Our Experience

  • Reliability Centered Maintenance Study as part of AIMS Services for EPC for BAB 485 MBS Sustainable Facilities Project
    Archirodon Construction (Overseas) Co. Ltd
    United Arab Emirates UAE
    October 2021
  • VAIL Plant EIRMS Implementation Services for LAM-C, LAM-22, LAM-13 & LAM-63 Offshore Platforms Using EIRMS Modleu
    Dragon Oil Turkmenistan Limited
    UAE & Turkmenistan, HAZAR Site
    October 2021
  • Provision of Consulting Services for Preventive Maintenance Optimization (PMO) Upgrade
    Daleel Petroleum L.L.C
    Oman
    October 2021
  • First Call Out No. 1 for Development of Asset Integrity Dashboard User Manual as part of Agreement for Asset Integrity Consultancy Studies and Technical Support Services on Call out Basis
    Abu Dhabi National Oil Company (ADNOC)
    United Arab Emirates UAE
    October 2020
  • Quantitative Risk Assessment (QRA Study) for PRMS in Kizad
    Cloud Energy Gas
    United Arab Emirates UAE
    October 2020
  • Third Party Validation for Establishment of Air Conditioning Testing Lab (Supply, Installation, Commissioning and Training)
    Pakistan Energy Efficiency Conversion Agency
    Pakistan
    October 2019
  • Integrity and Remaining Life Assessment (RLA) of Boiler (121-B-01) at Ruwais Refinery East
    Abu Dhabi National Oil Company (ADNOC) Refining
    Abu Dhabi, UAE
    October 2019
  • Consultancy Services for Inventory Auditing, Validation and Valuation
    Dragon Oil Turkmenistan Limited
    UAE & Turkmenistan Site
    October 2018
  • Consultancy Services for Survey and Analysis of Electrical System at Head Office Building
    Sui Northern Gas Pipelines Limited
    Pakistan
    October 2018
  • Government of Gilgit-Baltistan: Consultancy Services for Design of Master Plan for 600 Bed DHQ Hospital Civil, Electrical, Public Health & HVAC system.
    Govt .of Pakistan PWD Gilgit
    Pakistan
    October 2017
  • Government of Gilgit-Baltistan: Consultancy Services for 600 Bed Design of Master Plan for Shaheed Saif-ur-Rahman Hospital.
    Govt .of Pakistan PWD Gilgit
    Pakistan
    October 2017
  • Government of Gilgit-Baltistan: Consultancy Services for Design of Master Plan for 600 Bed DHQ Hospital Civil, Electrical, Public Health & HVAC system.
    Govt .of Pakistan PWD Gilgit
    Pakistan
    October 2017
  • Enterprises Asset Management (EAM) Services for additional assets of L-F facility
    Dragon Oil Turkmenistan Limited
    UAE & Turkmenistan Site
    October 2017
  • Design of Master Plan for 600 Bed DHQ Hospital.
    Govt .of Pakistan PWD Gilgit
    Pakistan
    October 2017
  • Pakistan Petroleum Limited Consultancy Services for Design & Supervision for Pressure Vessels’ Design study and Civil Mechanical and Electrical
    Pakistan Petroleum Limited(PPL)
    Pakistan
    October 2016
  • Detailed Engineering Design of Segregation and Composting Facility including Resident Supervision at Sahiwal ( including Admin block)
    Gove. of Punjab The Urban Development Unit
    Pakistan
    October 2016
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
    Qatar Fertilizer Company (QAFCO)
    QATAR
    October 2015
  • Failure Analysis of Reformer Gas Quench Tower (RG 331-E) for Emirates Steel
    Emirates Steel
    Abu Dhabi
    October 2015
  • Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
    Qatar Fertilizer Company (QAFCO)
    QATAR
    October 2015
  • Consultancy Services in Carrying-Out Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment & Structures
    Qatar Fertilizer Company (QAFCO)
    Qatar
    October 2015