Our Experience

  • LTC/ ENG/2030/12 -CALL-OFF Contract For The Supply Of Sub-Sea Representative To Oversee The Underwater Inspection Surveys Of All Platforms And Do Condition Monitoring Survey For Offshore Pipelines, Cables And Associated Sub Connection Facilities
    QATARGAS OPERATING COMPANY LIMITED
    Qatar
    2016
  • Order No. 3620287347 PL267 Life extension assessment Study (LEA) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: QP-204/53292/2015 Calculation the Strength of Existing Control Room 1 False Floor
    Oil and Gas Development Company Limited
    Abu Dhabi, UAE
    2016
  • Perform piping stress analysis of chiller piping in order to evaluate piping loads used in design calculations of pipe supports by Vendor and review & certification of pipe supports design calculations for chiller piping provided by the Vendor
    Genric Engineering Technologies
    QATAR
    2016
  • Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
    LukOil Middle East Ltd.
    Iraq
    2016
  • Noise and Emission Testing of Aviation Equipment Based at Peshawar Airport as per NEQ’s requirements.
    Pakistan State Oil Company Limited (PSO)
    Pakistan
    2016
  • Project No: GBH-DXB-16206 Third Party Review of Tower Crane Foundation
    GBH International Contracting LLC
    Dubai, UAE
    2016
  • Consltancy Services For Condition Assessment Of Reinforces Cement Concrete Clarifier And Water Basin Tanks, Dr, Qatar Steel.
    QATAR STEEL
    Qatar
    2016
  • Order No. 3620287350 PL270 Fitness for Services (FFS ) PIPELINE ENGINEERING CONSULTANCY as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: 50443 Third Party Review And Approval Of Spreader Beam
    PETROSERV Limited
    Qatar
    2016
  • To perform piping stress analysis of chiller piping in order to evaluate piping loads used in design calculations of pipe supports by Vendor and review & certification of pipe supports design calculations for chiller piping provided by the Vendor
    Omega Engineering WLL
    Qatar
    2016
  • Updating of ADCO Corporate Inspection Management System Procedure Document
    Australian Building Construction Company - ADCO
    United Arab Emirates UAE
    2016
  • Consultancy Services in Carrying-Out Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment & Structures
    Qatar Fertilizer Company (QAFCO)
    Qatar
    2016
  • Consultancy Services For Health, Safety & Environment (HSE) Monitoring For Exploration, Drilling, Plant Installation And Pipeline Laying Project Activities In All PPL Fields/Locations Including Exploration Blocks/Mining Leases On Call-Out Basis For Three Years Cycle.
    Pakistan Petroleum Limited (PPL)
    Pakistan
    2016
  • Project No: GCC/GM3822/SC/PO-0133 Endorsement of Temporary Supports
    Granite Construction Company
    United States
    2016
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Amonia 1 & 2 Equipment and Structure
    Qatar Fertilizer Company (QAFCO)
    Qatar
    2016
  • Order No. 3620287346 PL271 Life extension assessment Study (LEA) + Fitness for Services (FFS ) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
    PETRONAS CARIGALI SDN BHD
    Malaysia
    2016
  • Project No: DS/LPO/378 Third Party Review And Approval of Fan Fixing Stability Check Calculation
    Dutch & Spanish General Contracting LLC
    Abu Dhabi, UAE
    2016
  • Piping stress analysis of 20″ carbon steel piping for Dhafir Technologies Abu Dahbi
    Dhafir Technologies
    Abu Dhabi
    2016
  • As-Built P&IDs and RBI Assessment of Piping System
    Glaxo Smith Kline (GSK)
    Pakistan
    2016
  • Construction/Extension of sustainability master plan for DHQ Hospital & Shaheed Saif-ur-Rehman Hospital Gilgit
    Government of Gilgit Baltistan Maintenance Division PWD Gilgit
    Pakistan
    2016