  • “Order Number: 3620025175 MOB of RAM Engineer & RAM CONS. FR RAM (MCOT) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations”
    Petronas Carigali
    Malaysia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System Project: “PF CHANGE Restaurant in Yas Mall
    Al Fanar
    Saudi Arabia
    2014
  • Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
    Qatar Aluminium Ltd. (QATALUM)
    Qatar
    2014
  • Asset Register Verification & HSECES Implementation for GASCO Pipeline Network Division Phase-II
    GASCO Abu Dhabi Gas Industries Ltd
    United Arab Emirates UAE
    2014
  • PWA/GTC/004/11-12 – Consultancy Services For Survey Services For Pavement Condition And Right Of Way Asset Inventory Data Collection Including Provision Of Necessary Software Solutions, Training And Post Implementation Support Services EBSD /10-11/N/003/G
    ASHGHAL
    Qatar
    2014
  • KPOC CTR 001B Pipeline RBI Study-Gas
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Project No: LUS-O&M0921 Design Calculation for Cassette Arrangement (Top Frame).
    Degermont SA Qatar
    Qatar
    2014
  • Order Number: 3620072512 PO CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
    Petronas Carigali
    Malaysia
    2014
  • Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
    MISC Offshore Floating Terminals (L) Limited
    Malaysia
    2014
  • Third Party Approval of detailed design package and of NG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
    Binh SON Refining & Petrochemical CO. LTD (BSR
    Vietnam
    2014
  • Tank Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
    Oil and Gas Regularity Authority (OGRA)
    Pakistan
    2014
  • Validation of Structural Suitability of Ground Floor Slab in GUP Substation to Accommodate Additional Equipment Racks
    Abu Dhabi Oil Refining Company (TAKREER)
    Abu Dhabi, UAE
    2014
  • Integrity Study of Bushra Line 33km for DALEEL
    Daleel Petroleum L.L.C.
    Oman
    2014
  • KPOC CTR 002A Structure RBI Study-Sub Structure
    Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)
    Malaysia
    2014
  • Asset Register Verification & HSECES (Health, Safety & Environmental Critical Equipment Systems) Performance Standard Implementation for GASCO Pipeline Network Division – Phase II
    Abu Dhabi Gas Industries (GASCO)
    Abu Dhabi, UAE
    2014
  • As-Builting of Margham Plant Piping and Instrument Location GAs
    DUSUP
    Dubai, UAE
    2014
  • Project No: POQ-22141 Design Review of Gas Network in Saadyiaat Island Culture District
    QEnergy
    Australia
    2014
  • Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
    Petronas Carigali
    Malaysia
    2014
  • Third Party Design Approval for detailed stage NG System
    QEnergy
    Australia
    2014
  • CNG Station 2014 (Including Integrity & HSE (Health Safety and Environment) Studies)
    Oil and Gas Regularity Authority (OGRA)
    Pakistan
    2014