Our Experience

  • Provision of Third Party Detailed Design Approval of NG/SNG System
    Al Fanar
    Saudi Arabia
    2015
  • Provision of Third Party Approval of All 3 Stages of NG/SNG Installation Pipe work in Residential Building
    Arkiteknik International
    United Arab Emirates UAE
    2015
  • Provision of Third Party Design Approval for Conceptual Design Stage of NG/SNG Installation in Residential Tower
    APG Arch Planning Group
    Abu Dhabi, UAE
    2015
  • “Provision of Third Party Design Approval for Conceptual design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building, Al Raha beach – Abu Dhabi, Sector No. RBW3, Plot No. C2 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Approval of Conceptual Design Package and of NG/SNG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2015
  • Provision of Third Party Design Approval for Conceptual Design stage Documents of NG/SNG Installation in Residential Buildings” for Residential Building Shams – Abu Dhabi, Sector No. RS-5, Plot No. C-02 Project
    Architecture & Planning Group (AGP)
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Design Approval for Conceptual design stageDocuments of NG/SNG Installation in Buildings.
    GHD Global Ply Ltd.
    Abu Dhabi, UAE
    2015
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Approval (Detailed design stage) of SNG/NG service pipeline & Installation Pipe work
    Qenergy
    Australia
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System Project: “PF CHANGE Restaurant in Yas Mall
    Al Fanar
    Saudi Arabia
    2014
  • Third Party Approval of detailed design package and of NG Installation Pipe work.
    Al Fanar
    Saudi Arabia
    2014
  • Third Party Design Approval for detailed stage NG System
    QEnergy
    Australia
    2014
  • Third Party Design Approval for detailed stage NG System
    Al Fanar
    Saudi Arabia
    2014
  • Provision of Third Party Design Approval for detailed stage NG System
    Qenergy
    Australia
    2014
  • Provision of Third Party Approval of detailed design package of NG/SNG Installation Pipe work.
    Arabian Unigaz
    Abu Dhabi, UAE
    2014
  • Provision of Third Party Design Approval for detailed stage NG/SNG System
    Al Fanar
    Saudi Arabia
    2014
  • Saadiyat Beach Apartment (SB-19), Saadiyat Island, Abu Dhabi
    GHD
    Abu Dhabi, UAE
    2013
  • Musaffah Gardens Mixed Use, Abu Dhabi
    Al Sabbah
    Abu Dhabi, UAE
    2013
  • Yas Mall, Sector YS-Plot2, Yas Island
    Al Fanar
    Saudi Arabia
    2013