Our Experience

  • Project No: 590-600612 Provision for Third Party Design Rerate for Vessel (V-601) as per ASME Section VIII DIV. 1 ED. 2017.
    VTTI Fujairah Terminals Ltd FZC
    United Arab Emirates UAE
    2019
  • Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
    Abu Dhabi Port Company/ Energy Management Services
    Abu Dhabi, UAE
    2019
  • Project No: 3119005278 Provision for Preparation of Design Calculation & Endorsement Scaffolding Structure as per BS EN 12811-1
    Trading and Agency Services Limited Company W.L.L
    Qatar
    2019
  • Environmental Baseline Survey of Dubai Site To perform the following study; Ambient Air Quality including Dust
    RTA/ Western Bainoona Group.
    Abu Dhabi, UAE
    2019
  • Project No: 003056-Rev-01 Third Party Certification for the Surge Vessel Capacity Calculation
    Prominent Team Consultancy LLC
    Abu Dhabi, UAE
    2019
  • Environmental Monitoring & Testing Following study are part of the scope; Indoor Air Quality
    Al Khaznah Tannery
    Abu Dhabi, UAE
    2019
  • VAIL-Plant® Annual Support/Maintenance and Modifications
    Binh Son Refining and Petrochemical Company Limited (BSR)
    Vietnam
    2019
  • Project No: LPO159308 Provision for “Third party consultancy investigative study for the damage to existing boundary walls”
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
    SONATRACH
    Algeria
    2019
  • Environmental Monitoring & Testing of JAFZA Facility Following study are part of the scope; Indoor Air Quality without Dust
    Express Pack Print
    Abu Dhabi, UAE
    2019
  • Provision of Services on implementing Hazard and Operability Analysys (HAZOP Analysis) at UCS1, and UKMS Stations of Bukhara MGMC
    Asia Trans Gas
    Uzbekistan
    2019
  • Project No: LPO-160518 Design Verification of the Trench Sheeting Shoring System
    Al Nasr Contracting Company L.L.C.
    Abu Dhabi, UAE
    2019
  • Environmental Monitoring & Testing of Musaffah Facility To perform the following study; Ambient Air Quality
    National Cement Factory
    Abu Dhabi, UAE
    2019
  • The Study of Classification of Security Levels Integrities (SIL) All Instrumented Functions Safety Complex GL1Z, GL2Z, GL1K, GP2Z and GP1Z
    SONATRACH
    Algeria
    2019
  • HAZOP Workshops and SIL Assessment and Verification
    Dragon Oil Turkmenistan Limited (DOTL)
    Turkmenistan
    2019
  • Environmental Monitoring & Testing of Dubai Facility To perform the following study; Indoor Air Quality Personnel Monitoring
    EMERSON AUTOMATION SOLUTIONS. BLDG A
    India
    2019
  • HAZOP Study of Pump Station
    Ghantoot Transport & General Contracting LLC
    United Arab Emirates UAE
    2019
  • Project No: 8300007767/601 Provision of Design Verification To Verify Material Grade Changes of Evaporator Tubes In Which The Existing Material of SA-178 Gr. A is Replaced With Available Material of SA-178 Gr. C.
    Bilfinger Deutsche Babcock Emirates LLC
    Abu Dhabi, UAE
    2018
  • AF/C/AL5311/13 – Regular Inspection Of The Steel Structures Of Various Venues In Aspire Zone
    ASPIRE LOGISTICS
    Qatar
    2018
  • Decommissioning Environmental Management Plan (DEMP) Preparation of DEMP in accordance with EAD’s Technical Guidance Document for Decommissioning Environmental Management Plan (DEMP).
    National Marine Dredging Company (NMDC)
    Abu Dhabi, UAE
    2018
  • SIC_013 – Out Fall Condition Assessment
    ASHGHAL
    Qatar
    2018