Our Experience

  • Construction Environmental Management Plan for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
    MACE Contractor
    United Kingdom
    2020
  • Environmental Monitoring & Testing Of Hotel Premises
    THE RITZ CARLTON HOTEL ABU DHABI
    Abu Dhabi, UAE
    2020
  • Project No: 570-604129 Provision of Third Party Design Review Services For Pre-Engineered Building Workshop At Fujairah For Structural Integrity Verification
    VTTI Fujairah Terminals Ltd Fzc
    United Arab Emirates UAE
    2020
  • “Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for ASAB & SAHIL Contract No. 16079.01 “
    ADCO
    United Arab Emirates UAE
    2020
  • Environmental Impact Assessment for a new Recycling Building in JAFZA
    GREEN SOLUTIONS
    Pakistan
    2020
  • Environment Impact Assessment Studies & Preparation of Community Engagement Plan & for Wells Drilling and Testing Operations in Onshore Block 1, UAE
    URJA BHARAT PTE LTD/ADNOC Onshore
    United Arab Emirates UAE
    2020
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    2020
  • Environmental Monitoring & Testing of GRC1
    Fibrex Construction LLC (GRC-1)
    Abu Dhabi, UAE
    2020
  • Updating the Existing SGD Operations HSEIA
    ADNOC Sour Gas
    United Arab Emirates UAE
    2020
  • SIL level assessment is the second project, in which Akzo have already assigned SIL levels to limit switches and need to be verified as subject expert, as it’s the requirement of Akzo to verify from expert for it to be termed as approved.
    AKZO NOBEL PAKISTAN LIMITED
    Pakistan
    2020
  • Environmental Impact Assessment (EIA) for their Existing Facility in Jebel Ali
    EMIRATES LIVESTOCK & MEAT PRODUCTS TRADING COMPANY LLC
    Dubai, UAE
    2020
  • Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for SHAH / QUSAHWIRA / MENDER Contract No. 16079.02
    ADCO
    United Arab Emirates UAE
    2020
  • RBI Assessment Integrity Services for VAIL-Plant® PIMS, SIMS and PEMS for LAM -13, LAM-63 and Block 4 at Caspian Sea
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2020
  • Mangrove Health Survey
    NATIONAL MARINE DREDGING COMPANY
    Abu Dhabi, UAE
    2020
  • Environmental Monitoring & Testing
    APT GLOBAL MARINE SERVICES LLC
    Abu Dhabi, UAE
    2020
  • HSEIA STUDY REPORT FOR WELL DRILLING OPERATIONS IN ONSHORE BLOCK-1, ABU DHABI, U.A.E.
    Urja Bharat
    United Arab Emirates UAE
    2020
  • Environmental Monitoring & Testing of Mussafah Premises
    SPECIALIZED MEDICAL CARE HOSPITAL
    Abu Dhabi, UAE
    2020
  • Consultancy Services for Operation Health, Safety & Environmental Impact Assessment (HSEIA) Study
    ADNOC Distribution
    United Arab Emirates UAE
    2020
  • Environmental Monitoring & Testing for Ruwais Project Laydown Office & Mussafah Premises
    CONTRACTING & TRADING Co. (CATCO)
    Abu Dhabi, UAE
    2020
  • “Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for TPO Contract No. 16079.03 “
    ADCO
    United Arab Emirates UAE
    2020
  • SOW for VAIL-Plant® EIRMS Implementation Services for LAM-28. LAM-A, and LAM-B offshore Platforms using EIRMS module
    Dragon Oil Turkmenistan Limited (DOTL)
    UAE & Turkmenistan
    2020