Development, Implement and Support of RBI Program for Full Production Facilities of West Qurana-2 Field
Velosi developed, implemented and supported RBI Program for LUKOIL Mid-East Limited’s full production facilities and pipelines during the phase 1 and phase 2 development of West Qurana-2 Field located in Iraq.
Objective
- Implementation and maintenance RBI system properly, and improved plant reliability and safety while reducing unplanned outages and repair cost.
- Implementation of RBI helps choose cost effective and appropriate maintenance and inspection tasks, ensure a shift from a reactive to proactive maintenance regime, produce an auditable system and implement a risk management tool (VAIL-Plant).
Scope of Work
- Develop asset integrity management systems
- Perform specific corrosion study for each equipment, piping and pipelines
- Implementing the RBI program for inspection data management and RBI analysis
- Develop written scheme of examination
- Develop RBI software with inspection data management capabilities
- Integrate RBI software with ERP system (SAP)
Deliverables
- Asset Integrity Management System:
- Comprehensive RBI Program which includes:
- Remnant Life Assessment
- Inspection Plan
- Failure Rate and Risk Allocation
- Written Scheme of Examination
- Comprehensive RBI Program which includes:
- VAIL Plant Software Modules:
- PEMS – Pressurized Equipment Management System
- PIMSON – Pipeline Integrity Management System – Onshore
- ISMS – Inspection Schedule Management System