Preventive Maintenance Optimization
Dolphin Energy Limited appointed Velosi to carry out Reliability Centered Maintenance (RCM)/ Failure Mode generic maintenance strategy per object type for assets at their Ras Laffan Industrial City (RLIC) onshore facility located in Ras Laffan, Qatar.
Objective
- Velosi has carried out Reliability Centered Maintenance (RCM)/ Failure Mode generic maintenance strategy per object type for assets of Dolphin Energy’s Ras Laffan Industrial City (RLIC) onshore facility to determine the appropriate maintenance tasks to address each of the identified failure modes and their consequences.
Scope of Work
- Perform Reliability Centered Maintenance (RCM) Study
- Failure Mode and Effect Analysis (FMEA),
- Optimize maintenance strategy and tasks list
- Determine task frequency based on failure mode information
- Perform failure mode tasks effectiveness assessment for cost-benefit evaluation
Deliverables
- Detailed Method Statement for full-fledged RCM Study
- Detailed Method Statement for Failure Mode Task List/ Generic Task List based on Object Type
- RCM Report with Results and Attachments:
- Asset Register
- Dominant Failure Modes per Object type
- Failure Mode Scenarios
- Failure Mode Criticality and Equipment Criticality
- PM Task List per Equipment per Failure Mode
- Preventive Maintenance Manpower Requirement
- Critical Spares Review for Full-Fledged RCM Assets
- SAP Templates