AI & Software Solution Services

Asset Performance Management System
Asset Performance Management System (APMS) is a secure and efficient way to increase safety and plant performance.
Read More
Computerized Maintenance Management
Velosi's Computerized Maintenance Management System module can address.
Read More

VAIL-PSRA Software
Petrol stations are generally considered as hazardous workplaces because they store.
Read MoreVAIL-MTS Software
Nowadays many companies face challenges with tracking and monitoring materials.
Read More
VAIL-PHA Software
PHA is defined as the analysis of potential causes and consequences of fires.
Read More
Pressurized Equipment Management System
Pressurized Equipment Management System (PEMS) is one of the key focuses of Asset Integrity Management that complies...
Read More
PIMS Offshore
PIMS is defined as the compilation of preparatory measures that jointly ensure the integrity of the pipeline.
Read More
VAIL-ERP Software
An ERP system is a compact software that helps you control different or all parts of your business.
Read More
VAIL-CTR Software
Cost, time and resource are three key aspects of projects that contractors need to account for.
Read More
EIRMS
Velosi's world-class Electrical, Instrumentation and Rotary Management System provides our clients with a host of benefits.
Read More

VAIL-HRMS Software
Human resource plays a significant role in developing, increasing and evolving the culture.
Read More
VAIL-Flow Software
Workflow management software is an application designed to set up and monitor.
Read More

VAIL-Feedback Software
The term 'feedback' is defined as some sort of helpful information or constructive criticism.
Read More
Structural Integrity Management System
SIMS is the method of securing compliance with regulatory as well as organizational requirements over a period of time,...
Read More
VAIL-POS Software
VAIL- POS was launched to give every aspiring business owner an easier way.
Read More
VAIL Plant Module - LEMS
VAIL-Plant LEMS module has been developed to inspect the status of Lifting Equipment.
Read More
VAIL-Plant Module - CIMS
Based on standard SEI/ASCE 11-99, VAIL-Plant CIMS module is dedicated for assessment.
Read More
VAIL-Plant Module - CPMS
Based on NACE, VAIL-Plant CPMS module maintains the Engineering Data
Read More
VAIL-Plant Module - HIMS
VAIL-Plant HIMS module provides a rationalized approach to perform inspections.
Read More
VAIL-Plant Module -FPIMS
VAIL-Plant FPIMS module allows to specifically to manage and process information.
Read More
VAIL-Plant Module -ISMS
ISMS is an integrated solution that facilitates the inspection planning.
Read More
Asset Integrity Management System
The integrity of assets plays a vital role in conservative industries like energy, and oil and gas where the effective...
Read More
Wellhead Integrity Management System
At Velosi, it's our motto to ensure that wells operate as designed for their assigned life with all risks kept as low as reasonably practicable...
Read More
Flexible Riser Integrity Management System
Flexible Riser Integrity Management System (FRIMS) is a secure and efficient way to increase safety and plant performance.
Read More
Financial Management
Financial Management plays a significant role in developing, increasing and evolving the culture.
Read More
Sales and Invoicing
Sales and Invoicing plays a significant role in developing, increasing and evolving the culture.
Read More
Procurement
Procurement plays a significant role in developing, increasing and evolving the culture.
Read More
Project Management
Project Management plays a significant role in developing, increasing and evolving the culture.
Read More
Helpdesk
Helpdesk plays a significant role in developing, increasing and evolving the culture.
Read More
Safety Integrity Level (SIL)
Safety Integrity Level analysis is an estimation of performance recommended for a Safety Instrumented Function (SIF).
Read More
Hazard and Operability Study
Identifying such deviations is usually facilitated by utilizing sets of 'guide words' as a methodical list of deviation perspectives.
Read More
Root Cause Analysis (RCA)
Root Cause Analysis (RCA) plays a significant role in developing, increasing and evolving the culture.
Read More
What-if Analysis
What-if Analysis plays a significant role in developing, increasing and evolving the culture.
Read More
Failure Effects Mode Analysis (FMEA)
At Velosi, FMEA are used to review as many components, assemblies and subsystems as possible to recognize possible failure modes in a system...
Read More
PIMS Onshore
PIMS is defined as the compilation of preparatory measures that jointly ensure the integrity of the pipeline.
Read More
ERP Governance

Document Management

Research and Planning Management

Inventory Management

Asset Tagging and Tracking

Taxation and Duties Management (TDM)

Procurement
Procurement plays a significant role in developing, increasing and evolving the culture.
Read More

Warehouse Management Software | VAIL-WMS
VAIL-ERP® Warehouse Management Software transforms your operations into a synchronized, frictionless ecosystem.
Read More
VAIL-AIPS Software
VAIL-AIPS (Asset Integrity Process Safety Management System) is an innovative, yet unique, comprehensive process safety management system designed to improve safety.
Read More
Risk Based Inspection (RBI) Software
At Velosi, we apply the industry best practices - BS EN IEC 60812, SAE JA1011, SAE JA 1012, ISO-14224, and OREDA - to optimize and manage...
Read More


