Asset Integrity Management Services
-
CLIENTLOCATIONYEARTITLE
-
OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)OmanDec-20RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
-
Al Asab General Transport & Contracting L.L.C/ ADNOC OnshoreUAENov-20Reliability Centered Maintenance Study as part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
-
Dragon Oil Turkmenistan LimitedTurkmenistanOct-20VAIL Plant EIRMS Implementation Services for LAM-C, LAM-22, LAM-13 & LAM-63 Offshore Platforms Using EIRMS Modleu
-
Bashayer Pipeline Company (BAPCO)SudanDec-20Reliability Cantered Maintenance Study as part of Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
-
ADNOC LNGUAESep-20SAP Functional Location Restructuring
-
TAKREERUAEDec-15Reliability Centered Maintenance (RCM) Study for Unit 13 in Hydroskimmer Plant at Ruwais Refinery
-
Dragon Oil Turkmenistan LimitedTurkmenistanDec-19Implementation of EIRMS Services for LAM-28, LAM-A and LAM-B Offshore Platforms Using Velosi VAIL Plant EIRMS Module
-
Saudi Aramco/Technicas ReunidasSaudi ArabiaJan-20APMP (Asset Performance Management Program) Study for RAS TANURA – Clean Fuels Project for Saudi Aramco
-
Dragon Oil Turkmenistan LimitedTurkmenistanMar-19Frame Work Agreement for Supply of Integrity Management Binh SON Refining & Petrochemical CO. LTD (BSRViet Nam Additional Modules for – PSVMS & EIRMS
-
JGC Corporation (Japan/ Algeria) & SONATRACH (Algeria)AlgeriaMar-20Criticality Analysis, FMEA, RCM & RBI Studies for HASSI MESSAOUD Upside North Project
-
MARAFIQ Power & Water Utility Company for Jubail and Yanbu,Saudi ArabiaSaudi ArabiaMar-20Continuous Reliability Improvement Program (Phase-3)
-
Dragon Oil Turkmenistan LimitedTurkmenistanOct-18Consultancy Services for Inventory Auditing, Validation and Valuation
-
Dolphin Energy LimitedQatarApr-20Development of CMMS for Offshore EPRS Project
-
STAR RAFINERITurkeyApr-18Maintenance Master Data Collection, Creation, Cleansing, Enrichment and Preparation Load Ready Files Project for Computerized Maintenance Management System (CMMS)
-
Dragon Oil Turkmenistan LimitedTurkmenistanOct-17Enterprises Asset Management (EAM) Services for additional assets of L-F facility
-
Dragon Oil Turkmenistan LimitedTurkmenistanApr-17Enterprises Asset Management (EAM) Services for Tank Farm
-
Qatar Engineering & Construction W.L.L/Dolphin Energy LimitedQatarJul-17Providing SAP Templates-CMMS Services for IWMP PROJECT in Dolphin Energy Limited
-
Dolphin Energy LimitedQatarNov-16Preventative Maintenance Optimization
-
KPOCMalaysiaSep-15Preparation of Asset register & FMECA based RCM Analysis including PMRs Development as Part of Asset & Operation Integrity Services
-
MISC Offshore Floating Terminals (L) LimitedMalaysiaOct-14Reliability Centered Maintenance (RCM) of Maintenance Optimization Program (MOP) as part of Continuous Improvement Plan (CIP) for Asset Integrity Management (AIM) System as FPSO Bunga Kertas
-
ChemanolSaudi ArabiaOct-15Reliability Centered Maintenance (RCM) at Chemanol
-
Petronas CarigaliMalaysiaOct-14MOB OF RAM ENGR & RAM CONSLTCY (BETTY) as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
-
Petronas CarigaliMalaysiaOct-14CTRs OFFSHORE VISIT – TE, D18,BY,BK as part of Provision of Consultancy for Field Reliability, Availability, Maintainability (RAM) Model Development using MAROS for Petronas Carigali Sdn Bhd-Sarwak Operations
-
Petronas CarigaliMalaysiaOct-14Provision of Consultancy for field Reliability, Availability, Maintainability (RAM) Model development using MAROS for Petronas Carigali Sdn Bhd – Sarawak operations
-
MURPHYMalaysiaOct-14Development & Implementation of Integrated Maintenance & Reliability System
-
Al-Khafji Joint Operations-KJOSaudi ArabiaOct-13RCM / RAM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 2
-
ENI PAKISTAN LIMITED.PakistanJul-10Reliability Centered Maintenance (RCM) / RAM Study”Supply”
-
Al-Khafji Joint Operations-KJOSaudi ArabiaOct-09RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software. Phase – 1
-
Saudi AramcoSaudi ArabiaJul-20RBI Ever-Greening Studies MFC at Saudi Aramco Khursaniyah Gas Plant
-
Dragon Oil Turkmenistan Limited (DOTL)TurkmenistanFeb-20Risk Based Inspection Assessment Integrity Services for LAM – 10, LAM – 75, ZHD – 21 & ZHD – 60 Offshore Platforms of DOTL
-
OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)OmanApr-20RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
-
Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)MalaysiaJun-20Provision of Risk Based Inspection (RBI) Assessment for Phase 4 Top Side Vessels, Pipings, Structures and Underwater Pipelines for Block B-17-01
-
Groupement RegganeAlgeriaDec-19Provision of Technical Assistance To Prepare The Triannual and Decennial Shutdown For Reggane Facilities
-
CCC Engineering Ltd (CCC)UAEDec-19Risk Based Inspection (RBI) Study for Das Island Project (GTG)
-
Ma’aden PhosphateSaudi ArabiaMay-19Power & Utilities Piping Corrosion Loop Identification & Establishing Inspection Strategy
-
JGC | FLUOR BC LNG JVCanadaJun-19Risk-Based Inspection (RBI) Study for LNG Canada Project
-
SAIPEMSaudi ArabiaJun-19Risk Based Inspection (RBI) Study As Per Saep-343 For Hawiyah Gas Plant Expansion Project Hawiyah Saudi Arabia
-
DOTLTurkmenistanJul-19Risk Based Inspection Assessment Integrity Services for LAM – 13, LAM – 63 & Block – 4 Offshore Platforms of DOTL
-
National Petroleum Construction Company (NPCC)UAEJun-19Risk Based Inspection Study (RBI) for Project No. 7313
-
SK Engineering & ConstructionKoreaJan-19Risk Based Inspection & Corrosion Control Monitor for M Project
-
National Petroleum Construction Company (NPCC)UAEJan-19Risk Based Inspection Study for Project 7275 for ADNOC Offshore -Bu-Haseer Full Field Development (FFD)
-
DOTLTurkmenistanSep-18Consultancy Services Framework Agreement for Implementation of Integrity Management System
-
PETCO SudanSudanOct-18Provision of Establishment CMLs/TMLs and Inspect Plan to build Inspection Database for PS No. 1 & MT
-
TECNICAS REUNIDAS, S.A.Saudi ArabiaAug-18Risk Based Inspection (RBI) Study as part of RAS TANURA – Clean Fuels Project for Saudi Aramco
-
NPCC/Saudi AramcoSaudi ArabiaJun-18CMP & RBI Study (Project 6285) for Fabrication and Installation of (SFNY, ZULF AND BRRI) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
-
Emirates SteelUAEJun-18Risk Based Inspection
-
CCELUAEFeb-18Risk Based Inspection (RBI) Study for NASR Phase II, EPC Pacakge-3
-
TANAPTurkeyNov-16Asset Integrity Management Services
-
DOTLTurkmenistanFeb-17Integrity Management Software Deployment
-
Hyundai Heavy Industries Ltd.KoreaOct-17Baseline Risk Based Inspection (RBI) Passport for NASR Package-2 Project
-
Saudi AramcoSaudi ArabiaOct-15Risk Based Inspection (RBI) Evergreening at Uthmaniyah Gas Plant
-
Groupement Berkine SH/AACAlgeriaOct-15RBI Implementation Project with Provision of Software and Associated Services
-
Brunei Methanol Company (BMC)BruneiOct-16Risk Based Inspection (RBI) program implementation
-
JGSK Joint VentureKuwaitMar-16Risk-Based Inspection (RBI) Study for KNPC Clean Fuels Project MAA Package
-
TECHNIPUAEOct-16Risk Based Inspection (RBI) Study for TECHNIP
-
Saudi AramcoSaudi ArabiaOct-16Corrosion Management Program (CMP) at BGP
-
SK EngineeringKoreaOct-16RBI for (CMP) Finalization
-
SAIPEMSaudi ArabiaOct-16Supply Specification for Risk Based Inspection (RBI) Study Karan 52/60, Karan 7, Karan TP-1 Auxiliary Platforms
-
SAIPEMSaudi ArabiaOct-16Risk Based Inspection Study (RBI) For ARBI 20/23 Gas Wellhead Project
-
Oman Oil Company Exploration & Production LLC (OOCEP)OmanOct-16Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
-
Pakistan Petroleum LimitedPakistanOct-16Risk Based Inspection of stationery equipment at Sui Field Location
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Provision of Pipeline Risk Based Assessment For PETRONAS CARIGALI SDN BHD
-
Glaxo Smith Kline (GSK)PakistanOct-16As-Built P&IDs and RBI Assessment of Piping System
-
Dubai Electricity and Water Authority (DEWA)UAEOct-16Integrity Inspection of Natural Gas System Piping for D, E, G, K & H Stations Dubai Electricity and Water Authority (DEWA)
-
SAIPEMSaudi ArabiaOct-15Risk Based Inspection for Jazan Project for SAIPEM (Equipment & Piping)
-
Hyundai Arabia LimitedKoreaOct-15Risk Based Inspection (RBI) at Jazan Refinery & Terminal Project for Hyundai Arabia Limited
-
Saudi AramcoSaudi ArabiaOct-15Conduct Risk Based Inspection at Manifa Producing Facilities (MPD) for Saudi Aramco
-
ORYX GTLQatarOct-15RBI Equipment Assessment for ORYX GTL
-
Luk Oil Middle East Ltd.UAEOct-15Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
-
SNGPLPakistanOct-15Pipeline Integrity Management System Implimentation
-
Dolphin Energy LimitedUAEOct-15Risk Based Inspection Study (RBI) for Dolphin Energy Limited
-
Saudi AramcoSaudi ArabiaMay-14RBI for Juaymah NGL Fractionation (Module 3 & 4)
-
DALEEL PETROLEUM L.L.COmanJul-14RBI at Daleel – Integrity Study of Bushra Line
-
Saudi AramcoSaudi ArabiaAug-14RBI Initiation & Evergreening at Yanbu Refinery
-
Saudi AramcoSaudi ArabiaNov-14RBI at Hawiyah Gas Plant
-
Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)MalaysiaMar-14Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
-
Saudi AramcoSaudi ArabiaOct-14RBI Assessment Service Providers at HGP for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-14Risk Based Inspection (RBI) Assessment on K44 & K83-100 for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-14Risk Based Inspection (RBI) Study for PS-1 & PS-3 for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-14Risk Based Inspection (RBI) Static Equipment and Piping at Hawiyah GOSP – 3 & Haradh GOSP – 2 & 3 for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-14Risk Based Inspection (RBI) at Jeddah Refinery for Saudi Aramco
-
Saudi AramcoSaudi ArabiaFeb-14RBI for Gas Oil Separation Plants (GOSP) at Hawiyah GOSP-3 and Haradh GOSP 2 & 3
-
Saudi AramcoSaudi ArabiaMar-14RBI for Berri Gas Plant – F20, 470 & 474 HP
-
Saudi AramcoSaudi ArabiaMay-14RBI at Khurais (KhPD) Static Equipment
-
PETRONAS FLNG 1 (L) LtdMalaysiaApr-14Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 001A Pipeline RBI Study-crude
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 001B Pipeline RBI Study-Gas
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 002A Structure RBI Study-Sub Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 002B Structure RBI Study-Topside Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 004 RBI Study for Topside Equipments, Piping System and Pressure Relief Devices
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 005 Identification of Deadlegs , Small Bore Identification, injections points, corrosion monitoring and support locations, and preparation of registers
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006A Preparation of Inspection Drawings for Topside Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006B Preparation of Inspection Drawings for 8-Legged Subsea Jacket Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006C Preparation of Inspection Drawings for Topside Piping System and Equipments
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006D Preparation of Inspection Drawings for Pipelines and Risers
-
Luk Oil Middle East Ltd.UAEOct-13Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
-
Qatar Aluminium Ltd. (QATALUM)QatarOct-13Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
-
Binh SON Refining & Petrochemical CO. LTD (BSRViet NamOct-13Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
-
Saudi AramcoSaudi ArabiaOct-13Conduct RBI for GPD Gas Wells and Manifolds for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-13Risk Based Inspection (RBI) at North Jeddah Bulk Plant for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-13Conduct Risk Based Inspection (RBI) at JNGLF for Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-13Risk Based Inspection (RBI) Study at AAPD & KRSN Plants.
-
Saudi AramcoSaudi ArabiaOct-13Additional Conduct Risk Based Inspection (RBI) at UGP for Saudi Aramco
-
Saudi AramcoSaudi ArabiaApr-13Conduct RBI at Juaymah NGL Fractionation Dept
-
Salamander EnergyMalaysiaAug-14Work Pack of Topside for Bravo Platform plus Processing and Power Module
-
EQUION Energy Limited.ColombiaOct-13Integrity Management Support Services for EQUION Energy Limited.
-
Saudi AramcoSaudi ArabiaOct-13Conduct an RBI Services for Yanbu Refinery for Saudi Aramco
-
Saudi AramcoSaudi Arabia May-2013Risk Based Inspection at K44 & K83-100 (Khursaniyah Gas Plant)
-
Bunduq Company LtdUAEOct-13Structural Integrity Assessment and Life Extension Study for WHP-E Wellhead Platform for BUNDUQ Company Limited.
-
Bunduq Company LtdUAEOct-13Facility Integrity Management System (FIMS) Implementation for Platform WHP-A ,WHP- B & EB-06 Wellhead Platforms Structure, Pipelines
-
Bunduq Company LtdUAEOct-13Facility Integrity Management System (FIMS) Implementation for WHP-B & WHP-D Wellhead Platform Structure, Pipeline & Topsides for BUNDUQ Company Limited.
-
BW Offshore Singapore LtdSingaporeOct-13Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
-
Salamander EnergyMalaysiaFeb-13Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
-
Salamander EnergyMalaysiaAug-12Pilot RBI Study for Wellhead Structure
-
Salamander EnergyMalaysiaAug-12Pilot RBI Study for Wellhead to Process Platform /onshore
-
Saudi AramcoSaudi ArabiaOct-12Risk Based Inspection Study at Uthmaniyah Gas Plant for Saudi Aramco
-
Talisman Energy LimitedCanadaJul-12Computerized Integrity Engineering Services
-
Talisman Energy LimitedCanadaSep-12Development of Asset Register for Topside Pressurized Equipment, Piping System and PSV’s for KNPD-A Platform
-
Talisman Energy LimitedCanadaNov-12Development of Asset Register for Jackets – 4 Legged Platform (Primary, Secondary and Tertiary) for KNPD – A Platform
-
Talisman Energy LimitedCanadaNov-12Development of Asset Register for Subsea, Pipelines and Riser for KNPD – A Platform
-
Talisman Energy LimitedCanadaNov-12Development of Corrosion Loops for Pressurized Equipments, Piping Systems and CAD Mark up for PFD’s (P&ID’s) for KNPD – A Platform
-
Talisman Energy LimitedCanadaNov-12Development of Asset Register for Topside Structure (Primary, Secondary and Tertiary) for KNPD – A Platform
-
Talisman Energy LimitedCanadaOct-12Provision of Integrity Engineer, CIMS Engineer & CIMS Specialist for Kinabalu Transition
-
Talisman Energy LimitedCanadaJan-13Provision of Services of CIMS Engineer / Specilist,Integrity Engineer / Specilist Draftman and Techncial Assistant to be based in TML office Malaysia on full time basisor Abu Dhabi office
-
Bunduq Company LtdUAEOct-12Facility Integrity Management System Implementation for Wellhead Platform WHP-A, WHP-C and EB-06 For BUNDUQ Company Limited.
-
Bunduq Company LtdUAEOct-12Structural Integrity Assessment and Life Extension Study for WHP-C Wellhead Platform for BUNDUQ Company Limited.
-
RAK GASUAEOct-12Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
-
RAK GASUAEOct-12Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
-
Saudi AramcoSaudi ArabiaJul-12Conduct Risk Based Inspection (RBI) Assessment at Shedgum Gas Plant (ShGPD – FGS/PS/FS)
-
KJOSaudi ArabiaOct-11Establishment of Risk Based Inspection (RBI) Programs in Al-Khafji Joint Operations-KJO (for all Stationary Equipment & Piping System)
-
Saudi AramcoSaudi ArabiaOct-11Conduct Risk Based Inspection (RBI) Services for YNGL Plant – Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-11Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-11Risk-Based Inspection (RBI) Assessment of DHT Complex for Ras Tanura Refinery Saudi Aramco
-
ADGASUAEOct-11Development of Static Equipment Inspection Task Plans and Master Plan by using API RBI approach for ADGAS LNG Complex.
-
GASCOUAEOct-11Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
-
DUSUPUAEOct-10Provision of Risk Based Inspection (RBI) based as part of Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & -‘B’. for Dubai Supply Authority (DUSUP).
-
Saudi AramcoSaudi ArabiaOct-10Risk Based Inspection (RBI) Static Equipments & Piping at QSWP for Saudi Aramco
-
Salamander EnergyMalaysiaAug-12Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
-
Egyptian LNG.EgyptJul-11Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
-
Egyptian LNG.EgyptOct-12Risk Based Inspection (RBI) based Small Bore Piping Integrity Program for Egyptian LNG.
-
TAKREERUAEJul-11Provision of RBI Assessment for Static Mechanical Equipment
-
Groupement RegganeAlgeriaDec-20Provision of Technical Assistance to Prepare the Triannual and Decennial Shutdown for Reggane Facilities in Reggane Nord Project
-
TANAPTurkeyOct-16Asset Integrity Management Services
-
ADNOC OnshoreUAEOct-16Updating of ADNOC Onshore Corporate Inspection Management System Procedure Document
-
Bunduq Company LtdUAEOct-13Preparation of Facility Integrity Management (FIMS) Inspection Procedures in line ADNOC Guidelines.
-
KPOCMalaysiaOct-13CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
-
ADGASUAEOct-12Static Equipment Inspection Task Plans and Master Plan by using API RBI approach for ADGAS LNG Complex.
-
NewfieldUAEOct-12Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc. (Upstream Oil & Gas)
-
Salamander EnergyMalaysiaOct-12Pilot Risk Based Inspection (RBI) Study for Offshore Pipeline from Wellhead to Process Platform for Salamander Energy (Bualuang) Limited.
-
Salamander EnergyMalaysiaOct-12Pilot Risk Based Inspection (RBI) Study for Wellhead Structure for Salamander Energy (Bualuang) Limited.
-
Saudi AramcoSaudi ArabiaOct-12Risk-Based Inspection (RBI) Implementation at DHBP & DHTF for Ras Tanura Refinery Saudi Aramco
-
Saudi AramcoSaudi ArabiaOct-12Risk-Based Inspection (RBI) Assessment of DHT Complex – Saudi Aramco
-
Qatar PetroleumQatarOct-12Develop Risk Based Inspection (RBI) based inspection plans for in – plant piping within DUKHAN for Qatar Petroleum
-
KJOSaudi ArabiaOct-12Establishment of Risk Based Inspection (RBI) Programs in Al-Khafji Joint Operations-KJO (for all Stationary Equipment & Piping System)
-
Saudi AramcoSaudi ArabiaOct-12Risk Based Inspection (RBI) Static Equipment’s & Piping at QSWP for Saudi Aramco
-
Dragon OilUAEOct-11Development of Design Specification for Dragon Oil Dubai
-
Saudi AramcoSaudi ArabiaOct-11Training of Risk Based Inspection (RBI) Courses for Saudi Aramco
-
GASCOUAEOct-11Development of piping and Dead-legs management system by using S-RBI approach for GASCO Habshan. (NGL Plant)
-
GASCOUAEOct-11Development of piping and Dead-legs management system by using S-RBI approach for GASCO Ruwais. (LPG Plant)
-
GASCOUAEOct-11Development of piping and Dead-legs management system by using S-RBI approach for GASCO BAB. (Gas Processing Plant)
-
GASCOUAEOct-11Development of piping and Dead-legs management system by using S-RBI approach for GASCO BuHasa. (Gas Processing Plant)
-
GASCOUAEOct-11Development of piping and Dead-legs management system by using S-RBI approach for GASCO Pipeline.
-
KJOSaudi ArabiaOct-11RBI / RCM based Reliability and Maintenance effectiveness Implementation by using Meridium RCMO software for Al-Khafji Joint Operations (KJO)
-
ADGASUAEOct-10Development of Static Equipment Inspection Task Plans & Master Plan
-
DUSUPUAEOct-10Provision of Risk Based Inspection (RBI) based Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & ‘B’. for Dubai Supply Authority (DUSUP).
-
DUSUPUAEOct-10Provision of Risk Based Inspection (RBI) based Asset Integrity Management Studies for Plant Piping for Dubai Supply Authority (DUSUP).
-
GASCOUAEOct-08Development of piping and Dead-legs management system by using S-RBI approach for GASCO. (ASAB – 1 & ASAB – 2)
-
CPP/Oman Tank Terminal Company L.L.C. (OTTCO)OmanOct-20RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ CRUDE OIL PARK
-
Groupement RegganeAlgeriaOct-20Provision of Technical Assistance Services to Develop the Preventive Maintenance Plans and MRP for Reggane Facilities in Reggane Nord Project
-
Petro EnergySudanOct-20Petro Energy – Provision of Reliability Engineering Services for Block-6 Facilities as Introduction to Asset Integrity Management Program
-
DaleelOmanOct-20DALEEL-Provision of Consulting Services for Preventive Maintenance Optimization (PMO) Upgrade
-
BAPCOSudanOct-20Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
-
Abu Dhabi National Oil Company (ADNOC Onshore)UAEOct-13Consultancy Services for Periodic Equipment Integrity Review (PEIR)
-
Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)UAEOct-12Reliability & availability study for ADGAS Flow measuring equipment’s.
Health, Safety and Environmental Services
-
CLIENTLOCATIONYEARTITLE
-
ADNOC Sour GasUAEOct-20Updating the Existing SGD Operations HSEIA
-
ADNOC DistributionUAEOct-20Consultancy Services for Operation Health, Safety & Environmental Impact Assessment (HSEIA) Study
-
DOTL Dragon Oil (Turkmenistan) LimitedTurkmenistanOct-20Safety Case for Onshore Facility
-
Target Engineering Construction Company L.L.C.UAEOct-19HSE Studies as per ADNOC Project Specification for BUNDUQ
-
ADNOC RefiningUAEOct-19Health, Safety & Environmental Impact Assessment (HSEIA) Services for Refinery Off Gases Recovery Project – Project No. 6142
-
ADNOC RefiningUAEOct-19Health, Safety & Environmental Impact Assessment (HSEIA) Services for New Linear Alkyl Benzene (LAB) Complex at Ruwais – Project No. 6159
-
NDC National Drilling CompanyUAEOct-17HSE Audit Surveys at Onshore & Offshore Rigs for National Drilling Company
-
NDC National Drilling CompanyUAEOct-15HSE Audit Surveys at Onshore & Offshore Rigs for National Drilling Company (Variation Order No. 1)
-
NDC National Drilling CompanyUAEOct-17HSE Audit at Onshore and Offshore Rigs (Variation Order No. 2)
-
ZADCO Zakum Development CompanyUAEOct-12Provide HSECES Services on Upper Zakum (South Satellite Platform, North Satellite Platform, West Satellite Platform)
-
ZADCO Zakum Development CompanyUAEOct-12Provide HSECES Services including the 16 wellhead Platforms and CPC Platforms
-
ZADCO Zakum Development CompanyUAEOct-12Provide HSECES Services for UAD CPC and WHPT Facilities
-
KPOC Kebabangan Petroleum Operating CompanyUAEOct-13Identification of SCE and System Development of Verification Scheme
-
ADOC Abu Dhabi Oil Co. Ltd.UAEOct-15Basic Engineering Study for Fire Risk Assessment Implementation (Phase-1)
-
QP Qatar PetroleumQatarOct-15Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
-
QP Qatar PetroleumQatarOct-17Variation Order for Consultancy Services for HSE & Fire Quantitative Risk Assessment Study at Dukhan Fields
-
BOROUGE Abu Dhabi Polymers Company LtdUAEOct-17Pro-forma Call – Off Order No. PCO/HSEIA/17/ 001 – Provision of HSEIA (Phase 1) for CBMB FEED Services Project (PO/725)
-
TAKREER (ADNOC Refining)MalaysiaOct-16BeAAT Expansion Project – Project No. 5649 Phase 2 & 3 Health, Safety and Environmental Impact Assessment (HSEIA) Study
-
TAKREER (ADNOC Refining)UAEOct-15Waste Heat Recovery Project – Project No. 6143 Health, Safety and Environmental Impact Assessment (HSEIA) Study
-
TAKREER (ADNOC Refining)UAEOct-15Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
-
TAKREER (ADNOC Refining)UAEOct-13Norm Handling Treatment and Disposal Project at BeAAT Project No.5640 Phase 2 & 3 (HSEIA) Study
-
TAKREER (ADNOC Refining)UAEOct-13Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA – Project No.5643
-
GASCO Abu Dhabi Gas Industries Ltd.UAEOct-13Asset Register Verification & HSECES Implementation for GASCO Pipeline Network Division
-
Qatar Fuel CompanyQatarOct-12Safety & Environment Risk Analysis for WOQOD Lube Oil Blending Plant – Mesaieed
-
TAKREER (ADNOC Refining)UAEOct-11Independent Audit Verification for HSECES at ADRD & RRD
-
QP Qatar PetroleumQatarOct-10Consultancy Services for HSE Integrity Study of 70 Petrol Stations
-
SONATRACHAlgeriaJul-20Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
-
SONATRACHAlgeriaOct-17Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
-
TAKREERUAEMay-19HSE Critical Integrity Verification for TAKREER Facilities
-
TAKREERUAEDec-12Independent Audit Verification for HSECES at ADRD and RRD
-
TAKREERUAEMar-10PSM & HSE Audit for TAKREER Refineries. / including ADNOC Energy Complex Building.
-
Pak-Arab Refinery Limited (PARCO)PakistanMar-15Third party QSHE & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
-
QATAR PetroleumQatarJan-2013Integrity & HSE Study for 70 Petrol Station of QATAR Petroleum
-
National Drilling Company (NDC)UAEJan-13HSE Audit Survey at Onshore & Offshore Rigs
-
National Drilling Company (NDC)UAEOct-11HSE Audit Surveys at Onshore & Offshore Rigs
-
Q-CONPakistanJun-09Risk Analysis for Installing Vapor recovery arm
-
Fibrex Construction LLC (GRC-1)USOct-20Environmental Monitoring & Testing of GRC1
-
ITALCONSULTUAEOct-20Preliminary Envinmental Review (PER) for Upgrading of the Road Al Fayato Seih Shuaib E75
-
MOHAMMED ABDULMOHSIN AL-KHARAFI & SONSUAEOct-20Construction Environmental Management Plan for Construction of Internal Roads & Infrastructure in Baniyas East & West Stage II
-
ALTORATH INTERNATIONAL ENGINEERING CONSULTANTS LLCUAEOct-20Provision of 3rd Party Approval of Detailed Design Package & Pre-Commissioning Package of NG/SNG Installation Pipe Work
-
FIBREX CONSTRUCTION LLCUAEOct-20Environmental Monitoring & Testing of Yasra Plot Development Staff Accommodation in Yas Island
-
AL FAHJAN TRANSPORTATION & GENERAL CONTRACTINGUAEOct-19Construction Environmental Management Plan for Development of Asharej Roundabout in AlAin
-
WESCO LLCUAEOct-20Environmental Monitoring & Testing of Mussafah Premises
-
GULF CRYO EMIRATES INDUSTRIAL GASESUAEOct-20Environmental Monitoring & Testing of ICAD 3 OFFICE
-
AL GHAZAL TRANSPORTUAEOct-20Environmental Monitoring & Testing Of their Workshop Premises
-
GHANTOOT TRANSPORT & GENERAL CONTRACTING LLCUAEOct-20Environmental Monitoring & Testing OF Etihad Rail Stage 2&3 Project C0304-Package 2 B
-
THE RITZ CARLTON HOTEL ABU DHABIUAEOct-20Environmental Monitoring & Testing Of Hotel Premises
-
EMIRATES LIVESTOCK & MEAT PRODUCTS TRADING COMPANY LLCUAEOct-20Environmental Impact Assessment (EIA) for their Existing Facility in Jebel Ali
-
CONTRACTING & TRADING Co. (CATCO)UAEOct-20Environmental Monitoring & Testing for Ruwais Project Laydown Office & Mussafah Premises
-
EMERSON AUTOMATION SOLUTIONS BLDG BUAEOct-20Environmental Monitoring & Testing for Building B
-
SAEED AL ZAABI TYRE FACTORYUAEOct-20Environmental Monitoring & Testing for factory in Mussafah
-
Larsen & Toubro LimitedUAEOct-20• Development and preparation of Construction Environmental Management Plan (CEMP) and Quarterly Audit for Supply of Recycled water along Abu Dhabi Al Ain Road-Construction of Pipelines from Main Pump Station to Intermediate Pump Station-Package B by Abu Dhabi Distribution Company (ADDC)
-
MACEUAEOct-20·     Development and preparation of Construction Environmental Management Plan (CEMP) for Internal Roads and Infrastructure for 44 Plots at Al Wathba and Al Khatim (Package-1)
-
Al Jaber Energy Services LLCUAEOct-20Development and preparation of Construction Environmental Management Plan (CEMP) for EPC for Early Civil and Site Preparation Works (Package 5-Onshore Early Works)
-
Tecton Engineering and Construction LLCUAEOct-20Development and preparation of Construction Environmental Management Plan (CEMP) and Quarterly Audit for Supply of Recycled water along Abu Dhabi Al Ain Road-Construction of Pipelines from Main Pump Station to Intermediate Pump Station-Package A by Abu Dhabi Distribution Company (ADDC)
-
ADC Energy SystemsUAEOct-20Development and preparation of Construction Environmental Management Plan (CEMP) for Shams Development District Cooling
-
Total Abu Al BukhooshUAEOct-20Environmental Baseline Assessment as per below• Soil Sampling and Analysis• Ground Water Sampling and Analysis
-
URJA BHARAT PTE LTD/ADNOC OnshoreUAEOct-20Environment Impact Assessment Studies & Preparation of Community Engagement Plan & for Wells Drilling and Testing Operations in Onshore Block 1, UAE
-
APT GLOBAL MARINE SERVICES LLCUAEOct-20Environmental Monitoring & Testing
-
Ajman Steel Tubes & Pipes Ind LLCUAEOct-20Stack Emission Monitoring
-
MACEUAEOct-20To perform the following laboratory test;• Test for Hydrocarbon present in the discharge water including diesel (6 tests/month)• Test for solid suspensions of the discharge water present in the sample (6 tests /month
-
Neopharma LLCUAEOct-19Environmental Monitoring & Testing
-
MACEUAEOct-19Environmental Permit Application for Rehabilitation and Replacement of Existing Sewer Lines in Abu Dhabi Island- Part 5 project
-
Maatouk 1960 FactoryUAEOct-19Environmental Monitoring & Testing • Stack Emission Monitoring (Two Locations).• Noise Level Monitoring (Three Points)• Indoor Air Quality with Particulate Matter (One Point)• Chemical and Biological analysis of Potable Water (One Sample)
-
Ministry of Infrastructure/ Core Engineering ConsultancyUAEOct-19Environmental Consultancy (PER) for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
-
Ministry of Infrastructure/ Core Engineering ConsultancyUAEOct-19Terrestrial Survey for Construction & Completion of New Road Links Sheikh Khalifa Road from Maleha Through Al-Madam to Showaib Area (Phase-2)
-
MACE ContractorUAEOct-19Construction Environmental Management Plan for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
-
ADC EnergyUAEOct-19Construction Environmental Management Plan for Saadiyat DCP1-Electrical Substation†project
-
Abu Dhabi Port Company/ Energy Management ServicesUAEOct-19Environmental Impact Assessment (EIA), Construction Environmental Management Plan (CEMP) & Waste Management Plan (WMP
-
RTA/ Western Bainoona Group.UAEOct-19Environmental Baseline Survey of Dubai Site
-
Al Khaznah TanneryUAEOct-19Environmental Monitoring & TestingFollowing study are part of the scope; 1. Indoor Air Quality 2. Ambient Air Quality 3. Stack Emission Monitoring 4. Noise Level Monitoring
-
Express Pack PrintUAEOct-19Environmental Monitoring & Testing of JAFZA FacilityFollowing study are part of the scope; 1. Indoor Air Quality without Dust 2. Indoor Air Quality with Dust 3. Noise Level Monitoring 4. Light Intensity 5. Heat/Temp
-
National Cement FactoryUAEOct-19Environmental Monitoring & Testing of Musaffah Facility To perform the following study; 1. Ambient Air Quality 2. Noise Level Monitoring 3. Stack Emission
-
EMERSON AUTOMATION SOLUTIONS. BLDG AUAEOct-19Environmental Monitoring & Testing of Dubai Facility To perform the following study; 1. Indoor Air Quality 2. Personnel Monitoring
-
National Marine Dredging Company (NMDC)UAEOct-18Decommissioning Environmental Management Plan (DEMP) 1. Preparation of DEMP in accordance with EAD’s Technical Guidance Document for Decommissioning Environmental Management Plan (DEMP). 2. Velosi shall conduct compliance audits for DEMP implementation, if required.
-
MACE ContractorsUAEOct-18Development of Construction Environment Management Plan (CEMP) for Asset Enhancement Scheme – Construction of Deep Gravity Lines to Link Samha and Shahama Areas with Lines Near Ps 7/2-Area 1 Part 3
-
Emirates FutureUAEOct-18Environmental Impact Assessment (EIA) Study of Animal Breading Farm Suweihan Area Plot no 57-05-801-330
-
Pakistan Tobacco Company (PTC)PakistanOct-19Environment Site Assessment (ESA)-Phase -1
-
Pakistan State Oil Company Limited (PSO)PakistanOct-16Noise and Emission Testing of Aviation Equipment Based at Islamabad as per NEQ’s requirements.
-
Pakistan State Oil Company Limited (PSO)PakistanOct-16Noise and Emission Testing of Aviation Equipment Based at Peshawar Airport as per NEQ’s requirements.
-
Pakistan Petroleum Limited (PPL)PakistanOct-16Consultancy Services For Health, Safety & Environment (HSE) Monitoring For Exploration, Drilling, Plant Installation And Pipeline Laying Project Activities In All PPL Fields/Locations Including Exploration Blocks/Mining Leases On Call-Out Basis For Three Years Cycle.
-
Government of Gilgit Baltistan Maintenance Division PWD GilgitPakistanOct-17Construction/Extension of sustainability master plan for DHQ Hospital & Shaheed Saif-ur-Rehman Hospital Gilgit
-
Pak-Arab Refinery Limited (PARCO)PakistanOct-15Third party QSHE (Quality, Safety, Health & Environment) & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
-
Oil and Gas Regularity Authority (OGRA)PakistanOct-12CNG Station 2012 (Including Integrity & HSE (Health Safety and Environment) Studies)
-
Oil and Gas Regularity Authority (OGRA)PakistanOct-14Tank Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
-
Oil and Gas Regularity Authority (OGRA)PakistanOct-14CNG Station 2014 (Including Integrity & HSE (Health Safety and Environment) Studies)
-
Oil and Gas Regularity Authority (OGRA)PakistanOct-14Inspection of Oil Terminal (Including Integrity & HSE (Health Safety and Environment) Studies)
-
Sui Northern Gas Pipelines Limited (SNGPL)PakistanOct-07Technical Audit of Sui Nothern Gas Pipelines Limited
-
SHELL IRAQIraqOct-14Third Party Technical Integrity Verification Services
-
BOROUGEUAEOct-17Pro-forma Call – Off Order No. PCO/HSEIA/17/ 001 – Provision of HSEIA (Phase 1) for CBMB FEED Services Project (PO/725)
-
NDC (National Drilling Company)UAEOct-17HSE Audit Survey at Onshore & Offshore Rigs.
-
TAKREERUAEOct-14Norm Handling Treatment and Disposal Project at BeAAT Project No.5640 Phase 2&3 (HSEIA) Study. Including following studies:
-
TAKREERUAEOct-13Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5643
-
TAKREERUAEOct-15Sulphur Recovery Unit (Unit 106) Revamp at Ruwais Refinery Project – Project No. 6804 Health, Safety and Environmental Impact Assessment (HSEIA) Study
-
TAKREERUAEOct-15BeAAT Expansion Project- Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5649
-
TAKREERUAEOct-16BeAAT Expansion Project- Phase 2 & 3 Health Safety and Environmental Impact Assessment (HSEIA) Study for ADIA-Project NO.5649
-
Woqod Lube Oil Blending PlantQatarOct-11Feasibility Study for Safety & Environmental Risk Analysis for Lube Oil Blending Plant
-
ADNOCUAEOct-10Health, Safety & Environment Impact Assessment (HSEIA) Study for car park of ADNOC
-
MUSANADAUAEOct-14Quality and HSE (Health Safety and Environment) Audit Consultancy Pertaining to School by Musanada
-
BorougeUAEOct-13External Audit on PSM System in Olefins (EU2) Poly Olefins (PE3) for Year 2013
-
National Drilling Company (NDC)UAEOct-12HSE (Health Safety and Environment) Audit Surveys
-
Abu Dhabi Company for Onshore Oil Operation (ADNOC Onshore)UAEOct-11Consultancy Service for Periodic Equipment Integrity Review (PEIR) for ADCO
-
TAKREERUAEOct-11Independent Audit Verification for HSECES (Health, Safety & Environmental Critical Equipment Systems)
-
TAKREERUAEOct-09Process Safety Management and Safety Audit
-
Abu Dhabi Gas Industries (GASCO)UAEOct-13Asset Register Verification & HSECES (Health, Safety & Environmental Critical Equipment Systems) Study
-
Abu Dhabi Gas Industries (GASCO)UAEOct-14Asset Register Verification & HSECES (Health, Safety & Environmental Critical Equipment Systems) Performance Standard Implementation for GASCO Pipeline Network Division – Phase II
-
Zakum Development Company (ZADCO)UAEOct-12HSECES (Health, Safety & Environmental Critical Equipment Systems) Services
-
Zakum Development Company (ZADCO)UAEOct-13HSECES (Health, Safety & Environmental Critical Equipment Systems)
-
KPOCMalaysiaOct-13CTR # 8 – Identification of Safety Critical Equipment (SCE) System and development of verification scheme.
-
Qatar PetroleumQatarOct-10Provision of Consultancy Services for HSE (Health Safety and Environment) Integrity Study of Petrol Stations
-
Oman Gas Company (OGC)OmanOct-14QRA Studies for Salalah LPG Project.
-
ORPICOmanOct-15Risk Contributor Assessment Study For MAF Refinery
-
Pakistan Petroleum Limited (PPL)PakistanOct-15HAZOP Study of ESD & Blowdown Valves
-
KCA Deutag Drilling G.M.B.H IslamabadPakistanOct-15Third Party Services for Drops Survey of Onshore Rigs 2015 Call Out Basis KCA Deutag Drilling G.M.B.H Islamabad
-
MOL Pakistan Oil & Gas Co. B.V.PakistanOct-15Fire and Gas Equipment Audit Of Mol Production Facilities
Engineering Services
-
CLIENTLOCATIONYEARTITLE
-
ADNOC RefiningUAEOct-19Integrity and Remaining Life Assessment (RLA) of Boiler (121-B-01) at Ruwais Refinery East
-
ADNOC Gas ProcessingUAENov-19Remaining Life Assessment for Waste Heat Recovery Boiler
-
Abu Dhabi Oil Refining Company (TAKREER)UAEOct-18Integrity and Remaining Life Assessment (RLA) Of HP Boiler at Ruwais Refinery (EAST)
-
ADGASUAESep-17ADGAS-LNG Trains Operational Life Extension Independent Overall Assessment and Verification
-
QAFCOQatarJul-15Consultancy Services in Carrying-Out Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment & Structures
-
BUNDUQ Company LimitedUAEOct-14Pipeline Integrity Assessment and Life Extension Study for 6 Nos. Pipelines
-
BUNDUQ Company LimitedUAEOct-12BUNDUQ – Pipeline Integrity Assessment and Life Extension for 2nos Pipeline
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Provision Of Fitness For Services (FFS) Assessment Of Pipeline For Petronas Carigali Sdn Bhd- Sabah Operations
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Engineering Consultancy PL196 Fitness for Services (FFS ) as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Fitness for Services (FFS ) + Life extension assessment Study (LEA) Pipeline Intelligent Pigging as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Life extension assessment Study (LEA) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Fitness for Services (FFS ) PIPELINE ENGINEERING CONSULTANCY as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Life extension assessment Study (LEA) + Fitness for Services (FFS ) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-16Fitness for Services (FFS) PIPELINE INTELLIGENT PIGGING as part of Provision of Pipeline Risk Based Assessment for PETRONAS CARIGALI SDN BHD
-
SNGPLPakistanOct-15Pipeline Integrity Management Program
-
SPETCOKuwaitFeb-15Residual Life Assessment for Plant & Equipment’s
-
Daleel Petroleum L.L.C.UAEJul-20Integrity Study of Bushra Line 33km for DALEEL
-
ADGASUAEFeb-17ADGAS-LNG Trains Operational Life Extension Independent Overall Assessment and Verification
-
Qatar Fertilizer Company (QAFCO)QatarOct-15Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
-
Qatar PetroleumQatarOct-14Fitness For Service Of LPG Sphere 2109FB for Qatar Petroleum
-
Qatar PetroleumQatarOct-13Conduct of FFS Analysis for 2123FB Hydrogen Bullet at Refinery Mesaieed for Qatar Petroleum
-
Qatar PetroleumQatarOct-13Conduct of FFS Analysis for 2123FA Hydrogen Bullet at Refinery Mesaieed for Qatar Petroleum
-
Abu Dhabi Oil Refining Company (TAKREER)UAEOct-11Integrity and Remaining Life Assessment of High Pressure Equipment at Ruwais Refinery
-
Abu Dhabi Gas Industries Ltd (GASCO)UAEOct-07API 579 FFS Level III Study for HP Amine Absorber 33V101
-
Abu Dhabi Gas Industries Ltd (GASCO)UAEOct-07Fitness for Service study – Amine Regenerator (13-C-102)
-
Abu Dhabi Gas Industries Ltd (GASCO)UAEOct-07Amine Regenerator Reflux drum Inlet Pigging Piping 30-1010-AS
-
Abu Dhabi Gas Industries Ltd (GASCO)UAEOct-07GASCO Fitness for Service for pure pentane storage drum GASCO-(7-C-410) Ruwais Plant
-
BUNDUQ Company LimitedUAEOct-12FFS and Life Extension Services for Pressure Vessels
-
BOROUGEUAEOct-12Provision of fitness for service assessment of B2 steam boiler (53-fb-401 c)
-
Black CatQatarOct-13FFS for Existing Air Receiver Vessels (22-V-4139 & 22-V-7330)
-
BUNDUQ Company LimitedUAEOct-12Structural Integrity & Life Extension Study for WHP-B
-
BUNDUQ Company LimitedUAEOct-12BUNDUQ – Structural Integrity & Life Extension Study for WHP-C
-
BUNDUQ Company LimitedUAEOct-12Structural Integrity & Life Extension Study for WHP-E
-
BUNDUQ Company LimitedUAEOct-12Structural Integrity & Life Extension Study for WHP-F
-
BUNDUQ Company LimitedUAEOct-12Structural Integrity Assessment & Life Extension Study for EB-04
-
BUNDUQ Company LimitedUAEOct-15Structural Integrity Assessment & Life Extension Study for EB-37
-
BUNDUQ Company LimitedUAEOct-12FFS and Life Extension Services for Pressure Vessels for GSP Platform
-
Dubai Supply Authority (DUSUP)UAEOct-10DUSUP Windgirder FFS Study
-
Engro FertilizersPakistanOct-14Remaining Life Assessment for Safety Critical Equipments for Engro Fertilizers
-
Worley ParsonsOct-09Plant CBA Reactors under cyclic service Fitness for Service level –-3 Assessment.
-
GPS/ ANOH Gas Processing Company (AGPC)NigeriaAug-20Development Operating Manual and Pre-Commissioning and Commissioning Manual for ANOH Gas Plant Project, Nigeria
-
Adnoc Onshore / Al AsabUAEDec-19Development of Operating Manual and Operating Procedure as a Part of AIMS Services as part of EPC for OGD-II and OGD-0 in Asab Area
-
Bashayer Pipeline Company (BAPCO)SudanJune-2019Development of Operating Manuals & Procedures as Part of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
-
DOTLTurkmenistanMar-18Consultancy Work For Developing OPM And Company Systems & Procedures
-
L & T / Al Dhafra Petroleum Company LimitedUAENov-18Preparation of Operation and Maintenance Manual for Haliba Field Development Project, Abu Dhabi
-
ADNOC OnshoreUAEOct-17Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for ASAB & SAHIL Contract No. 16079.01
-
ADNOC OnshoreUAEOct-17Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for SHAH / QUSAHWIRA / MENDER Contract No. 16079.02
-
ADNOC OnshoreUAEOct-17Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for TPO Contract No. 16079.03
-
ADNOC OnshoreUAEOct-17Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for BAB Contract No. 16079.04
-
ADNOC OnshoreUAEOct-17Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for NEB Contract No. 16079.05
-
ADNOC OnshoreUAEOct-17Update Operating Manuals & Procedures (OP & MS) for ADNOC Onshore Fields, Terminals & Pipelines-Full Implementation Across ADNOC Onshore Assets (Phase II) for ASAB GAS & BAB GAS Contract No. 16079.06
-
TAKREERUAEOct-14Consultancy Services for Updating Operating Manual for Abu Dhabi Refinery
-
KPOCMalaysiaOct-13CTR 011 – Preparation of Pipeline Operating Manuals
-
KPOCMalaysiaOct-13CTR-012 – Preparation of Inspection Standard Operating Procedures (SOPs)
-
KPOCMalaysiaOct-13CTR-013 – Preparation of Maintenance Standard Operating Procedures (SOPs)
-
LUKOILUAEOct-13Operation and Maintenance Regulations development
-
Bunduq Company LtdUAEOct-13Preparation of Facility Integrity Management (FIMS) Inspection Procedures in line ADNOC Guidelines.
-
MURPHYMalaysiaOct-13Development & Implementation of Integrated Maintenance & Reliability System
-
Al-Khafji Joint Operations-KJOSaudi ArabiaOct-10Reliability and Maintenance effectiveness Implementation
-
Abu Dhabi Oil Co., Ltd.UAESep-20Implementation of Maintenance & Integrity Audit Gap Bridging Measures
-
ADNOCUAEAug-20First Call Out No. 1 for Development of Asset Integrity Dashboard User Manual as part of Agreement for Asset Integrity Consultancy Studies and Technical Support Services on Call out Basis
-
Bashayer Pipeline Company (BAPCO)SudanJune-2019Development of AIMS Framework as Part of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
-
TANAPTurkeyOct-16Asset Integrity Management Services
-
Oman Oil Company Exploration & Production LLC (OOCEP)OmanOct-16Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
-
ADCOUAEOct-15Updating of ADCO Corporate Inspection Management System Procedure Document
-
KPOCMalaysiaOct-13CTR. 009 – Preparation of AIMS System framework and associated documentation
-
ADGASUAEOct-10Development of Static Equipment Inspection Task Plans & Master Plan
-
KPOCMalaysiaOct-13Provision of Asset & Operation Integrity Services
-
LUKOILUAEOct-13Operation and Maintenance Regulations development
-
MURPHYMalaysiaOct-13Development & Implementation of Integrated Maintenance & Reliability System
-
Al-Khafji Joint Operations-KJOSaudi ArabiaOct-10Reliability and Maintenance effectiveness Implementation
-
CPP/Oman Tank Terminal Company L.L.C. (OTTCO)OmanApr-20RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ CRUDE OIL PARK
-
Al-Asab / ADNOCUAEJan-20Asset Integrity Management Services (AIMS) as part of EPC for OGD-II and OGD-0 in Asab Area, ADNOC Onshore
-
BAPCOSudanJul-19Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
-
State LifePakistanJul-16Hiring Consultancy Services for Survey, Design and Supervision for Upgrading of Fire Fighting Systems for State Life Buildings All Over Pakistan
-
MusanadaUAEJul-20Inspection of Musanada Buildings
-
Thales Advanced Solutions LtdUAESep-20Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
-
SONATRACHAlgeriaOct-17Development of a Study for the Compliance of the Facilities and Equipment of Regional Management STAH
Software Services
-
CLIENTLOCATIONYEARTITLE
-
TANAPTurkeyOct-16Asset Integrity Management Services
-
Petro EnergySudanOct-19Petro Energy – Provision of Reliability Engineering Services for Block-6 Facilities as Introduction to Asset Integrity Management Program
-
BAPCOSudanJul-19Provision of Asset Integrity Management System for BAPCO Pipeline System and Processing Facilities
-
Dragon Oil Turkmenistan LimitedTurkmenistanOct-20VAIL Plant EIRMS Implementation Services for LAM-C, LAM-22, LAM-13 & LAM-63 Offshore Platforms Using EIRMS Modleu
-
ADNOC LNGUAESep-20SAP Functional Location Restructuring
-
Dragon Oil Turkmenistan LimitedTurkmenistanDec-19Implementation of EIRMS Services for LAM-28, LAM-A and LAM-B Offshore Platforms Using Velosi VAIL Plant EIRMS Module
-
Dragon Oil Turkmenistan LimitedTurkmenistanMar-19Frame Work Agreement for Supply of Integrity Management Systems Additional Modules for – PSVMS & EIRMS
-
STAR RAFINERITurkeyApr-18Maintenance Master Data Collection, Creation, Cleansing, Enrichment and Preparation Load Ready Files Project for Computerized Maintenance Management System (CMMS)
-
Dragon Oil Turkmenistan Limited (DOTL)TurkmenistanFeb-20Risk Based Inspection Assessment Integrity Services for LAM – 10, LAM – 75, ZHD – 21 & ZHD – 60 Offshore Platforms of DOTL
-
OTTCO/ CHINA PETROLEUM PIPELINE ENGINEERING COMPANY LIMITED (Oman Branch)OmanApr-20RBI & RCM Study and Maintenance Procedure Development for RAS MARKAZ Crude Oil Park Project (Phase 1)
-
Groupement RegganeAlgeriaDec-19Provision of Technical Assistance To Prepare The Triannual and Decennial Shutdown For Reggane Facilities
-
CCC Engineering Ltd (CCC)UAEDec-19Risk Based Inspection (RBI) Study for Das Island Project (GTG)
-
DOTLTurkmenistanJul-19Risk Based Inspection Assessment Integrity Services for LAM – 13, LAM – 63 & Block – 4 Offshore Platforms of DOTL
-
National Petroleum Construction Company (NPCC)uaeJun-19Risk Based Inspection Study (RBI)
-
National Petroleum Construction Company (NPCC)UAEJan-19Risk Based Inspection Study for ADNOC Offshore -Bu-Haseer Full Field Development (FFD)
-
DOTLTurkmenistanSep-18Consultancy Services Framework Agreement for Implementation of Integrity Management System
-
PETCO SudanSudanOct-18Provision of Establishment CMLs/TMLs and Inspect Plan to build Inspection Database for PS No. 1 & MT
-
TECNICAS REUNIDAS, S.A.Saudi ArabiaAug-18Risk Based Inspection (RBI) Study as part of RAS TANURA – Clean Fuels Project for Saudi Aramco
-
NPCC/Saudi AramcoSaudi ArabiaJun-18CMP & RBI Study (Project 6285) for Fabrication and Installation of (SFNY, ZULF AND BRRI) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
-
Emirates SteelUAEJun-18Risk Based Inspection
-
JGC/SONATRACHAlgeriaJul-18Criticality Analysis, FMEA, RCM and RBI
-
CCELUAEFeb-18Risk Based Inspection (RBI) Study for NASR Phase II, EPC Pacakge-3
-
DOTLTurkmenistanFeb-17Integrity Management Software Deployment
-
Hyundai Heavy Industries Ltd.KoreaOct-17Baseline Risk Based Inspection (RBI) Passport for NASR Package-2 Project
-
Groupement Berkine SH/AACAlgeriaOct-16RBI Implementation Project with Provision of Software and Associated Services
-
Brunei Methanol Company (BMC)BruneiOct-16Risk Based Inspection (RBI) program implementation
-
TECHNIPUAEOct-16Risk Based Inspection (RBI) Study for TECHNIP
-
Oman Oil Company Exploration & Production LLC (OOCEP)OmanOct-16Asset Integrity Management Services for OOCEP (Equipment, piping, PSVs and Pipelines)
-
Pakistan Petroleum LimitedPakistanOct-16Risk Based Inspection of stationery equipment at Sui Field Location
-
ORYX GTLQatarOct-15RBI Equipment Assessment for ORYX GTL
-
Luk Oil Middle East Ltd.UAEOct-15Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
-
SNGPLPakistanOct-15Pipeline Integrity Management System Implimentation
-
Dolphin Energy LimitedUAEOct-15Risk Based Inspection Study (RBI) for Dolphin Energy Limited
-
DALEEL PETROLEUM L.L.CUAEJul-14RBI at Daleel – Integrity Study of Bushra Line
-
Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)MalaysiaMar-14Provision of Risk Based Inspection (RBI) Study for Structure and Pipelines for Carigali-PTTEPI Operating Company Sdn. Bhd. (CPOC)
-
PETRONAS FLNG 1 (L) LtdMalaysiaApr-14Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 001A Pipeline RBI Study-crude
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 001B Pipeline RBI Study-Gas
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 002A Structure RBI Study-Sub Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 002B Structure RBI Study-Topside Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 004 RBI Study for Topside Equipments, Piping System and Pressure Relief Devices
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 005 Identification of Deadlegs , Small Bore Identification, injections points, corrosion monitoring and support locations, and preparation of registers
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006A Preparation of Inspection Drawings for Topside Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006B Preparation of Inspection Drawings for 8-Legged Subsea Jacket Structure
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006C Preparation of Inspection Drawings for Topside Piping System and Equipments
-
Kebabangan Petroleum Operating Company Sdn. Bhd. (KPOC)MalaysiaOct-13KPOC CTR 006D Preparation of Inspection Drawings for Pipelines and Risers
-
Luk Oil Middle East Ltd.UAEOct-13Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
-
Qatar Aluminium Ltd. (QATALUM)QatarOct-13Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
-
Binh SON Refining & Petrochemical CO. LTD (BSRVietnamOct-13Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
-
EQUION Energy Limited.ColombiaOct-13Integrity Management Support Services for EQUION Energy Limited.
-
Bunduq Company LtdUAEOct-13Facility Integrity Management System (FIMS) Implementation for Platform WHP-A ,WHP- B & EB-06 Wellhead Platforms Structure, Pipelines
-
Bunduq Company LtdUAEOct-13Facility Integrity Management System (FIMS) Implementation for WHP-B & WHP-D Wellhead Platform Structure, Pipeline & Topsides for BUNDUQ Company Limited.
-
BW Offshore Singapore LtdUAEOct-13Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
-
Salamander EnergyMalaysiaFeb-13Baseline Risk Based Inspection (RBI) study for offshore pipeline from wellhead to process platform / onshore
-
Salamander EnergyMalaysiaAug-12Pilot RBI Study for Wellhead Structure
-
RAK GASUAEOct-12Development of RBI Based Asset Integrity Management Strategy & System for Topside Equipments in RAK GAS
-
RAK GASUAEOct-12Development of RBI Based Asset Integrity Management Strategy & System for Offshore / Onshore Pipelines in RAK GAS
-
DUSUPUAEOct-10Provision of Risk Based Inspection (RBI) based as part of Asset Integrity Studies for Jabel Ali Storage Tanks 60-TK-001 ‘A’ & ‘B’. for Dubai Supply Authority (DUSUP).
-
Salamander EnergyMalaysiaAug-12Baseline Risk Based Inspection (RBI) Study for Topsides Equipments
-
Egyptian LNG.EgyptJul-11Risk Based Inspection (RBI) based Strategy for the management of Dead Leg of Unit 1U-14, 15, 16 and 17 for Egyptian LNG.
-
Egyptian LNG.EgyptJul-11Risk Based Inspection (RBI) based Small Bore Piping Integrity Program for Egyptian LNG.
-
NewfieldUAEJul-11Provision of RBI Assessment for Static Mechanical Equipment
-
OIL & GAS DEVELOPMENT COMPANY LIMITEDPakistanAug-20HIRING OF NDT. MIA. RBI & OTHER INSPECTION & CERTIFICATION SERVICES
-
Pakistan Petroleum Limited (PPL)PakistanAug-20MAINTENANCE AND SUPPORT SERVICES OF VAIL (VELOSI ASSET INTEGRITY LIMITED) PLANT SOFTWARE FOR THREE YEARS
-
Dragon Oil Turkmenistan Limited (DOTL)TurkmenistanSep-20VAIL Plant Software License Agreement Extension for EIRMS & PSVMS Modules for 3 Years
-
Dragon Oil Turkmenistan Limited (DOTL)TurkmenistanFeb-20SOW for RBI Assessment and Implementation for VAIL-Plant PIMS, SIMS, & PEMS for LAM-10, LAM-75, ZHD-21, and ZHD-60
-
Daleel Petroleum LLCOmanOct-19Provision of Consulting Services for Preventive Maintenance Optimization (PMO) upgrade.
-
ILK ConstructionTurkmenistanOct-19EPIC(Engineering, Procurement, Construction, Transportation, Installation, Commissioning) for three (3) New Wellhead Towers & Associated Pipelines Network for Water Injection (LAM Oilfield)
-
ADNOC LNGAbudhabiSep-19One ERP EAM Interface Development
-
Idemitsu Kosan Co., Ltd.VietnamJan-19Provision of Asset Integrity Management System (AIMS) and Support ServicesAIMS Modules and User Licenses
-
Binh Son Refining and Petrochemical Company Limited (BSR)VietnamDec-18VAIL-Plant Annual Support/Maintenance and Modifications
-
National Petroleum Construction Company (NPCC)UAEMay-18Corrosion Management Program & RBI Study (Project 6285) for Fabrication And Installation Of (Sfny, Zulf And Brri) SSS Decks & Topsides Tie-Ins, Offshore Pipelines, Submarine Cables
-
ARABIAN DRILLING COMPANY – KJOSaudi ArabiaJun-17Supply of Software & Personnel for Material Tracking
-
SNGPLPakistanOct-15Pipeline Integrity Management Program
-
Saudi AramcoSaudi ArabiaSep-13RBI study for Pipelines for GPD Gas Wells and Manifolds for Saudi Aramco
-
LukOil Middle East Ltd.,UAEMay-13Development, Implementation and Support of Risk Based Inspection Programs for Field Production Facilities of the Qurana -2 Field in Iraq
-
PETRONAS CARIGALI SDN BHDMalaysiaOct-10Provision of Pipeline Risk Based Inspection (RBI) Study for PETRONAS CARIGALI SDN BHD – PENINSULAR Malaysia Operations (PCSB-PMO) including VAIL Pipeline software
-
Binh SON Refining & Petrochemical CO. LTD (BSR)VietnamSep-12Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
-
LUKOIL MID-EAST LIMITEDUAEJan-16Development, Implementation and Support of Pressure Safety Valves Inspection Management System (PSV IMS) for PSV’s Operated at Production Facilities of the West Qurna-2 Field for Lukoil
-
Newfield Peninsula MalaysiaMalaysiaJul-12Provision of Risk-Based Inspection (RBI) Assessment for Static Mechanical Equipment and Piping for Production Operation for Newfield Peninsula Malaysia Inc.
-
Oman Oil Company Exploration & Production LLC (OOCEP)OmanOct-17Provision of Asset Integrity Management Services for Block-60
-
PETRONAS Floating LNG 1 (L) Ltd.MalaysiaApr-14Risk Based Inspection (RBI) program development for PETRONAS FLNG 1 (L) Ltd. Topside Structure and HULL for PETRONAS Floating LNG 1 (L) Ltd.
-
Qatar Aluminium Ltd. (QATALUM)QatarDec-13Written Scheme of Examination – Inspections for Steam and Feed Water Systems for Qatar Aluminium Ltd. (QATALUM)
-
Methanol Chemicals CompanySaudi ArabiaOct-14Reliability Centered Maintenance (RCM) at Chemanol
-
Bunduq Company LtdUAEJan-12Development, Implementation and Support of Pressurized Equipment Management System (PEMS) for Equipment and Piping System
-
BW OffshoreSignaporeJun-12Implementation of VAIL-Plant Software and Provision of RBI Services for BW Offshore Singapore Ltd.
-
ADGASUAEDec-10Inspection Management System
-
Al Khafji Joint OperationSaudi ArabiaMar-11Establisment of Risk Based Inspection Program
-
Zakum Development Company (ZADCO)UAEJul-16Development of Performance Standards and Written Scheme of Examination for ZADCO HSECES.
-
MurphyMalaysiaApr-11Development and Implementation of an integrated maintenance and reliability system (MRS) for Murphy’s operations
-
ENI, PakistanPakistanOct-10Reliability Centered Maintenance (RCM) Study Supply ENI, Pakistan including VAIL-Plant Software
-
Al Khafji Joint OperationSaudi ArabiaOct-10Reliability & Maintenance Effectiveness Implementation including VAIL-Plant Software
-
GASCOUAEOct-09Development of piping and Dead-legs management system by using S-RBI approach for GASCO (ASAB 0 & ASAB 1) Including VAIL-Plant (PEMS) software
-
GASCOUAEOct-09Development of piping and Dead-legs management system by using S-RBI approach for GASCO (HABSHAN) Including VAIL-Plant (PEMS) software
-
GASCOUAEOct-09Development of piping and Dead-legs management system by using S-RBI approach for GASCO (RUWAIS) Including VAIL-Plant (PEMS) software
-
GASCOUAEOct-09Development of piping and Dead-legs management system by using S-RBI approach for GASCO (BU HASA) Including VAIL-Plant (PEMS) software
-
DUSUPUAEOct-09Asset Integrity Management Study for Plant Piping Including VAIL-Plant (PEMS) software
-
PENSPEN ThailandThailandOct-10Specification for HAZOP & SIL Determination Study including (VAIL SIL) software
-
Qatar PetroleumQatarJun-14Condition Assessment for Super Structure of LPG Tanks at Gas Operations, MESAIEED VAIL-Plant Software (SIMS) software
-
QCONPakistanOct-10Risk Analysis for Installing Vapour recovery arm including VAILHAZOP software
-
BP PakistanPakistanOct-08Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system) including VAIL SIL software
Audit Services
-
CLIENTLOCATIONYEARTITLE
-
Binh SON Refining & Petrochemical CO. LTD (BSRVietnamOct-15Provision of Risk Based Inspection (RBI) 2nd Phase at Dung Quat Refinery for Binh SON Refining & Petrochemical CO. LTD-.
-
Al-Khafji Joint Operations (KJO)Saudi ArabiaApr-08Reliability and Maintenance Effectiveness Review & Implementation
-
Abu Dhabi National Oil Company (ADNOC Onshore)UAEMar-13Consultancy Services for Periodic Equipment Integrity Review (PEIR)
-
Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)UAEApr-09Reliability & availability study for ADGAS Flow measuring equipment’s.
-
BOROUGEUAEMay-20Borouge Inspection & Corrosion Management System Audit
-
Pakistan Petroleum LimitedPakistanDec-18Process Safety Management (PSM) Evaluation & Benchmarking Study at PPL
-
Sui Northern Gas Pipelines Ltd. (SNGPL)PakistanMay-18Technical Audit of Sui Northern Gas Pipelines Limited
-
Sui Northern Gas Pipelines Ltd. (SNGPL)PakistanAug-07Technical Audit of Sui Northern Gas Pipelines Limited
-
BOROUGEUAEJul-13External Audit on Process Safety Management System in Olefins (EU2), Poly-Olefins Olefins (PE3) for Year 2013
-
MOL PAKISTAN OIL AND GAS CO.PakistanApr-15Fire and Gas Equipment audit for MOL Production Facilities
-
Inter State Gas System (ISGS) Private LimitedPakistanDec-12Price Audit Services Contract
-
Dragon OilUAEOct-14EPIC Contract Performance Assessment audit for Dragon Oil Turkmenistan.
-
Abu Dhabi Gas Liquefaction Company Ltd. (ADGAS)UAEMay-08Review and Assessment of ADGAS SOP in accordance with AIRMS as part of Development of Static Equipment Inspection Task Plan & Master Plan
-
BP-PakistanPakistanJan-08Review and Assessment of performance standards for BPP-Badin facilities (especially for protective system)
-
DHAFIR TechnologiesUAEApr-15Third Party Review and Certification of Drawings and Documents for Firefighting at Ruwais Refinery
-
MusanadaUAESep-14Quality and HSE Audit Consultancy pertaining to Schools by Musanada
-
ENERCONUAEAug-16Detailed Energy Audit
-
State LifePakistanJul-16Hiring Consultancy Services for Survey, Design and Supervision for Upgrading of Fire Fighting Systems for State Life Buildings All Over Pakistan
-
MusanadaUAEJul-20Inspection of Musanada Buildings
-
Thales Advanced Solutions LtdUAEApr-16Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
-
SONATRACHAlgeriaJul-20Realization of the technical diagnosis and development of an Implementation program According to hydrocarbons installations of the Transport Regions Central (RTC), West (RTO), and East (RTE)
-
TAKREERUAEAug-11Independent Audit Verification for HSECES at ADRD and RRD
-
TAKREERUAEDec-09PSM & HSE Audit for TAKREER Refineries. / including ADNOC Energy Complex Building.
-
Pak-Arab Refinery Limited (PARCO)PakistanFeb-15Third party QSHE & House Keeping Audit at 09 PARCO & PARCO Stations and Terminal
-
QATAR PetroleumQatarJan-13Integrity & HSE Study for 70 Petrol Station of QATAR Petroleum
-
National Drilling Company (NDC)UAEOct-14HSE Audit Survey at Onshore & Offshore Rigs
-
National Drilling Company (NDC)UAEOct-15HSE Audit Surveys at Onshore & Offshore Rigs
-
NDC National Drilling CompanyUAEOct-17HSE Audit at Onshore and Offshore Rigs
-
ZADCO Zakum Development CompanyUAEOct-12Provide HSECES Services on Upper Zakum (South Satellite Platform, North Satellite Platform, West Satellite Platform)
-
TAKREER (ADNOC Refining)UAEOct-11Independent Audit Verification for HSECES at ADRD & RRD
Integrity Assessment of Electrical Equipment
-
CLIENTLOCATIONYEARTITLE
-
ADGASUAESep-17ADGAS-LNG Trains Operational Life Extension Independent Overall Assessment and Verification
-
Qatar Fertiliser Company (QAFCO)QATAROct-15Consultancy Services for carrying Fitness for Services and Remaining Life Assessment of Ammonia 1 & 2 Equipment and Structure
-
MusanadaUAENov-14Quality and HSE Audit Consultancy pertaining to Schools by Musanada
-
MusanadaUAEJul-16Inspection of Musanada Buildings
-
Thales Advanced Solutions LtdUAESep-16Building Civil Work Quality Audit Support (For Design Review & Site Supervision scope of RFP)
-
Al Khafji Joint OperationSaudi ArabiaNov-15Periodical Condition Monitoring For Electrical Relays & Switchgears
-
Al Khafji Joint OperationSaudi ArabiaJun-11Work Title: Testing and Calibration of Electric Relays at Ratawi Switchgears A1, A2 and 57A, Contract Title: Periodical Condition Monitoring For Electrical Relays & Switchgears
-
Al Khafji Joint OperationSaudi ArabiaDec-12Work Title: Testing and Calibration of Electric Relays at Switchgears S40, SS1 and SS2, Contract Title: Periodical Condition Monitoring For Electrical Relays & Switchgears
-
Al Khafji Joint OperationSaudi ArabiaJan-13Work Title: Testing and Calibration of Protective Relays at Power plant Switchgears S40, Contract Title: Periodical Condition Monitoring For Electrical Relays & Switchgears
-
Al Khafji Joint OperationSaudi ArabiaNov-15Work Title: Periodical Condition Monitoring For Electrical Relays and Transformer Oil Analysis, Contract Title: Periodical Condition Monitoring For Electrical Relays & Switchgears
-
ORPICOman2016Risk Contributor Assessment Study For MAF Refinery
-
ADOC-Abu Dhabi Oil Co. Ltd. (Japan)UAEFeb-16Basic Engineering Study For Fire Risk Assessment Implementation (Phase-1)
-
AURECONDubai, UAEJul-15Qualitative Risk Assessment for G+10 Apartment Building – Aurecon
-
MOL PAKISTAN OIL AND GAS CO.PakistanJun-15Fire and Gas Equipment audit for MOL Production Facilities
-
Lukoil CompanyUAE27-Oct-13Operation and Maintenance Regulation Development Project
-
Pak Arab Refinery (PARCO)Pakistan2010Protection Relay Coordination Study for Power Distribution System of Pak Arab Refinery (PARCO) Review & Validation of all the Existing Parameters and Recommendation to Improve Relay Coordination
-
THE URBAN UNITPakistanJun-18Detailed Engineering Design of Segregation and Composting Facility Including Resident Construction Supervision
-
Ministry of Textile IndustryPakistanAug-18Consultancy Services for Cotton Ginning Research & Training Institute, Multan.
-
THE URBAN UNITPakistanJun-18Third Party validation of conservation and Restoration of Govt. House Murree
Piping Stress Analysis Projects