Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
Velosi performed a Risk Based Inspection and Integrity Studies for 213 pipelines belonging to the inventory of Petronas Carigali Sdn. Bhd located in Malaysia resulting in substantial cost savings.
Objective
- Velosi perform unparalleled Risk-Based Inspection Assessment and Integrity Studies to assure total quality of existing pipeline.
Scope of Work
- Perform screening and initial risk assessment
- Perform the detailed Risk-Based Inspection Assessment on the pipelines identified in screening and initial assessment
- Determining the integrity of the assets
- Updating the Corrosion Management Plan based on the results of the RBI Assessment
- Providing detailed RBI reports for the pipelines on which RBI was performed detailing the various damage mechanisms acting on the pipeline and provide the remaining life for them.
Deliverables
- Screening and initial assessment
- Detailed Assessment Report inclusive of
- Section Division Drawing
- Detailed Assessment Calculation
- Integrity Management Plan
- Integrity Management Plan