Our Experience

  • Order No. 3620287143 PL245 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: TAS/APV/ CL2/04-16/T&C/0001 Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
    Thales Advanced Solutions Ltd
    United Arab Emirates UAE
    2016
  • Pipe Stress Analysis of Hdpe Type Sdr17, Chilled Water Network at Coast Guard Building – Daayen
    Genric Engineering Technologies
    Qatar
    2016
  • Project No: ABE-12630 Review & Appraisal of J628-MS – Lifting Plan for Girder Erection.
    Albanna Engineering LLC.
    Dubai, UAE
    2016
  • Quality and HSE Audit Consultancy pertaining to Schools by Musanada
    MUSNADA
    Abu Dhabi, UAE
    2016
  • Order No. 3620287345 PL269 Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: 9000183326 Inspection of Musanada Buildings
    Musanada
    United Arab Emirates UAE
    2016
  • Stress analysis of Oil Pipeline from PARCO depot to Asker Oil Depot Machikey, Sheikhupura
    Asker Oil
    Pakistan
    2016
  • Pipeline Integrity Management System Implimentation
    Sui Northern Gas Pipelines Ltd. (SNGPL)
    Pakistan
    2016
  • Project No: QP00-6363 Design Review and Approval of Lifting Hooks
    ETA MELCO Elevator
    Dubai, UAE
    2016
  • Order No. 3620287348 PL268 Life extension assessment Study (LEA) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: S15-311 Design review of Rig Tooling Basket Skid
    United Engineering Services L.L.C
    United Arab Emirates UAE
    2016
  • Piping stress analysis of off-shore pipeline riser.
    REPSOL, Malaysia
    Abu Dhabi
    2016
  • Noise and Emission Testing of Aviation Equipment Based at Islamabad as per NEQ’s requirements.
    Pakistan State Oil Company Limited (PSO)
    Pakistan
    2016
  • Project No: 09448 Review of Drawings – Qatar Rail Project
    GULF STEEL & ENGINEERING
    Qatar
    2016
  • LTC/ ENG/2030/12 -CALL-OFF Contract For The Supply Of Sub-Sea Representative To Oversee The Underwater Inspection Surveys Of All Platforms And Do Condition Monitoring Survey For Offshore Pipelines, Cables And Associated Sub Connection Facilities
    QATARGAS OPERATING COMPANY LIMITED
    Qatar
    2016
  • Order No. 3620287347 PL267 Life extension assessment Study (LEA) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: QP-204/53292/2015 Calculation the Strength of Existing Control Room 1 False Floor
    Oil and Gas Development Company Limited
    Abu Dhabi, UAE
    2016
  • Perform piping stress analysis of chiller piping in order to evaluate piping loads used in design calculations of pipe supports by Vendor and review & certification of pipe supports design calculations for chiller piping provided by the Vendor
    Genric Engineering Technologies
    QATAR
    2016
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    LukOil Middle East Ltd.
    Iraq
    2016
  • Noise and Emission Testing of Aviation Equipment Based at Peshawar Airport as per NEQ’s requirements.
    Pakistan State Oil Company Limited (PSO)
    Pakistan
    2016