Our Experience

  • Reliability Centered Maintenance (RCM) / RAM Study “Supply”
    ENI PAKISTAN LIMITED
    Pakistan
    July 2010
  • RBI, RCM & RAM study for 32 nos. Storage Tanks
    Vopak Tanks Terminal Singapore
    Singapore
    2004
  • Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
    Petronas Carigali
    Malaysia
    2014
  • Risk Based Inspection Study as part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
    Al ASAB/ADNOC Onshore
    Abu Dhabi, UAE
    February 2021
  • Risk Based Inspection Study as a part of AIMS for EPC for Rumaitha Thamama Zone B Phase – III Expansion & Phase-I VRC Replacement Project
    Al ASAB/ADNOC Onshore
    Abu Dhabi, UAE
    February 2022
  • Risk Based Inspection Study as part of AIMS Services for EPC for BAB 485 MBS Sustainable Facilities Project
    ARCHIRODON GROUP NV/ ADNOC Onshore
    Abu Dhabi, UAE
    December 2021
  • Well Integrity assessment as part of RBI Implementation Project with Provision of Software and Associated Services
    Groupement Berkine SH/AAC
    Algeria
    December 2019
  • Structural Integrity Assessment and Life Extension Study for WHP-C Wellhead Platform
    Bunduq
    Abu Dhabi, UAE
    June 2012
  • WHP-B Structural Integrity Assessment
    Bunduq
    Abu Dhabi, UAE
    September 2012
  • SIA & Life Extension for WHP-E Platform
    Bunduq
    Abu Dhabi, UAE
    January 2012
  • SIA & Life Extension for WHP-F Platform
    Bunduq
    Abu Dhabi, UAE
    July 2013
  • Structural Integrity Assessment and Life Extension Study for EB-04 Wellhead Platform
    Bunduq
    Abu Dhabi, UAE
    September 2013
  • Structural Integrity Assessment & Life Extension EB-37
    Bunduq
    Abu Dhabi, UAE
    December 2013
  • Preparation of Inspection Packs for Wellhead Structure for Salamander Energy
    Salamander Energy
    Thiland
    December 2014
  • Pilot RBI Study for Wellhead Pressure equipment for Salamander Energy
    Salamander Energy
    Thiland
    March 2012
  • Pilot RBI Study for Wellhead Pressure equipment for Salamander Energy
    Salamander Energy
    Thiland
    March 2012
  • Pilot Risk Based Inspection (RBI) Study for Wellhead Structures for Salamander Energy
    Salamander Energy
    Thiland
    March 2012
  • Development of A Study on The Compliance of Installations and Equipment of The OHANET Regional Department
    SONATRACH
    Algeria
    December 2021
  • Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
    SONATRACH
    Algeria
    July 2021
  • Borouge Inspection & Corrosion Management System Audit
    BOROUGE
    United Arab Emirates UAE
    February 2021