ANOH Gas Processing Company (AGPC)
    Nigeria
    Aug-20
    Development Operating Manual and Pre-Commissioning and Commissioning Manual for ANOH Gas Plant Project, Nigeria
  • Adnoc Onshore / Al Asab
    UAE
    Dec-19
    Development of Operating Manual and Operating Procedure as a Part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
  • Bashayer Pipeline Company (BAPCO)
    Sudan
    June-2019
    Development of Operating Manuals & Procedures as Part of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
  • DOTL
    Turkmenistan
    Mar-18
    Consultancy Work For Developing OPM And Company Systems & Procedures
  • L & T / Al Dhafra Petroleum Company Limited
    UAE
    Nov-18
    Preparation of Operation and Maintenance Manual for Haliba Field Development Project, Abu Dhabi
  • ADNOC Onshore
    UAE
    Oct-17
    Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for ASAB & SAHIL Contract No. 16079.01
  • ADNOC Onshore
    UAE
    Oct-17
    Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for SHAH / QUSAHWIRA / MENDER Contract No. 16079.02
  • ADNOC Onshore
    UAE
    Oct-17
    Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for TPO Contract No. 16079.03
  • ADNOC Onshore
    UAE
    Oct-17
    Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for BAB Contract No. 16079.04
  • ADNOC Onshore
    UAE
    Oct-17
    Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for NEB Contract No. 16079.05
  • ADNOC Onshore
    UAE
    Oct-17
    Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for ASAB GAS & BAB GAS Contract No. 16079.06
  • TAKREER
    UAE
    Oct-14
    Consultancy Services for Updating Operating Manual for Abu Dhabi Refinery
  • KPOC
    Malaysia
    Oct-13
    CTR 011 – Preparation of Pipeline Operating Manuals
  • KPOC
    Malaysia
    Oct-13
    CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
  • KPOC
    Malaysia
    Oct-13
    CTR-013 – Preparation of Maintenance Standard Operating Procedures (SOPs)
  • LUKOIL
    UAE
    Oct-13
    Operation and Maintenance Regulations development
  • Bunduq Company Ltd
    UAE
    Oct-13
    Preparation of Facility Integrity Management (FIMS) Inspection Procedures in line ADNOC Guidelines.
  • MURPHY
    Malaysia
    Oct-13
    Development & Implementation of Integrated Maintenance & Reliability System
  • Al-Khafji Joint Operations-KJO
    Saudi Arabia
    Oct-10
    Reliability and Maintenance effectiveness Implementation
  • Abu Dhabi Oil Co., Ltd.
    UAE
    Sep-20
    Implementation of Maintenance & Integrity Audit Gap Bridging Measures
  • ADNOC
    UAE
    Aug-20
    First Call Out No. 1 for Development of Asset Integrity Dashboard User Manual as part of Agreement for Asset Integrity Consultancy Studies and Technical Support Services on Call out Basis
  • Bashayer Pipeline Company (BAPCO)
    Sudan
    June-2019
    Development of AIMS Framework as Part of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
  • TANAP
    Turkey
    Oct-16
    Asset Integrity Management Services
  • Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    Oct-16
    Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
  • ADCO
    UAE
    Oct-15
    Updating of ADCO Corporate Inspection Management System Procedure Document
  • KPOC
    Malaysia
    Oct-13
    CTR. 009 – Preparation of AIMS System framework and associated documentation
  • ADGAS
    UAE
    Oct-10
    Development of Static Equipment Inspection Task Plans & Master Plan
  • KPOC
    Malaysia
    Oct-13
    Provision of Asset & Operation Integrity Services
  • LUKOIL
    UAE
    Oct-13
    Operation and Maintenance Regulations development
  • MURPHY
    Malaysia
    Oct-13
    Development & Implementation of Integrated Maintenance & Reliability System
  • Al-Khafji Joint Operations-KJO
    Saudi Arabia
    Oct-10
    Reliability and Maintenance effectiveness Implementation
  • CPP/Oman Tank Terminal Company L.L.C. (OTTCO)
    Oman
    Apr-20
    RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ CRUDE OIL PARK
  • Al-Asab / ADNOC
    UAE
    Jan-20
    Asset Integrity Management Services (AIMS) as part of EPC for OGD-II and OGD-0 in Asab Area, ADNOC Onshore
  • BAPCO
    Sudan
    Jul-19
    Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
  • State Life
    Pakistan
    Jul-16
    Hiring Consultancy Services for Survey, Design and Supervision for Upgrading of Fire Fighting Systems for State Life Buildings All Over Pakistan
  • Musanada
    UAE
    Jul-20
    Inspection of Musanada Buildings
  • Thales Advanced Solutions Ltd
    UAE
    Sep-20
    Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
  • SONATRACH
    Algeria
    Oct-17
    Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
Software Services
  • CLIENT
    LOCATION
    YEAR
    TITLE
  • TANAP
    Turkey
    Oct-16
    Asset Integrity Management Services
  • Petro Energy
    Sudan
    Oct-19
    Petro Energy – Provision of Reliability Engineering Services for Block-6 Facilities as Introduction to Asset Integrity Management Program
  • BAPCO
    Sudan
    Jul-19
    Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Oct-20
    VAIL Plant EIRMS Implementation Services for LAM-C, LAM-22, LAM-13 & LAM-63 Offshore Platforms Using EIRMS Modleu
  • ADNOC LNG
    UAE
    Sep-20
    SAP Functional Location Restructuring
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Dec-19
    Implementation of EIRMS Services for LAM-28, LAM-A and LAM-B Offshore Platforms Using Velosi VAIL Plant EIRMS Module
  • Dragon Oil Turkmenistan Limited
    Turkmenistan
    Mar-19
    Frame Work Agreement for Supply of Integrity Management Systems Additional Modules for – PSVMS & EIRMS
  • STAR RAFINERI
    Turkey
    Apr-18
    Maintenance Master Data Collection, Creation, Cleansing, Enrichment and Preparation Load Ready Files Project for Computerized Maintenance Management System (CMMS)
  • Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    Feb-20
    Risk Based Inspection Assessment Integrity Services for LAM – 10, LAM – 75, ZHD – 21 & ZHD – 60 Offshore Platforms of DOTL
  • OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)
    Oman
    Apr-20
    RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
  • Groupement Reggane
    Algeria
    Dec-19
    Provision of Technical Assistance To Prepare The Triannual and Decennial Shutdown For Reggane Facilities
  • CCC Engineering Ltd (CCC)
    UAE
    Dec-19
    Risk Based Inspection (RBI) Study for Das Island Project (GTG)
  • DOTL
    Turkmenistan
    Jul-19
    Risk Based Inspection Assessment Integrity Services for LAM – 13, LAM – 63 & Block – 4 Offshore Platforms of DOTL
  • National Petroleum Construction Company (NPCC)
    uae
    Jun-19
    Risk Based Inspection Study (RBI)
  • National Petroleum Construction Company (NPCC)
    UAE
    Jan-19
    Risk Based Inspection Study for ADNOC Offshore -Bu-Haseer Full Field Development (FFD)
  • DOTL
    Turkmenistan
    Sep-18
    Consultancy Services Framework Agreement for Implementation of Integrity Management System
  • PETCO Sudan
    Sudan
    Oct-18
    Provision of Establishment CMLs/TMLs and Inspect Plan to build Inspection Database for PS No. 1 & MT
  • TECNICAS REUNIDAS, S.A.
    Saudi Arabia
    Aug-18
    Risk Based Inspection (RBI) Study as part of RAS TANURA – Clean Fuels Project for Saudi Aramco
  • NPCC/Saudi Aramco
    Saudi Arabia
    Jun-18
    CMP & RBI Study (Project 6285) for Fabrication and Installation of (SFNY, ZULF AND BRRI) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
  • Emirates Steel
    UAE
    Jun-18
    Risk Based Inspection
  • JGC/SONATRACH
    Algeria
    Jul-18
    Criticality Analysis, FMEA, RCM and RBI
  • CCEL
    UAE
    Feb-18
    Risk Based Inspection (RBI) Study for NASR Phase II, EPC Pacakge-3
  • DOTL
    Turkmenistan
    Feb-17
    Integrity Management Software Deployment
  • Hyundai Heavy Industries Ltd.
    Korea
    Oct-17
    Baseline Risk Based Inspection (RBI) Passport for NASR Package-2 Project
  • Groupement Berkine SH/AAC
    Algeria
    Oct-16
    RBI Implementation Project with Provision of Software and Associated Services
  • Brunei Methanol Company (BMC)
    Brunei
    Oct-16
    Risk Based Inspection (RBI) program implementation
  • TECHNIP
    UAE
    Oct-16
    Risk Based Inspection (RBI) Study for TECHNIP
  • Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    Oct-16
    Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
  • Pakistan Petroleum Limited
    Pakistan
    Oct-16
    Risk Based Inspection of stationery equipment at Sui Field Location
  • ORYX GTL
    Qatar
    Oct-15
    RBI Equipment Assessment for ORYX GTL
  • Luk Oil Middle East Ltd.
    UAE
    Oct-15
    Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
  • SNGPL
    Pakistan
    Oct-15
    Pipeline Integrity Management System Implimentation
  • Dolphin Energy Limited
    UAE
    Oct-15
    Risk Based Inspection Study (RBI) for Dolphin Energy Limited
  • DALEEL PETROLEUM L.L.C
    UAE
    Jul-14
    RBI at Daleel – Integrity Study of Bushra Line
  • Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
    Malaysia
    Mar-14
    Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
  • PETRONAS FLNG 1 (L) Ltd
    Malaysia
    Apr-14
    Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 001A Pipeline RBI Study-crude
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 001B Pipeline RBI Study-Gas
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 002A Structure RBI Study-Sub Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 002B Structure RBI Study-Topside Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 004 RBI Study for Topside Equipments, Piping System and Pressure Relief Devices
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 005 Identification of Deadlegs , Small Bore Identification, injections points, corrosion monitoring and support locations, and preparation of registers
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006A Preparation of Inspection Drawings for Topside Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006B Preparation of Inspection Drawings for 8-Legged Subsea Jacket Structure
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006C Preparation of Inspection Drawings for Topside Piping System and Equipments
  • Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    Oct-13
    KPOC CTR 006D Preparation of Inspection Drawings for Pipelines and Risers
  • Luk Oil Middle East Ltd.
    UAE
    Oct-13
    Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
  • Qatar Aluminium Ltd. (QATALUM)
    Qatar
    Oct-13
    Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
  • Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    Oct-13
    Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
  • EQUION Energy Limited.
    Colombia
    Oct-13
    Integrity Management Support Services for EQUION Energy Limited.
  • Bunduq Company Ltd
    UAE
    Oct-13
    Facility Integrity Management System (FIMS) Implementation for Platform WHP-A ,WHP- B & EB-06 Wellhead Platforms Structure, Pipelines
  • Bunduq Company Ltd
    UAE
    Oct-13
    Facility Integrity Management System (FIMS) Implementation for WHP-B & WHP-D Wellhead Platform Structure, Pipeline & Topsides for BUNDUQ Company Limited.
  • BW Offshore Singapore Ltd
    UAE
    Oct-13
    Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
  • Salamander Energy
    Malaysia
    Feb-13
    Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
  • Salamander Energy
    Malaysia
    Aug-12
    Pilot RBI Study for Wellhead Structure
  • RAK GAS
    UAE
    Oct-12
    Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
  • RAK GAS
    UAE
    Oct-12
    Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
  • DUSUP
    UAE
    Oct-10
    Provision of Risk Based Inspection (RBI) based as part of Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & ‘B’. for Dubai Supply Authority (DUSUP).
  • Salamander Energy
    Malaysia
    Aug-12
    Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
  • Egyptian LNG.
    Egypt
    Jul-11
    Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
  • Egyptian LNG.
    Egypt
    Jul-11
    Risk Based Inspection (RBI) based Small Bore Piping Integrity Program for Egyptian LNG.
  • Newfield
    UAE
    Jul-11
    Provision of RBI Assessment for Static Mechanical Equipment
  • OIL & GAS DEVELOPMENT COMPANY LIMITED
    Pakistan
    Aug-20
    HIRING OF NDT. MIA. RBI & OTHER INSPECTION & CERTIFICATION SERVICES
  • Pakistan Petroleum Limited (PPL)
    Pakistan
    Aug-20
    MAINTENANCE AND SUPPORT SERVICES OF VAIL (VELOSI ASSET INTEGRITY LIMITED) PLANT SOFTWARE FOR THREE YEARS
  • Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    Sep-20
    VAIL Plant Software License Agreement Extension for EIRMS & PSVMS Modules for 3 Years
  • Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    Feb-20
    SOW for RBI Assessment and Implementation for VAIL-Plant PIMS, SIMS, & PEMS for LAM-10, LAM-75, ZHD-21, and ZHD-60
  • Daleel Petroleum LLC
    Oman
    Oct-19
    Provision of Consulting Services for Preventive Maintenance Optimization (PMO) upgrade.
  • ILK Construction
    Turkmenistan
    Oct-19
    EPIC(Engineering, Procurement, Construction, Transportation, Installation, Commissioning) for three (3) New Wellhead Towers & Associated Pipelines Network for Water Injection (LAM Oilfield)
  • ADNOC LNG
    Abudhabi
    Sep-19
    One ERP EAM Interface Development
  • Idemitsu Kosan Co., Ltd.
    Vietnam
    Jan-19
    Provision of Asset Integrity Management System (AIMS) and Support ServicesAIMS Modules and User Licenses
  • Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    Dec-18
    VAIL-Plant Annual Support/Maintenance and Modifications
  • National Petroleum Construction Company (NPCC)
    UAE
    May-18
    Corrosion Management Program & RBI Study (Project 6285) for Fabrication And Installation Of (Sfny, Zulf And Brri) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
  • ARABIAN DRILLING COMPANY – KJO
    Saudi Arabia
    Jun-17
    Supply of Software & Personnel for Material Tracking
  • SNGPL
    Pakistan
    Oct-15
    Pipeline Integrity Management Program
  • Saudi Aramco
    Saudi Arabia
    Sep-13
    RBI study for Pipelines for GPD Gas Wells and Manifolds for Saudi Aramco
  • LukOil Middle East Ltd.,
    UAE
    May-13
    Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
  • PETRONAS CARIGALI SDN BHD
    Malaysia
    Oct-10
    Provision of Pipeline Risk Based Inspection (RBI) Study for PETRONAS CARIGALI SDN BHD – PENINSULAR Malaysia Operations (PCSB-PMO) including VAIL Pipeline software
  • Binh SON Refining & Petrochemical CO. LTD (BSR)
    Vietnam
    Sep-12
    Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
  • LUKOIL MID-EAST LIMITED
    UAE
    Jan-16
    Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
  • Newfield Peninsula Malaysia
    Malaysia
    Jul-12
    Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc.
  • Oman Oil Company Exploration & Production LLC (OOCEP)
    Oman
    Oct-17
    Provision of Asset Integrity Management Services for Block-60
  • PETRONAS Floating LNG 1 (L) Ltd.
    Malaysia
    Apr-14
    Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
  • Qatar Aluminium Ltd. (QATALUM)
    Qatar
    Dec-13
    Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
  • Methanol Chemicals Company
    Saudi Arabia
    Oct-14
    Reliability Centered Maintenance (RCM) at Chemanol
  • Bunduq Company Ltd
    UAE
    Jan-12
    Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
  • BW Offshore
    Signapore
    Jun-12
    Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
  • ADGAS
    UAE
    Dec-10
    Inspection Management System
  • Al Khafji Joint Operation
    Saudi Arabia
    Mar-11
    Establisment of Risk Based Inspection Program
  • Zakum Development Company (ZADCO)
    UAE
    Jul-16
    Development of Performance Standards and Written Scheme of Examination for ZADCO HSECES.
  • Murphy
    Malaysia
    Apr-11
    Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
  • ENI, Pakistan
    Pakistan
    Oct-10
    Reliability Centered Maintenance (RCM) Study Supply ENI, Pakistan including VAIL-Plant Software
  • Al Khafji Joint Operation
    Saudi Arabia
    Oct-10
    Reliability & Maintenance Effectiveness Implementation including VAIL-Plant Software
  • GASCO
    UAE
    Oct-09
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO (ASAB 0 & ASAB 1) Including VAIL-Plant (PEMS) software
  • GASCO
    UAE
    Oct-09
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO (HABSHAN) Including VAIL-Plant (PEMS) software
  • GASCO
    UAE
    Oct-09
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO (RUWAIS) Including VAIL-Plant (PEMS) software
  • GASCO
    UAE
    Oct-09
    Development of piping and Dead-legs management system by using S-RBI approach for GASCO (BU HASA) Including VAIL-Plant (PEMS) software
  • DUSUP
    UAE
    Oct-09
    Asset Integrity Management Study for Plant Piping Including VAIL-Plant (PEMS) software
  • PENSPEN Thailand
    Thailand
    Oct-10
    Specification for HAZOP & SIL Determination Study including (VAIL SIL) software
  • Qatar Petroleum
    Qatar
    Jun-14
    Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED VAIL-Plant Software (SIMS) software
  • QCON
    Pakistan
    Oct-10
    Risk Analysis for Installing Vapour recovery arm including VAILHAZOP software
  • BP Pakistan
    Pakistan
    Oct-08
    Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system) including VAIL SIL software
Audit Services
  • CLIENT
    LOCATION
    YEAR
    TITLE
  • Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    Oct-15
    Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
  • Al-Khafji Joint Operations (KJO)
    Saudi Arabia
    Apr-08
    Reliability and Maintenance Effectiveness Review & Implementation
  • Abu Dhabi National Oil Company (ADNOC Onshore)
    UAE
    Mar-13
    Consultancy Services for Periodic Equipment Integrity Review (PEIR)
  • Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    UAE
    Apr-09
    Reliability & availability study for ADGAS Flow measuring equipment’s.
  • BOROUGE
    UAE
    May-20
    Borouge Inspection & Corrosion Management System Audit
  • Pakistan Petroleum Limited
    Pakistan
    Dec-18
    Process Safety Management (PSM) Evaluation & Benchmarking Study at PPL
  • Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    May-18
    Technical Audit of Sui Northern Gas Pipelines Limited
  • Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    Aug-07
    Technical Audit of Sui Northern Gas Pipelines Limited
  • BOROUGE
    UAE
    Jul-13
    External Audit on Process Safety Management System in Olefins (EU2), Poly-Olefins Olefins (PE3) for Year 2013
  • MOL PAKISTAN OIL AND GAS CO.
    Pakistan
    Apr-15
    Fire and Gas Equipment audit for MOL Production Facilities
  • Inter State Gas System (ISGS) Private Limited
    Pakistan
    Dec-12
    Price Audit Services Contract
  • Dragon Oil
    UAE
    Oct-14
    EPIC Contract Performance Assessment audit for Dragon Oil Turkmenistan.
  • Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    UAE
    May-08
    Review and Assessment of ADGAS SOP in accordance with AIRMS as part of Development of Static Equipment Inspection Task Plan & Master Plan
  • BP-Pakistan
    Pakistan
    Jan-08
    Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
  • DHAFIR Technologies
    UAE
    Apr-15
    Third Party Review and Certification of Drawings and Documents for Firefighting at Ruwais Refinery
  • Musanada
    UAE
    Sep-14
    Quality and HSE Audit Consultancy pertaining to Schools by Musanada
  • ENERCON
    UAE
    Aug-16
    Detailed Energy Audit
  • State Life
    Pakistan
    Jul-16
    Hiring Consultancy Services for Survey, Design and Supervision for Upgrading of Fire Fighting Systems for State Life Buildings All Over Pakistan
  • Musanada
    UAE
    Jul-20
    Inspection of Musanada Buildings
  • Thales Advanced Solutions Ltd
    UAE
    Apr-16
    Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
  • SONATRACH
    Algeria
    Jul-20
    Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
  • TAKREER
    UAE
    Aug-11
    Independent Audit Verification for HSECES at ADRD and RRD
  • TAKREER
    UAE
    Dec-09
    PSM & HSE Audit for TAKREER Refineries. / including ADNOC Energy Complex Building.
  • Pak-Arab Refinery Limited (PARCO)
    Pakistan
    Feb-15
    Third party QSHE & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
  • QATAR Petroleum
    Qatar
    Jan-13
    Integrity & HSE Study for 70 Petrol Station of QATAR Petroleum
  • National Drilling Company (NDC)
    UAE
    Oct-14
    HSE Audit Survey at Onshore & Offshore Rigs
  • National Drilling Company (NDC)
    UAE
    Oct-15
    HSE Audit Surveys at Onshore & Offshore Rigs
  • NDC National Drilling Company
    UAE
    Oct-17
    HSE Audit at Onshore and Offshore Rigs
  • ZADCO Zakum Development Company
    UAE
    Oct-12
    Provide HSECES Services on Upper Zakum (South Satellite Platform, North Satellite Platform, West Satellite Platform)
  • TAKREER (ADNOC Refining)
    UAE
    Oct-11
    Independent Audit Verification for HSECES at ADRD & RRD