Our Experience

  • Risk Based Inspection (RBI) based Small Bore Piping Integrity Program for Egyptian LNG
    Egyptian LNG
    Egypt
    2012
  • Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc. (Upstream Oil & Gas)
    Newfield
    Malaysia
    2012
  • Pilot Risk Based Inspection (RBI) Study for Offshore Pipeline from Wellhead to Process Platform for Salamander Energy (Bualuang) Limited.
    Salamander Energy
    Thiland
    2012
  • Pilot Risk Based Inspection (RBI) Study for Wellhead Structure for Salamander Energy (Bualuang) Limited.
    Salamander Energy
    Thiland
    2012
  • Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Risk-Based Inspection (RBI) Assessment of DHT Complex – Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Develop Risk Based Inspection (RBI) based inspection plans for in – plant piping within DUKHAN for Qatar Petroleum
    Qatar Petroleum
    Qatar
    2012
  • Establishment of Risk Based Inspection (RBI) Programs in Al-Khafji Joint Operations-KJO (for all Stationary Equipment & Piping System)
    KJO
    Saudi Arabia
    2012
  • Risk Based Inspection (RBI) Static Equipment’s & Piping @ QSWP for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2012
  • Development of Design Specification for Dragon Oil Dubai
    Dragon Oil
    Turkmenistan
    2011
  • Training of Risk Based Inspection (RBI) Courses for Saudi Aramco
    Saudi Aramco
    Saudi Arabia
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Ruwais. (LPG Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO BAB. (Gas Processing Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO BuHasa. (Gas Processing Plant)
    GASCO
    United Arab Emirates UAE
    2011
  • Development of piping and Dead-legs management system by using S-RBI approach for GASCO Pipeline.
    GASCO
    United Arab Emirates UAE
    2011
  • RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software for Al-Khafji Joint Operations (KJO)
    Al-Khafji Joint Operations (KJO)
    Saudi Arabia
    2011
  • Reliability and Maintenance effectiveness Implementation
    Al-Khafji Joint Operations (KJO)
    Saudi Arabia
    2010
  • Development of Static Equipment Inspection Task Plans & Master Plan
    Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)
    United Arab Emirates UAE
    2010
  • Provision of Risk Based Inspection (RBI) based Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & ‘B’. for Dubai Supply Authority (DUSUP).
    Dubai Supply Authority (DUSUP)
    United Arab Emirates UAE
    2010