Our Experience

  • Construction Environmental Management Plan (CEMP)
    TASNEEM GENRAL CONTRACTING CO. & REAL ESTATE MANAGEMENT L.L.C
    Abu Dhabi, UAE
    2020
  • Construction Environmental Management Plan for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
    MACE Contractor
    United Kingdom
    2020
  • “Update Operating Manuals & Procedures (OP & MS) for ADCO Fields, Terminals & Pipelines-Full Implementation Across ADCO Assets (Phase II) for ASAB & SAHIL Contract No. 16079.01 “
    ADCO
    United Arab Emirates UAE
    2020
  • Environmental Monitoring & Testing Of Hotel Premises
    THE RITZ CARLTON HOTEL ABU DHABI
    Abu Dhabi, UAE
    2020
  • Project No: 570-604129 Provision of Third Party Design Review Services For Pre-Engineered Building Workshop At Fujairah For Structural Integrity Verification
    VTTI Fujairah Terminals Ltd Fzc
    United Arab Emirates UAE
    2020
  • RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    2020
  • Environmental Impact Assessment for a new Recycling Building in JAFZA
    GREEN SOLUTIONS
    Pakistan
    2020
  • Environment Impact Assessment Studies & Preparation of Community Engagement Plan & for Wells Drilling and Testing Operations in Onshore Block 1, UAE
    URJA BHARAT PTE LTD/ADNOC Onshore
    United Arab Emirates UAE
    2020
  • Updating the Existing SGD Operations HSEIA
    ADNOC Sour Gas
    United Arab Emirates UAE
    2020
  • SIL level assessment is the second project, in which Akzo have already assigned SIL levels to limit switches and need to be verified as subject expert, as it’s the requirement of Akzo to verify from expert for it to be termed as approved.
    AKZO NOBEL PAKISTAN LIMITED
    Pakistan
    2020
  • Environmental Monitoring & Testing of GRC1
    Fibrex Construction LLC (GRC-1)
    Abu Dhabi, UAE
    2020
  • Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
    TAKREER (ADNOC Refining)
    United Arab Emirates UAE
    2019
  • PROVISION OF THIRD PARTY REVIEW & VERIFICATION FOR CONCEPTUAL DESIGN STAGE OF NG AND SNG PIPEWORK INSTALLATION AT RESIDENTIAL BUILDING, SECTOR RBW-8, PLOT C-26, AL RAHA BEACH, ABU DHABI
    Hannover
    Abu Dhabi, UAE
    2019
  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019
  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Environmental Baseline Survey of Dubai Site To perform the following study; Ambient Air Quality including Dust
    RTA/ Western Bainoona Group.
    Abu Dhabi, UAE
    2019
  • Project No: 003056-Rev-01 Third Party Certification for the Surge Vessel Capacity Calculation
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2019
  • Environmental Monitoring & Testing Following study are part of the scope; Indoor Air Quality
    Al Khaznah Tannery
    Abu Dhabi, UAE
    2019
  • VAIL-Plant® Annual Support/Maintenance and Modifications
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2019
  • Project No: LPO159308 Provision for “Third party consultancy investigative study for the damage to existing boundary walls”
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019