Development of Complete Asset Integrity & HSE Program at EPC Project Stage

Velosi developed a complete Asset Integrity and HSE Program at Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC) EPC project stage located in Malaysia.
Objective
- Develop a complete Asset Integrity and HSE Program for KPOC facilities at EPC project stage, to aid them for smooth operation.
 - Make sure the facilities’ integrity and reliability, preventing any undesirable HSE impact resulting from the loss of containment and functional failure.
 - Ensure that KPOC met legislative, PPGUA Section 11 guidelines for inspection and maintenance, company’s operation philosophy, HSE management system requirements.
 
Scope of Work
- Pipeline RBI Study – Crude, Gas, Jacket and Subsea Structure
 - Preparation of Asset Register and FMECA based RCM Analysis including PMR Development
 - Preparation of Bill of Material (BOM) and Job Plans
 - Review and Updating of the Risk Based Inspection (RBI) Report and Data Uploading into Meridium Software for Static Equipment, Piping Systems and Pressure Relief Devices
 - Deadlegs, Cui, Chemical Injection, Small Bore and Erosion Monitoring Point and Piping Support Identification Risk Ranking, and Management System.
 - Preparation of Inspection Drawing for Topside, Subsea Structure, Topside Equipment and Piping System
 - Safety Integrity Level (SIL) Study, Review and Assessment, and Interval Calculation for Functional Testing
 - Review and Validation of Safety Critical Element (SCE) and Business Critical Element (BCE)
 - Preparation of AIMS System Framework and Associated Documentation
 - Preparation of Pipeline Operating Manuals for two 132 Km Pipelines each (One Gas and One Oil)
 - Preparation of Inspection and Maintenance Standard Operating Procedures (SOPs)
 - Spare Parts Optimization
 
Deliverables
- Risk Based Inspection Methodology for Offshore Pipelines
 - Pipeline Corrosion And Inspection Strategy Document
 - Substructure and Topside Structure Tag Marking Methodology
 - Asset Register
 - FMECA Analysis
 - Preventive Maintenance Routines
 - RCM Analysis
 - Corrosion Loop Marked up Drawings
 - Static Equipment and Piping System Corrosion and Inspection Manual
 - Inspection Drawings
 - HAZOP Review Report
 - SIL Classification and Verification Report
 - GAP Analysis
 - Facilities Performance Standard and Verification Scheme Detection, Prevention, Control and Emergency Reponses
 - Update Procedure for Compliance Window for PM and CM in SAP
 - Population of Data in KPOC CMMS System
 - 14” KBB Oil Export Pipeline Operating Manual
 - 24″ KBB GAS Condensate Export Pipeline Operating Manual
 - Spare Parts Categorization, Criticality Assessment, Management and Optimization Procedure
 
						


